| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC Accept |
| 2 | L2₹1.5 Cr+₹5.7 L (3.96%)Rejected-AOC 3 1298 AYYAMPATTI VILLAGE NORTH SALAIGRAMAM ILAYANGUDI 623710 | 623710 | ₹1.5 Cr+₹5.7 L (3.96%) | L2 | Rejected-AOC Reject |
Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
5 Jun 2025, 3:00 pmClosed
Project Director
DRDA, Sivagangai
Upgrdataion/Strengthening of the road 4 No at Singampunari Block in Sivagangai District
2025_RDTN_563021_1
Mgsmt_2025-26_Pkg_20_Re_Tender
Open Tender
Civil Works - Roads
Item Wise
180 days
Sivagangai
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.6 L
28 Jun 2025
29 May 2025
5 Jun 2025
29 May 2025
5 Jun 2025
29 May 2025
Amount
Vadavanpatti Village Road via Drama Stage Km0/0 - 0/45
Existing BT surface picking including cost and conveyance of all Laboue Charges to site etc., complete.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per 10.00 square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminious concrete to 30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for HM stones
Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms per sqm area thickness of the finished surface to level uniform and free from streaks and holes etc.,complete as per MORT &h specification No.803
Providing and erecting of Retro - Reflectorised Cautionary Mandatory and informatory signs
Thittasevalpatti road Km 0/0- 0/5
Existing BT surface picking including cost and conveyance of all Laboue Charges to site etc., complete.
Clearing and grubbing Scrub jungle road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per 10.00 square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminious concrete to 30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for HM stones
Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms per sqm area thickness of the finished surface to level uniform and free from streaks and holes etc.,complete as per MORT &h specification No.803
Providing and erecting of Retro - Reflectorised Cautionary Mandatory and informatory signs
Provision for Pipe culvert
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 20B
Collection and filling of river sand including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.(Below Ground level)
Supply of NP3 900mm dia RCC pipe collar
Supply of NP3 900mm dia RCC pipe collar
Collection and supply of gritty gravel from approved quarry including cost and conveyance to site and all labour charges for filling water and ramming etc., complete for foundation.
Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete
Madurai devakottai road to Saralaikarai road Km 0/0 - 0/6
Existing BT surface picking including cost and conveyance of all Laboue Charges to site etc., complete.
Clearing and grubbing Scrub jungle road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per 10.00 square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminious concrete to 30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for HM stones
Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms per sqm area thickness of the finished surface to level uniform and free from streaks and holes etc.,complete as per MORT &h specification No.803
Providing and erecting of Retro - Reflectorised Cautionary Mandatory and informatory signs
Eriyur - Valayapatti road to Kalungupatti road Km 0/0 - 2/0
Existing BT surface picking including cost and conveyance of all Laboue Charges to site etc., complete.
Clearing and grubbing Scrub jungle road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, water and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire and fuel charges for power roller, water sprinkler and all other incdidental charges such as traffic barricading and providing danger lights etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 2
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per 10.00 square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminious concrete to 30mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Provision for HM stones
Provision for KM stones
Providing and fixing 20mm thick compressible fibre board in expansion joint
Hard bed 580m
km 0/0-1/0 CH 820m
km 1/0-2/0 CH 1250 m
Providing and fixing Tar paper including labour etc.,completed
km 0/0-1/0 CH 820m
km 1/0-2/0 CH 1250 m
Providing and erecting of Retro - Reflectorised Cautionary Mandatory and informatory signs
Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250 gms per sqm area thickness of the finished surface to level uniform and free from streaks and holes etc.,complete as per MORT &h specification No.803
Providing and fixing weepholes of 100mm dia PVC pipes of Required length including all cost and conveyance etc., complted
km 0/0-1/0 CH 820m
km 1/0-2/0 CH 1250 m
Provision for RCC Deck slab culvert
Earth work excavation & Depositing on bank with initial lead of 10m and lift & 2m in hard stiiff clay, stiff black cotton hard red earth shales, murram, gravel stoney earth mixed with small size boulder and in hard gravelly soils per SS 20B
Hard bed 580m
retaining wall @740m
km 0/0-1/0 CH 820m
km 1/0-2/0 CH 1250 m
Cement Concrete 1:2:4 mix using20mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
retaining wall @740m
km 0/0-1/0 CH 820m
km 1/0-2/0 CH 1250 m
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete for foundation
retaining wall @740m
km 0/0-1/0 CH 820m
km 1/0-2/0 CH 1250 m
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.(Below Ground level)
Hard bed 580m
retaining wall @740m
km 0/0-1/0 CH 820m
km 1/0-2/0 CH 1250 m
Centering, shuttering and strutting to the soffits of RCC slabs and beams including cost and conveyance of all materials to site etc., complete.(Above Ground level)
km 0/0 - 1/0 CH 820m
km 1/0 - 2/0 CH 1250m
RCCement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost of conveyance of all materials and all labour charges etc., complete
km 0/0 - 1/0 CH 820m
km 1/0 - 2/0 CH 1250m
Collection and supply of gritty gravel from approved quarry including all cost and conveyance etc.,conveyane etc.,complted
Hard bed 580m
km 0/0 - 1/0 CH 820m
km 1/0 - 2/0 CH 1250m
Supply and fabrication of steel
km 0/0 - 1/0 CH 820m
km 1/0 - 2/0 CH 1250m
RCC 1:1.5:3 mix using 20mm HBGS metal including all cost and conveyance etc.,completed
km 0/0 - 1/0 CH 820m
km 1/0 - 2/0 CH 1250m
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
V BALAN (BID ID -1358970)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .