| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹72.4 LAccepted-AOC | ₹72.4 L Quoted ₹75.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹77.9 LRejected-Finance | ₹77.9 L | L2 | Rejected-Finance L2 |
| 3 | L3₹80.0 LRejected-Finance | ₹80.0 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | SHYAM BASNET L3 | SHREE BINAYAK CONSTRUCTION L1 | M/S SUKDEO CHETTRI L2 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 240 | sqm | 3,504 ₹4,134.72 | 3,357.6 ₹3,961.97 Lowest | 3,412.8 ₹4,027.1 |
| 2.00 | Surface Dressing of the Ground in any kind of soil including removing vegetation inequalities not exceeding 15cm depth and disposal of the rubbish within a lead upto 75m as directed. | 60 | sqm | 696 ₹821.28 | 727.2 ₹858.1 | 678 ₹800.04 Lowest |
| 3.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m
2..8.1 All kinds of soil | 90 | cum | 26,082.9 ₹30,777.82 | 24,674.4 ₹29,115.79 Lowest | 25,408.8 ₹29,982.38 |
| 4.00 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.
i) Ordinary rock | 195 | cum | 1,02,796.2 ₹1,21,299.52 | 98,475 ₹1,16,200.5 Lowest | 1,00,138.35 ₹1,18,163.25 |
| 5.00 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 75 | cum | 7,69,245.75 ₹9,07,709.99 | 7,23,375 ₹8,53,582.5 Lowest | 7,49,353.5 ₹8,84,237.13 |
| 6.00 | Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in
position as directed excluding shuttering if any.
(i) (1:3:6) proportion | 108 | cum | 4,13,925.12 ₹4,88,431.64 | 3,96,439.92 ₹4,67,799.11 Lowest | 4,03,220.16 ₹4,75,799.79 |
| 7.00 | Centering and shuttering including strutting, propping etc. and removal of form for
(a) Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 153.1 | Sqm. | 1,03,227.68 ₹1,21,808.66 | 97,984 ₹1,15,621.12 Lowest | 1,00,557.61 ₹1,18,657.98 |
| 8.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level
5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 463.84 | Kg | 41,880.11 ₹49,418.53 | 39,468.15 ₹46,572.42 Lowest | 40,799.37 ₹48,143.26 |
| 9.00 | Supplying at site (32mm outer & 24mm inner dia) polypropylene (PP) rope gabion (4-strand and mesh size 100mm x 100mm) as per specification, laying along sea/riverside toe of embankment , closing and locking the gabions,inter locking the adjoining gabions, after placement of boulder inside, including cost of all materials (excluding boulder), labours,transportation to site by all means, all leads and lifts complete as per direction of the Engineer-in-charge. Gabion of size 2m (L) x 1m (W) x 1m (H), with intermediate partition at every metre width. | 140 | Nos. | 42,40,222 ₹50,03,461.96 | 40,42,647 ₹47,70,323.46 Lowest | 41,30,560 ₹48,74,060.8 |
| 10.00 | Supply of Boulder above 225 mm including CP & OH charges. | 280 | Cum | 1,09,065.6 ₹1,28,697.41 | 1,02,314.8 ₹1,20,731.46 Lowest | 1,06,246 ₹1,25,370.28 |
Tender Value
₹69.6 L
EMD Value
₹1.4 L
Closing Date
4 Apr 2024, 12:00 pmClosed
DGM (M), PNC Division
Teesta Low Dam-IV Power Station, P.O.- Kalijhora Bazar, Distt - Darjeeling, West Bengal-734008
Protection work near damages at 6.70 KM of NH 10, at Right bank of River Teesta u/s of TLD-IV PS kalijhora
2024_NHPC_800682_1
NH/TLD-IV PS/PNC/W-909/2024/811
Open Tender
Civil Works
Works
45 days
TLD-IV PS, Kalijhora, NHPC Ltd
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,180
NHPC Limited
₹1.4 L
Yes
20 Aug 2026
14 Mar 2024
12 Apr 2024
14 Mar 2024
4 Apr 2024
14 Mar 2024
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].