Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-AOC 3RD FLOOR BNCCI HOUSE 23 R N MUKHERJEE ROAD KOLKATA 1 | KOLKATA | WEST BENGAL | 700001 | L1 | Accepted-AOC aoc | |
| 2 | L2₹1.2 L+₹943.92 (0.76%)Rejected-Finance | L2 | Rejected-Finance STOOD L2 | |
| 3 | L3₹1.3 L+₹5,234 (4.24%)Rejected-Finance KANKARDANGA | L3 | Rejected-Finance STOOD L3 |
| Sl No | Description | Qty | Unit | AMAZE POWER L1 | ADHISHARM INDUSTRIALS L2 | SASTIK ENTERPRISE L3 |
|---|---|---|---|---|---|---|
| 1.00Annual comprehensive maintenance contract of 3 phase , 415 V,50KVA DG Set (Make-Ashok leyland,Engine Model-AL4CTIDG2 ) for CMOH building,Asansol , Paschim Bardhaman. | ||||||
| 2.00 | Comprehensive contact value for 1st year i.e 01.03.2024 to 28.02.2027(i.e 3 Years) | 36 | Months | 2,878 ₹1,03,608 Lowest | 2,900 ₹1,04,400 | 3,000 ₹1,08,000 |
| 3.00 | Add GST @18% On total from item no 1 to 2 to be calculated by bidder. | 1 | item | 18,649 ₹18,649 Lowest | 18,792 ₹18,792 | 19,440 ₹19,440 |
| 4.00 | Add LWC @1% On total from item no 1 to 3 to be calculated by bidder. | 1 | item | 1,223 ₹1,223 Lowest | 1,231.92 ₹1,231.92 | 1,274 ₹1,274 |
| 5.00Terms and conditions for maintenance of 50 KVA Silent DG Set 1. Service Engineer will visit each D.G. SET at site — for checking Engine, Control Panel V Main Alternator 12 ( Twelve) times (once per month) visits in a year commencing from the date of Service Contract. The Vlsit of the Service Engineer will be at an interval of 30 days with a permissible variance of +/-7 days froJn the date of previous visit and checkD.G. SET. The total number of visits in a year on D.G. SET under this clause will not exceed 12 (Twelve) visits. (excluding Breakdown Visits.) | ||||||
| 7.002. Maintenance supervision, correction and tappet setting is in the scope of the contract. | ||||||
| 8.003. Other repairs or Major overhauling / Top overhauling of the engine , Rewinding Main Alternator and its components such as Self-starter, Charging Alternator, FIP, Nozzle, Turbocharger, Radiator, Water Pump, Acoustic, Batteries etc. are beyond the purview and scope of this contract . The cost of repairing & spare parts has to be borne by you. | ||||||
| 9.004. Service engineer will carry scheduled preventative maintenance checks on Diesel Generator Sets as per the standard check list. | ||||||
| 10.005. Attend emergency calls on priority (usually same day). However, if thc engineer is required for any particular date and time, lt Would be the rcsponsibility of the customer to intimate the contractor in advance | ||||||
| 11.006. Alternator bearing/greasing is in the scope of contract. | ||||||
Tender Value
Refer Docs
EMD Value
₹2,500
Closing Date
21 Feb 2024, 5:20 pmClosed
EE.AED.PWD
Office of the Executive Engineer (P.W.D.) Asansol Electrical Division Near Polo Ground Dist Paschim Bardhaman PIN 713304
Annual comprehensive maintenance contract of , 50KVA DG Set (Make Ashok leyland ) at office of the Chief Medical Officer of Health, Asansol , Paschim Bardhaman. W.E.F 01.03.2024 to 28.02.2027 (i.e 03 years)
2024_WBPWD_659824_1
WBPWD/EE/AED /eNIQ-35/2023-24
Open Tender
ELECTRICAL WORKS M/R
Item Rate
1095 days
ASANSOL
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,500
Office of the Executive Engineer P.W.D. Alsanso
1 Sept 2026
2 Feb 2024
23 Feb 2024
2 Feb 2024
21 Feb 2024
10 Feb 2024
8 Feb 2024
Amount
Annual comprehensive maintenance contract of 3 phase , 415 V,50KVA DG Set (Make-Ashok leyland,Engine Model-AL4CTIDG2 ) for CMOH building,Asansol , Paschim Bardhaman.
Comprehensive contact value for 1st year i.e 01.03.2024 to 28.02.2027(i.e 3 Years)
Add GST @18% On total from item no 1 to 2 to be calculated by bidder.
Add LWC @1% On total from item no 1 to 3 to be calculated by bidder.
Terms and conditions for maintenance of 50 KVA Silent DG Set 1. Service Engineer will visit each D.G. SET at site — for checking Engine, Control Panel V Main Alternator 12 ( Twelve) times (once per month) visits in a year commencing from the date of Service Contract. The Vlsit of the Service Engineer will be at an interval of 30 days with a permissible variance of +/-7 days froJn the date of previous visit and checkD.G. SET. The total number of visits in a year on D.G. SET under this clause will not exceed 12 (Twelve) visits. (excluding Breakdown Visits.)
2. Maintenance supervision, correction and tappet setting is in the scope of the contract.
3. Other repairs or Major overhauling / Top overhauling of the engine , Rewinding Main Alternator and its components such as Self-starter, Charging Alternator, FIP, Nozzle, Turbocharger, Radiator, Water Pump, Acoustic, Batteries etc. are beyond the purview and scope of this contract . The cost of repairing & spare parts has to be borne by you.
4. Service engineer will carry scheduled preventative maintenance checks on Diesel Generator Sets as per the standard check list.
5. Attend emergency calls on priority (usually same day). However, if thc engineer is required for any particular date and time, lt Would be the rcsponsibility of the customer to intimate the contractor in advance
6. Alternator bearing/greasing is in the scope of contract.
7. Supply parts rcquired for emergency on to be on priority with customer's approval.
8. To check the condition of diodes/ rotating rectifier assembly once in six month.
9. Checking of all electrical connections Alternators and battery clamps.for their proper tightness including charging alternator and battery clamps.
10. Train the customer's representative on Operation and Maintenance of DG set 50 KVA.
11. Service Engineer during the visit will report on the performance or any other abnormality and inform parts requirement, shall also submit the report on work done and recommandations as well as spare parts offers procurement.
12.Coustomer will not bear the colt involved for transportation cost of service engineer/engineers.
13.Visits Of service engineer will be acknowledged by the Lodge manager by signing the service report.
14.Service offered under this contract is in accordance with the engine manufacturers standard Service recommendation and practices.
15.Maintain record of maintenance, failure and its corrective actions taken. Suggestions/ recommendations for improved performance of the DG Sets shall be implemented by the customer with immediate effect.
ADHISHARM INDUSTRIALS
SASTIK ENTERPRISE
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .