Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14,400Admitted-Finance | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | City Engineering Works L1 |
|---|---|---|---|---|
| 1.00 | Dissembling of Submersible pumping equipment by way of disengaging the pump part form the unit. The job involves engagement of skilled labour, tools and tackles including shifting of pump and motor to the private workshop for carrying out repairs and back to site after carrying out necessary repairs using private vehicle with all leads and lifts thereof. The job also includes the assembling of the pumping unit the testing of same on full load at site. | 1 | Job | 4,500 ₹4,500 Lowest |
| 2.00 | Complete rewinding of 3 phase Motor of 4000 gph submersible pumping unit by using copper wire of required guage size and quantity. The job includes the cost on account of insulating material like lethroid paper, bamboo sticks, adhesive Tape etc. | 6 | Kgs | 1,650 ₹9,900 Lowest |
Tender Value
₹14,539
Closing Date
10 Jun 2025, 4:00 pmClosed
Executive Engineer Jal Shakti Mechanical Div Sgr
Office of the Executive Engineer Jal Shakti (PHE) Mechanical Division Srinagar
Urgent Mechanical repair works to be carried out for Submersible pumping unit having discharge 4000GPH at WSS MC2 Medical College Srinagar.
2025_PHE_274650_1
PHE/MECH/e-NIT-75 of 03/2025
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
20 days
Medical College 2
As Per NIT
2 documents required · 2 mandatory
₹10
Executive Engineer Jal Shakti Mechanical Div Sgr
6 Aug 2025
20 Mar 2025
11 Jun 2025
20 Mar 2025
10 Jun 2025
20 Mar 2025
Amount
Dissembling of Submersible pumping equipment by way of disengaging the pump part form the unit. The job involves engagement of skilled labour, tools and tackles including shifting of pump and motor to the private workshop for carrying out repairs and back to site after carrying out necessary repairs using private vehicle with all leads and lifts thereof. The job also includes the assembling of the pumping unit the testing of same on full load at site.
Complete rewinding of 3 phase Motor of 4000 gph submersible pumping unit by using copper wire of required guage size and quantity. The job includes the cost on account of insulating material like lethroid paper, bamboo sticks, adhesive Tape etc.
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .