| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC | L1 | Accepted-AOC Technically qualified and L1 bidder. | |
| 2 | L2₹4.1 L+₹5,565 (1.38%)Rejected-AOC | L2 | Rejected-AOC Technically qualified and L2 bidder. | |
| 3 | L3₹4.4 L+₹38,630 (9.57%)Rejected-AOC | L3 | Rejected-AOC Technically qualified and L3 bidder. | |
| 4 | L4₹4.6 L+₹54,020 (13.4%)Rejected-AOC | L4 | Rejected-AOC Technically qualified and L4 bidder. |
Tender Value
₹4.9 L
EMD Value
₹9,770
Closing Date
27 Jul 2023, 1:00 pmClosed
Centre Director, CPP-IPR
CPP-IPR, Sonapur, Kamrup (Metro), Assam
Construction of RCC Cable Trench and associated Civil Works in Sub-Station Campus , CPP-IPR, Nazirakhat, Sonapur-782402
2023_IPR_761253_1
CPP-IPR/TN/CES/C/23-24/03
Limited
Civil Works - Buildings
Works
45 days
CPP-IPR, Sonapur
Please refer tender documents.
2 documents required · 2 mandatory
₹0
₹9,770
7 Aug 2023
11 Jul 2023
28 Jul 2023
11 Jul 2023
27 Jul 2023
18 Jul 2023
11 Jul 2023 - 16 Jul 2023
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as as per direction of Engineer-in-charge., within a lead of 50 m. All kinds of soil.
Supplying and filling in plinth/cable trench with sand , including ramming, consolidating and dressing complete as per direction of Engineer-in-charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of formwork for : a) Foundations, footings, bases of columns, etc. for mass concrete
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Shelves (Cast in situ)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding for all level complete . No extra measurement for lapping, wastage etc Thermo-Mechanically Treated bars of grade Fe-500D or more.
Dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete as per direction of Engineer-in-charge.
Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/ 10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand and manufacture as per direction of Engineer-in-charge.
Ganapati Construction
M/S RK ENTERPRISE
NILAM BHARADWAJ
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .