Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.6 L
EMD Value
₹3,200
Closing Date
30 Aug 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER REW PULWAMA
EXECUTIVE ENGINEER REW PULWAMA
Construction of Protection Bund with Lane near L/O Ab salaam Mir to H/O Mushtaq Mir to Gh Rasool Bhat and others at Gulshanpora.
2022_RDPR_185017_7
e- NIT No. 95/2022-23 Dated 22-08-2022
Open Tender
Civil Works
Item Rate
30 days
Pulwama
Please refer Tender documents.
6 documents required · 6 mandatory
₹200
EXECUTIVE ENGINEER REW PULWAMA
₹3,200
31 Aug 2022
22 Aug 2022
31 Aug 2022
22 Aug 2022
30 Aug 2022
22 Aug 2022
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:
Providing and laying of stone soling hand packed tightly , Including carriage of 15 kms
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
12 mm Thick Plaster in 1 :4 Mix
Centering and shuttering including strutting, propping etc. and removal of form work for: 4.6.1 Foundations, footings, bases for columns
Head Load of all key Materials for an avg lead of 700 mts ie cement
Head Load of all key Materials for an avg lead of 700 mts ie Sand
Head Load of all key Materials for an avg lead of 700 mts ie Agg
Head Load of all key Materials for an avg lead of 700 mts ie Solling and plum
Carriage of different Materials by MT ie Cement
Carriage of different Materials by MT ie Sand From 35 Kms
Carriage of different Materials by MT ie Agg From 25 Kms
Carriage of different Materials by MT ie Solling and Plum From 10 Kms
Provision for sign board and photogrphs , other unforseen items , Carriage of cement, etc and 1% contengency charges
GHULAM MOHD MIR
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .