| 1 | L1₹58.1 LAccepted-AOC 138 SEC 21 A MANDI GOBINDGARH | ₹58.1 L | L1 | Accepted-AOC Lowest Quoted Amount |
Tender Value
₹59.0 L
EMD Value
₹1.2 L
Closing Date
26 Feb 2026, 12:00 pmClosed
DSCO Keshav Kumar
Opposite Aggarwal Hospital, Kishanpura Road, Sangrur
Laying and Jointing of RCC UGPL Works, Fixing of ARV, AAV, GV/Sluice Valves, Construction of Haudies and all other allied works.
2025_DOA_156596_5
DSWC/SGR/2025-26/20/A
Open Tender
Pipe Laying Works
365 days
Sangrur
Please refer tender documents.
3 documents required · 3 mandatory
₹2,000
₹1.2 L
16 Apr 2026
18 Feb 2026
26 Feb 2026
18 Feb 2026
26 Feb 2026
18 Feb 2026
FINANCIAL BID NO.: DSWC/SGR/2025-26/20A
Rates for Civil Works (Approved by CCS Punjab Chandigarh)
Name of the Firm/Bidder
Phone Number of Bidder Email id of Bidder
Total Estimated Amount of Work Rs.
Quoted by Contractor (As % less of Estimated Amount) Quote (+/-%)
Note: Please quote only figure (upto 2 decimal points) in above blue colour box in minus or plus. Do not put %age sign after this figure. Please check Quoted Rate in Next cell.
Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 300 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Kheri (C/o 2720/L), Tehsil and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 2969.7 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. /Mtrs 84 Eighty Four Rupees And Zero Paisa Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 1042 /Joints 117.16 One Hundred Seventeen Rupees And Sixteen Paisa Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (300 mm) 19 /Cut hole 75 Seventy Five Rupees And Zero Paisa Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 8 /Cut hole 41 Forty One Rupees And Zero Paisa Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (300 mm) 19 /Riser & Valve 488.89 Four Hundred Eighty Eight Rupees And Eighty Nine Paisa Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) 8 /Air pipe Two Hundred Eighty Eight Rupees And Fifty Three Paisa Only
Fixing of Gate valves with C.C 1:2:4 (300 mm) 6 /Gate Valve 1455.81 One Thousand Four Hundred Fifty Five Rupees And Eighty One Paisa Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Eighty Six Only
B.B.C 1:8:16 0.6 cum 3877.5 Three Thousand Eight Hundred Seventy Seven Rupees And Fifty Paisa Only
Plain Cement Concrete 1:2:4 0.14 cum 5117.37 Five Thousand One Hundered Seventeen Rupees And Thirty Seven Paisa Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum Four Thousand Forty Eight Rupees And Thirty Nine Paisa Only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.21 Two Hundred Two Rupees And Twenty One Paisa Only
RCC Slab 1:2:4 0.21 cum 8212.99 Eight Thousand Two Hundred Twelve Rupees And Ninty Nine Paisa Only
Foot rest (Item No. 29.37) 6 No 100 One Hundred Rupees And Zero Paisa Only
Total Cost for ONE Haudi
Total Cost for Five Haudis
Cost of Other Items
Providing and Fixing of jaal 1 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 1 each 4000 Rupees Three Thousand Only
Nimar for jointing the pipe 81.69 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 143.987 Ton One Hundred Sixty Rupees And Thirty Paisa Only
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 600 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Kular Khurd (C/o 95190/TR Extension) Tehsil-Sunam, District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 2246.4 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. /Mtrs 74 Rupee Seventy Four Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 468 /Joints Rupees Three Hundred Thirty One and Fifty Eight Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (600 mm) 7 /Cut hole 150 One Hundred Fifty Rupees And Zero Paisa Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 6 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 600 mm) 7 /Riser & Valve 946.06 Nine Hundred Forty Six Rupees And Six Paisa Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) 6 /Air pipe Two Hundred Eighty Four Rupees And Eighty Five Paisa Only
Fixing of Gate valves with C.C 1:2:4 (600 mm) 1 /Gate Valve Two Thousand Seven Hundered Forty Six Rupees And Twenty Four Paisa Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 86 Rupees Eighty Six Only
B.B.C 1:8:16 0.6 cum 3849.42 Three Thousand Eight Hundred Forty Nine Rupees And Forty Two Paisa Only
Plain Cement Concrete 1:2:4 0.14 cum 5047.72 Five Thousand Forty Seven Rupees And Seventy two Paisa Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5034.32 Four Thousand Thirty Four Rupees And Thirty two Paisa Only
12.5 mm thick cement plaster work 1:4 15.32 cum 201.29 Two Hundred One Rupees And Twenty Nine Paisa Only
RCC Slab 1:2:4 0.21 cum 8149.18 Eight Thousand One Hundred Forty Nine Rupees And Eighteen Paisa Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for Two Haudis
Cost of Other Items
Providing and Fixing of jaal 1 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 1 each 4000 Rupees Three Thousand Only
Nimar for jointing the pipe 159.588 Kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 236 Ton 209.29 Two Hundred Nine Rupees And Twenty Nine Paisa Only
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 400 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Sheron (C/o 120500/R Extension), Tehsil Sunam and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1929.02 /Cum 93.78 Rupees Ninty Three and Seventy Eight Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 1299 /Mtrs 71 Rupee Seventy One Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 520 /Joints 211.53 Rupees Two Hundred eleven and fifty three Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (400 mm) 13 /Cut hole 105 Rupees One Hundred Five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 9 /Cut hole 41 Rupees Forty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (400mm) /Riser & Valve 732.16 Rupees Seven Hundred thirty two and sixteen paisa only
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 9 /Air pipe Rupees two hundred nignty eight and seventy two paisa only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninty Three and Seventy Eight Only
B.B.C 1:8:16 0.6 cum 3860.45 Rupees Three Thousand Eight Hundred Sixty and Fourty Five Paise Only
Plain Cement Concrete 1:2:4 0.14 cum 5070.54 Rupees Five Thousand seventy and Fifty Four Paise Only
First Class burnt brick work laid in Cement sand mortar in 1:5 in foundation and plinth 4.75 cum Rupees five thousand fourty five and twenty seven paisa only
12.5 mm thick cement plaster work 1:4 15.32 cum 202.5 Rupees two hundred and fifty paisa only
RCC Slab 1:2:4 0.21 cum 8170.24 Rupees Eight Thousand One Hundred seventy and twenty four Paise Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for One Haudis
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only 0
Sign Board (5' X 3') 1 each 4000 Rupees Four Thousand Only
Fixing of gate valve (400 mm) 2 each 2077.17 Rupees Two Thousand seventy seven and seventeen paisa Only
Road Cut 0 no. 15000 Rupees Sixty Only
Nimar for jointing the pipe 71.86 Per kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 128.33 per tonnes 172.94 Rupees one hundred seventy two and ninty four only
Sub Total (A+B+C)
Total Credit of Damaged Lined Water Channel Existing on Site to be Deducted from the Bill of Agency 0
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 600 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - DUGGAN (C/o 49060/L Extention), Tehsil:-Sangrur, District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1161.6 /Cum 93.78 Rupees Ninty Three and Seventy Eight Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 605 /Mtrs 74 Rupee Seventy Six Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 242 /Joints 332.17 Three Hundred Thirty Two Rupees And Seventeen Paisa Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (600 mm) 6 /Cut hole 150 One Hundred Fifty Rupees And Zero Paisa Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 5 /Cut hole 41 Forty One Rupees And Zero Paisa Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (600mm) 6 /Riser & Valve 949.98 Nine Hundred Fourty Nine Rupees And Ninety Eight Paisa Only
Fixing of gate valve (600 mm) 2 each 2750.16 Two Thousand Seven Hundred Fifty Rupees And Sixteen Paisa Only
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 5 /Air pipe 286.08 Two Hundred Eighty Six Rupees And Eight Paisa Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninty Three and Seventy Eight Only
B.B.C 1:8:16 0.6 cum 3857.74 Three Thousand Eight Hundred Fifty Seven Rupees And Seventy Four Only
Plain Cement Concrete 1:2:4 0.14 cum Five Thousand Seventy Rupees And Seventy Seven Paisa Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 4559.43 Four Thousand Five Hundred Fifty Nine Rupees And Fourty Three Paisa Only
12.5 mm thick cement plaster work 1:4 15.32 cum 201.57 Two Hundred One Rupees And Fifteen Seven Paisa Only
RCC Slab 1:2:4 0.21 cum 8170.23 Eight Thousand One Hundred Seventy Rupees And Twenty Three Paisa Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for 1 Haudis (B)
Cost of Other Items C
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 0 each 4000 Rupees Four Thousand Only
Nimar for jointing the pipe 82.522 Per kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 122.5 per tonnes 209.86 Two Hundred Nine Rupees And Eighty Six Paisa Only
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 500 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - UBBAWAL (C/o 91490/91525 -R)(Extension), Tehsil-Sangrur and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 2502.75 /Cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 1420 /Mtrs 71 Rupee Seventy One Only 100820
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 568 /Joints 298.49 Rupees Two Hundred Ninety Eight and Fouty Nine Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (500 mm) 12 /Cut hole 127 Rupees One Hundred Twenty Seven Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 6 /Cut hole 41 Rupees Fourty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (500 mm) 12 /Riser & Valve 890.18 Rupees Eight Hundred Ninty and Eighteen Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150 mm) 6 /Air pipe 286.08 Rupees Two Hundred Eighty Six and Eight Paise Only
Fixing of Gate valves with C.C 1:2:4 (500 mm) 3 /Gate Valve Rupees Two Thousand Two Hundred Seventy Three and Fifty Five Paise Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninty Three and Seventy Eight Only 750.24
B.B.C 1:8:16 0.6 cum 3857.74 Three Thousand Eight Hundred Fifty Seven Rupees And Seventy Four Only
Plain Cement Concrete 1:2:4 0.14 cum Five Thousand Seventy Rupees And Seventy Seven Paisa Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 4559.43 Four Thousand Five Hundred Fifty Nine Rupees And Fourty Three Paisa Only
12.5 mm thick cement plaster work 1:4 15.32 cum 201.57 Two Hundred One Rupees And Fifteen Seven Paisa Only
RCC Slab 1:2:4 0.21 cum 8170.23 Eight Thousand One Hundred Seventy Rupees And Twenty Three Paisa Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only 600
Total Cost for ONE Haudi
Total Cost for ONE Haudis B
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only 0
Sign Board (5' X 3') 0 each 4000 Rupees Three Thousand Only 0
Road Cut 0 each 15000 Rupees Fifteen Thousand Only 0
Nimar for jointing the pipe 119.962 Kg 60 Rupees Sixty Only 7197.72
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2020 219.268 Ton 209.86 Rupees Two Hundred Nine and Eighty Six Paise Only
Total Credit of Damaged Lined Water Channel Existing on Site to be Deducted from the Bill of Agency -21563
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline, lowering and jointing of 400 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Bir kalan (C/o 154970/L Ext Tehsil Sunam and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 2153.25 /Cum 93.78 Rupees Ninty Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 1450 /Mtrs 71 Rupee Seventy One Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 580 /Joints 209.64 Rupees Two Hundred Nine and Sixty Four Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (400 mm) 19 /Cut hole 105 Rupees One hundered Five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 6 /Cut hole 41 Rupees Forty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (400mm) 19 /Riser & Valve 717.35 Rupees Seven Hundred seventeen and thirty five Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 6 /Air pipe Rupees Two Hundred ninety two and Twenty two Paise Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninty Three and Seventy Eight Paise Only 750.24
B.B.C 1:8:16 0.6 cum 3985.02 Rupees Three Thousand nine Hundred eighty five and Zero two Paise Only
Plain Cement Concrete 1:2:4 0.14 cum Rupees Five Thousand Fifty Eight and Eighty six Paise Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum Rupees Four Thousand Five hunderd Sixty Five and Fifteen Paise Only
12.5 mm thick cement plaster work 1:4 15.32 cum 207.65 Rupees Two Hundred Sevan and Sixty Five Paise Only
RCC Slab 1:2:4 0.21 cum 8175.32 Rupees Seven Thousand Seven Hundred Fifty Five and Forty One Paise Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only 600
Total Cost for ONE Haudi
Total Cost for three Haudis 93096
Cost of Other Items
Providing and Fixing of jaal 1 each 4000 Rupees Four Thousand Only 4000
Sign Board (5' X 3') 1 each 4000 Rupees Four Thousand Only 4000
Fixing of gate valve (400 mm) 4 each 2062.25 Rupees Two Thousand sixty two and Seventy twenty five Paise Only 8249
Nimar for jointing the pipe (400mm) 80.04 Per kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 143.96 per tonnes 172.94 Rupees One Hundred Seventy Two and Ninty Four paise only
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline, lowering and jointing of 400 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Cheema (C/o 136575/R Ext Tehsil Sunam and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1113.75 /Cum 93.78 Rupees Ninty Three and Seventy Eight Paise Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 750 /Mtrs 71 Rupee Seventy One Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 300 /Joints 207.36 Rupees Two Hundred sevan and thirty Six Paise Only
Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (400mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 0 /Meter 2777.03 Rupees Two Thousand Seven Hundered Seventy Seven and Three Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (400 mm) 7 /Cut hole 105 Rupees One hundered Five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 3 /Cut hole 41 Rupees Forty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (400mm) 7 /Riser & Valve 704.8 Rupees Seven Hundred four and eighty Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 3 /Air pipe 286.81 Rupees Two Hundred eighty six And Eighty one Paise Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 86 Rupees Eighty Six Only 688
B.B.C 1:8:16 0.6 cum 3985.02 Rupees Three Thousand Ninety Hundred Eighty five and Zero two Paise Only
Plain Cement Concrete 1:2:4 0.14 cum Rupees Five Thousand Fifty and Eight Six Paise Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 4541.3 Rupees Four Thousand foty one and thirty Paise Only
12.5 mm thick cement plaster work 1:4 15.32 cum 203.83 Rupees Two Hundred three and Eight three Paise Only
RCC Slab 1:2:4 0.21 cum 8175.32 Rupees Eight Thousand one Hundred seventy Five and three two Paise Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only 600
Total Cost for ONE Haudi
Total Cost for One Haudis 30797
Cost of Other Items
Providing and Fixing of jaal 1 each 4000 Rupees Four Thousand Only 4000
Sign Board (5' X 3') 1 each 4000 Rupees Four Thousand Only 4000
Fixing of gate valve (400 mm) 1 each 2048.75 Rupees Two Thousand Forty Eight and Seventy Five Paise Only 2048.75
Nimar for jointing the pipe (400mm) 41.4 Per kg 60 Rupees Sixty Only 2484
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 74.176 per tonnes 172.94 Rupees One Hundred Seventy Two and Ninty Four paise only
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 350 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - MANDER KHURD (C/o 1411/R), Tehsil and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 3303.3 /Cum 93.78 Rupees Ninty Three and Seventy Eight Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 2420 /Mtrs 76 Rupee Seventy Six Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 968 /Joints 160.51 Rupees One Hundred Sixty and Fifty one Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (350 mm) 16 /Cut hole 95 Rupees Ninty Five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 12 /Cut hole 41 Rupees Forty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (350mm) 16 /Riser & Valve Rupees Five hundred Sixty Eight and Twenty Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 12 /Air pipe Rupees Two Hundred Eighty Six and Sixty Paise Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninty Three and Seventy Eight Only
B.B.C 1:8:16 0.6 cum 3861.45 Rupees Three Thousand Eight Hundred Sixty One and Fourty Five Paise Only
Plain Cement Concrete 1:2:4 0.14 cum 5080.83 Rupees Five Thousand Eighty and Eighty Three Paise Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5041.28 Rupees Five Thousand Fourty One and Twenty Eight Paise Only
12.5 mm thick cement plaster work 1:4 15.32 cum 201.79 Rupees Two Hundred One and Seventy Nine Only
RCC Slab 1:2:4 0.21 cum 8179.41 Rupees Eight Thousand One Hundred Seventy Nine and Fourty One Paise Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for ZERO Haudis (B)
Cost of Other Items
Providing and Fixing of jaal 0 each 4000 Rupees Four Thousand Only 0
Sign Board (5' X 3') 0 each 4000 Rupees Four Thousand Only 0
Fixing of gate valve (350 mm) 3 each 1734.19 Rupees One Thousand Seven Hundred Thirty Four and Nineteen Paise Only 5202.57
Nimar for jointing the pipe 89.056 Per kg 60 Rupees Sixty Only 5343.36
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 210.816 per tonnes 172.94 Rupees One Hundred Seventy Two and Ninty Four paise only
Sub Total (A+B+C)
Total Credit of Damaged Lined Water Channel Existing on Site to be Deducted from the Bill of Agency 10101
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 300 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village -Basiark (C/o 9600/R), Tehsil-Bhawanigarh and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 4001.4 /Cum 93.78 Rupees Ninety three and seventy eight paise only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 3510 /Mtrs 84 Rupee Eighty Four Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 1404 /Joints 116.89 Rupees One Hundred Sixteen and Eighty Nine Paise Only
Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (450mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 10 /Meter 1355.86 Rupees One thousand Three hundred Fifty Five and Eighty Six Paise Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (300 mm) 27 /Cut hole 75 Rupees Seventy Five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 8 /Cut hole 41 Rupees Forty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (450mm) 27 /Riser & Valve 486.61 Rupees Four Hundred Eighty Six and Sixty One Paise Only
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 8 /Air pipe Rupees Two Hundred Eighty Seven and Nine Paise Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninety Three and Seventy Eight Paise Only
B.B.C 1:8:16 0.6 cum 3865.3 Rupees Three Thousand Eight Hundred Sixty Five And Thirty Paise Only
Plain Cement Concrete 1:2:4 0.14 cum 5090.53 Rupees Five Thousand Ninty and Fifty Three Paise Only
First Class burnt brick work laid in Cement sand mortar in 1:4 in foundation and plinth 4.75 cum 5042.76 Rupees Five Thousand Forty Two And Seventy Six Paise Only
12.5 mm thick cement plaster work 1:4 15.32 cum 201.92 Rupees Two Hundred One and Ninty Two Paise Only
RCC Slab 1:2:4 0.21 cum 8188.25 Rupees Eight Thousand One Hundred Eighty Eight and Twenty Five Paise Only
Foot rest (Item No. 29.37) 6 No 100 Rupees One Hundred Only
Total Cost for ONE Haudi
Total Cost for Seven Haudis
Cost of Other Items
Providing and Fixing of jaal 1 each 4000 Rupees Four Thousand Only
Sign Board (5' X 3') 1 each 4000 Rupees Four Thousand Only
Fixing of gate valve (300 mm) 7 each 1453.53 Rupees One Thousand Four Hundred Fifty Three and Fifty Three Paise Only
Nimar for jointing the pipe 110.074 Per kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 194.129 per tonnes Rupees One Hundred Sixty and Thirty paise only
Grand Total Credit of Damaged Lined Water Channel Existing on Site to be Deducted from the Bill of Agency 22471
Name of Work :- Earth work for excavation of Trenches for laying of Underground pipeline , lowering and jointing of 300 mm Dia RCC Pipes, fixing of AVP , Risers, Construction of Haudies at Village - Tunga (C/o 9420/L), Tehsil Sangrur and District- Sangrur.
Item of Work Quantity Unit Rate in (Rupees) Total in Rupees
Earth work in Excavation in trenches not exceeding 2 m depth including dressing Bottom & sides of trenches, stacking the excavated Soil Clear from the edge of excavation & subsequent filling around layed pipes in 15 cm layer with compaction including disposal of all surplus soil as directed within a lead of 30 meters. 1026 /Cum 93.78 Rupees Ninty Three and Seventy Eight Only
Lowering of R.C.C. Class NP-2 Pipes in to trenches for all depths and laying out the same to correct alignment ,gradients level etc. 900 /Mtrs 84 Rupee Seventy One Only
Jointing of class N.P.2 R.C.C pipes in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge . 360 /Joints 116.66 Rupees Two Hundred Nine and Fouty seven Paise Only
Supplying, Lowering and Jointing of class N.P.-3 R.C.C pipes (300mm) in trenches using collar joints jointed with 1:2 1/2 Cement sand mortar including facing trowelling and finishing the joints at the angle of 45 degree with faces of collars keeping joints w.e.f till cured, testing the drain lines or leakage and making good all leakage and defects to the satisfaction site incharge. (Through Rate) 0 /Meter 2000 Rupees Two Thousand Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (300 mm) 8 /Cut hole 75 Rupees Seventy Five Only
Cutting reinforcement ,Concrete pipes, chipping & finishing the cut surface to a uniform shape the satisfaction of site incharge (150 mm) 7 /Cut hole 41 Rupees Forty One Only
Fixing of Riser Pipe & Fixing of Alfa Alfa valves with C.C 1:2:4 (300mm) 8 /Riser & Valve 484.37 Rupees Four Hundred Eighty Four and Thirty Seven Paise
Fixing of Air vent Pipes with C.C 1:2:4 (150mm) 7 /Air pipe 285.75 Rupees Two Hundred Eighty Five and Seventy Five Paise Only
Estimate of Charges for Haudi (1.20 X 1.20 X 3 m)
Earth work in Excavation 8 cum 93.78 Rupees Ninty Three and Seventy Eight Paisa Only
B.B.C 1:8:16 0.6 cum 3861.45 RupeesThree Thousand, Eight Hundred Sixty One and Fouty Five Paise Only
Plain Cement Concrete 1:2:4 0.144 cum 5080.83 Rupees Five Thousand Eighty and Eighty Three Paise Only
First Class burnt brick work laid in Cement sand mortar in 1:5 in foundation and plinth 4.75 cum 5041.28 Rupees Five Thousand Forty One and Forty One Paise Only
12.5 mm thick cement plaster work 1:4 15.32 cum 201.79 Rupees Two hundred one and Seventy Nine paisa only
R.C.C SLAB 1:2:4 0.21 CUM 8179.41 Rupess Eight Thousand, One Hundred Seventy Nine and Forty Nine paisa only
FOOTREST 6 NOS 100 Rupees One humdred Only
Total Cost for ONE Haudi
Total Cost for Six No. Haudi's (B)
Cost of Other Items
Providing and Fixing of jaal 0 each 3000 Rupees Three Thousand Only
Sign Board (5' X 3') 0 each 3000 Rupees Three Thousand Only
Fixing of gate valve (300 mm) 3 each 1451.32 Rupees One Thousand, Four Hundred Fifty One and Thirty Two Paise Only
Nimar for jointing the pipe 28.224 Per kg 60 Rupees Sixty Only
Provision for Carriage of Pipe for lead upto 2 Km (Subjected to actual site condition, given as per actual measurements provided by the site incharge or the Santioned amount in tender whichever is less) as per CSR 5.2 (13 b,c,d) of 2013 49.868 per tonnes Rupees One Hundred Sixty and Thirty paise only
Grand Total (A+B+C+D+E+F+G+H+I+J+K)
Grand Total Credit of Damaged Lined Water Channel Existing on Site to be Deducted from the Bill of Agency
stage.html
html • 0.04 MB
technical_326763.pdf
techsummary_326763.pdf
finance_326763.pdf
finsummary_326763.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
NITUGPL252620A.pdf
Tender Documents • 0.50 MB
DNITUGPL252620A.pdf
Tender Documents • 1.16 MB
FBUGPL252620A.xls
Additional Documents • 0.20 MB
Download all tender documents and submit your bid