Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
Closing Date
20 Oct 2026, 12:00 pm2d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Bangalore International Airport Limited
Published by the portal on this tender, for queries and grievance redressal.
BIAL invites quotations from eligible bidders for Supply and installation of Vestibule gate mats for T2 Gates as per approved design and specification.
RFX0000826
SERVICES, DOOR MATS
Karnataka
12 Oct 2026
12 Oct 2026
12 Oct 2026
12 Oct 2026 - 14 Oct 2026
Technical Specification: Supply of Vestibule Gate Floor Mats at Terminal 2 Scope of Work Supply, including transportation, of heavy-duty floor mats at designated vestibule gate locations across the Terminal 2 building, complete in all respects as per the instructions of the Site In-Charge. Technical Specifications 1.Thickness: 12mm 2. Application : Recessed surface installation 3. Colour: As per approved sample 5. Material Composition:Aluminum alloy interlocking base, Carpet layer, foam sheet backing. 6. Dimensions: Profile Width: 27 mm, Profile Depth: 12 mm 7. Load Capacity: Minimum 1000KG/SQM 8. Performance Requirements The floor mat system shall: Withstand temperatures ranging from 40°C to 140°C. Be suitable for high-footfall passenger areas. Accommodate continuous movement of passenger trolleys, baggage carts, and service equipment. Be capable of supporting maintenance and access equipment, including: Scissor Lift Dingli Lift Spider Lift 9. Edge Protection All exposed edges shall be protected with high-strength Stainless steel square tube to prevent damage and ensure user safety.
Installation Scope Transportation of materials to site. Installation of floor mats, including all necessary cutting and trimming to suit the required site dimensions. Provision of standard termination, edge finishing, and alignment to ensure a neat and professional appearance. Each gate mat shall be fabricated in six (6) separate sections and installed as per the approved design and site conditions. Positioning and installation of the six sections shall be carried out strictly in accordance with the instructions of the Site In-Charge. Complete execution of the work, including fitting, finishing, and site clearance, to the satisfaction of the Site In-Charge.
GENERAL TERMS & CONDITIONS
Vendor to submit the material samples for approval before execution (Material approval form to be signed by vendor and project in charge
Any variation in BOQ needs to be bought to immediate attention of Project in charge
Vendor to submit all material test certificates as requested by BIAL and materials can be subjected to random tests at site.
Vendor to share work schedule before initiation of works
Vendor to submit quality checklist along with invoice and measurement sheet
Vendor to share barricade methodology ( as per site requirement) before initiating the works
Vendor to submit shop drawings, as per request of project incharge
Site should be kept clean at end of day's work by vendor
Any damage to exsiting infrastructure during work execution needs to be rectified by vendor immediately without any extra cost
All safety measures shall be adhered to all safety tools/ accessories shall be used properly
Vendor to have a safety incharge at site snd safety checklist shall be submitted along with invoice
Completion certificate will be issued only after completion of all works as per PO and same shall be part of final invoice for certification
Description
Whether site visit required by vendor
Whether vendor needs to get AEP to carry out the job
Whether supplied material is under warranty
Whether any shop drawings to be submitted by vendor for approval
Whether MOWP is requried for this works (for works requiring more than 3 days to complete)
Material
Model
DESCRIPTION
whether all works have been completed by vendor as per PO
Whether signed quality checklist is attached along with invoice
Whether signed material approval form is submitted along with invoice
Whether work area is cleared of all debris by vendor
Whether any damages observed at work area done by vendor during work execution
Whether all dismantled materials are handed over to BIAL by vendor (If Any)
Whether any of suppled material under warranty ? If yes, has the vendor submitted the related documents
Whether inspection reports (IR) submitted for all materials
Proposed completion date
Actual completion date
Reason for delay, if any (Should LD clause be applied as per PO terms)
LOCTION
Passenger Exit gates
Gate no 4
Gate no 3
Gate no 2
Gate no 1
Departure Vestibule Gates
Gate no 3
Gate no 2
Gate no 1
Connecting Corridor C1 C2 (CC1)
Connecting Corridor C5 C6 (CC2)
Domestic Bus Gates Smoking area entrance
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
RFQ_Commercial.pdf
Guideline • 1.50 MB
Query_Format.pdf
Guideline • 0.03 MB
Scope, Images and Quantity of works.xlsx
Guideline • 0.64 MB
RFX0000826 -Guidelines.docx
Guideline • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .