Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.7 LAccepted-AOC | L1 | Accepted-AOC FOUND 1ST LOWEST | |
| 2 | L2₹24.0 L+₹28,386.08 (1.20%)Rejected-AOC | L2 | Rejected-AOC FOUND 2ND HIGHER | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-EMD/TENDER FEES RECEIPTS, VALIDITY & WORK EXPERIENCE CERTIFICATES NOT SUBMITTED BY FIRM, DUE TO THIS REJECTED. |
Tender Value
₹24 L
EMD Value
₹24,000
Closing Date
4 Sept 2023, 1:00 pmClosed
SUPERINTENDING ENGINEER, EDC, BANDA
Chilla Road, Indira Nagar, Banda
The work of erection and repairing of 33 KV, 11 KV HT/LT Lines at various places, installation of VCB panels, MCCB and earthing work for protection of transformers installed at various 33/11 KV S/Ss under Business Plan 2023-24 under EDD, Banda
2023_DVVNL_831762_1
EDCBNDA-21/2023-24
Open Tender
Electrical Works
Item Rate
90 days
BANDA
As per annexured
2 documents required · 2 mandatory
₹3,540
DVVNL
₹24,000
O/O SE, EDC, BANDA
29 May 2024
30 Aug 2023
4 Sept 2023
30 Aug 2023
4 Sept 2023
30 Aug 2023
2 Sept 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | The following works under various places/Sub-Stations under BUSINESS PLAN SCHEME 2023-24 under EDD, BANDA, including carriage of all required material from ESC Banda to work site, alongwith its loading, unloading & dragging at the respective ends and also safe carriage of old line material/scraped from site to store centre, if any. Some petty Material like all types clamps, cable boxes, Aluminium tape, hoisting clamp/cable hanging U clamps, Danger Board, Number Plate, angle, HDPE/GI Pipes, nut-bolts & washers etc. of appropriate size is to be arranged by contractor on his own cost. The bidder shall be responsible for complete execution of the work under the scope of tender specification. Any work/activity not specifically indicated but is required for systematic execution of job shall be carried out by the contractor without any extra payment. Details of the work as given below ;- | - | - | - | - |
| 1 | Repairing & erecton 33 KV Line work -
Palra to Dohahatra (Bhadoriya Dhaba), Sindhan (Near Turri Naka), Ranipur (Terha Road), Isuli, Sagra Dera, Kaknare Baba, Maharajpur, Kumhariya Dera, Baretha & Near Power House (Jaspura)
Repairing & erecton 11 KV/LT Line work -
Various Places at 33/11 KV Sub-Station, Jamoo, LT Line at Vill. Kabeer Nagar, Chhanehra Lalpur (Tindwari), Nai Basti (Jaspura), Ahiran Dera (Jaspura), Near Tanki (Rampur), Sikahula (Maikusur Baba), Paal Basti (Bhatha), Near School (Bhatha), Amara (Kali Mai), Badagaon, Piprodar, Sabada, Jhanjhri Purwa, Various Places at 33/11 KV Sub-Station, Samgara /Marka | - | - | - | - |
| 2 | Safe cartage of 8.5/9.0/11 Mtr. long PCC/STP poles from store centre or from any other place to the respective site of work. | 310 | No. | - | - |
| 3 | Safe cartage of line material viz. conductor, cable, G.I. earth wire, cross arm, angle, channel, insulator, clamps and other line material from store centre or from any other place to the respective site of work. | 208 | Qtl. | - | - |
| 4 | Erection of SP structure on 8.5/9.0/11 Mtr. long PCC/STP poles, including complete H.T./L.T. fittings as per RESSPO manual and as per direction of Engineer incharge. | 270 | No. | - | - |
| 5 | Grouting of SP structure on 8.5/9.0/11 Mtr. long PCC/STP poles, including complete H.T./L.T. fittings as per RESSPO manual and as per direction of Engineer incharge. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each). | 270 | No. | - | - |
| 6 | Erection of DP structure on 8.5/9.0/11 Mtr. long PCC/STP poles, including complete H.T./L.T. fittings as per RESSPO manual and as per direction of Engineer incharge. | 20 | No. | - | - |
| 7 | Grouting of DP structure on 8.5/9.0/11 Mtr. long PCC/STP poles, including complete H.T./L.T. fittings as per RESSPO manual and as per direction of Engineer incharge. The support shall be grouted with cement, sand and brick ballast/stone ballast in ratio 1:4:8 (0.285 Cu. Mtr. each). | 20 | No. | - | - |
| 8 | Erection and grouting of stay set with nozelling & binding as per norms. | 63 | No. | - | - |
| 9 | Laying, stringing, binding and termination etc. of LT ABC Cable of size (3*95+1*70+1*16) Sq.mm. on the erected poles, including the work of fixing of material like LT clamp, suspension clamp, dead end clamp, I-Hook, PRC etc. as per direction of supervising engineer/RESSPO manual. | 3,500 | Mtr. | - | - |
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Tendernotice_1.pdf
Tender Document • 1.25 MB
1-Tender form _ NIT_ PQC_021.pdf
Tender Document • 1.03 MB
General Conditions of Form-A.pdf
Tender Document • 0.19 MB
SCHEDULE _F_G_H_I_.pdf
Tender Document • 0.19 MB
BOQ_1398416.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .