Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹51.8 LAccepted-AOC | ₹51.8 L Quoted ₹55.3 L | L-1 | Accepted-AOC AOC |
| 2 | L-2₹57.8 LRejected-Finance | ₹57.8 L | L-2 | Rejected-Finance You are L-2 |
| Sl No | Description | Qty | Unit | THE SUBHAM COOPERATIVE LABOUR AND CONSTRUCTION SOCIETY L2 | The Bharti Co-Operative Labour & Construction Society Ltd Panipat L1 |
|---|---|---|---|---|---|
| 1.10NS ITEMS | |||||
| 1.20 | Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with
horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used. | 72,959.72 | Metre | 14 ₹10,21,436.08 | 12 ₹8,75,516.64 Lowest |
| 1.30 | R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarsesand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6 mm bar nibs wherever required as per direction of Engineer-in- charge (cost of earth works in excavation, concrete works in foundation to be paid separately). | 100.87 | cum | 23,000 ₹23,20,010 | 22,000 ₹22,19,140 Lowest |
Tender Value
₹49.7 L
EMD Value
₹99,480
Closing Date
6 Aug 2026, 5:00 pmClosed
Naveen
Municipal Corporation Panipat
Providing and Fixing of RCC Posts/Struts with Barbed Wire Fencing for Plantation and Miscellaneous Municipal Works in MC Panipat. only for L and C Society
2026_HRY_537850_1
20266EAFC5B4 7826 4BD6 AE3B 81E2513EE017286ULB
Open Tender
Civil Works
Works
180 days
Panipat
2 documents required · 2 mandatory
₹5,000
₹99,480
Yes
17 Aug 2026
31 Jul 2026
6 Aug 2026
31 Jul 2026
6 Aug 2026
31 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.1 | NS ITEMS | - | - | - | - |
| 1.2 | Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with
horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used. | 72,959.72 | Metre | 100 | ₹72,95,972 |
| 1.3 | R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarsesand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6 mm bar nibs wherever required as per direction of Engineer-in- charge (cost of earth works in excavation, concrete works in foundation to be paid separately). | 100.87 | cum | 100 | ₹10,087 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
BOQ_617011.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].