Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74,736Accepted-Finance 36 137 THANGAMAPURIPATTINAM METTUR DAM 636 402 | SALEM | TAMIL NADU | 636402 | ₹74,736 | L1 | Accepted-Finance L1 |
| Sl No | Description | Qty | Unit | SRI V M A ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00 | Charges for Dismantling of Terminal Cover and 6 Sets of flexible links in R Phases of 15.75 KV neutral side bus ducts | 1 | Nos | 6,201 ₹6,201 |
| 2.00 | Charges for Dismantling of side support insulator and releasing of existing 4 Nos. Current Transformer CT1, CT2, CT3 & CT4 in R phase neutral side | 1 | Nos | 6,201 ₹6,201 |
| 3.00 | Charges for Assembling all the 4 Nos. Current Transformers in position after replacing the new spare 1 No. Current Transformer CT1, CT2, CT3 (New) & CT4 in R phase neutral side. | 1 | Nos | 6,201 ₹6,201 |
| 4.00 | Charges for Reassembling the support insulators and Reconnecting the 6 Sets of flexible links in all the three phases and tightness checked and reconnected the terminal cover. | 1 | Nos | 6,201 ₹6,201 |
| 5.00 | Charges for Inspection and checking tightness of generator Phase & Neutral side links. | 1 | Nos | 9,414 ₹9,414 |
| 6.00 | Charges for removing the 15.75KV Bus links and connecting shorting bar across the bus for Generator SC test purpose and removing the shorting bar and normalizing the Bus. | 1 | Nos | 39,603 ₹39,603 |
| 7.00 | Cost of consumables | 1 | Nos | 915 ₹915 |
Tender Value
Refer Docs
Closing Date
2 Mar 2026, 2:00 pmClosed
CHIEF ENGINEER/MTPS-I
CHIEF ENGINEER MTPS-I METTUR DAM
MTPS-I ES Circle EM-I Unit III 1. Dismantling of 15.75 KV neutral side bus duct links for releasing the suspected defective anyone neutral side current transformer ,CT,10000 5A ratio and replacing with healthy spare CT and normalising the same
2026_EB_658565_1
CE-MTPSI-SE-ES-EMI-OT148-25-26
Open Tender
Electrical Works
20 days
MTPS-I/METTURDAM
As per tender specification
4 documents required · 4 mandatory
₹0
Yes
4 Jun 2026
16 Feb 2026
3 Mar 2026
16 Feb 2026
2 Mar 2026
16 Feb 2026
Charges for Dismantling of Terminal Cover and 6 Sets of flexible links in R Phases of 15.75 KV neutral side bus ducts
Charges for Dismantling of side support insulator and releasing of existing 4 Nos. Current Transformer CT1, CT2, CT3 & CT4 in R phase neutral side
Charges for Assembling all the 4 Nos. Current Transformers in position after replacing the new spare 1 No. Current Transformer CT1, CT2, CT3 (New) & CT4 in R phase neutral side.
Charges for Reassembling the support insulators and Reconnecting the 6 Sets of flexible links in all the three phases and tightness checked and reconnected the terminal cover.
Charges for Inspection and checking tightness of generator Phase & Neutral side links.
Charges for removing the 15.75KV Bus links and connecting shorting bar across the bus for Generator SC test purpose and removing the shorting bar and normalizing the Bus.
Cost of consumables
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_790363.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid