Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-Finance | L1 | Accepted-Finance QUALIFIED | |
| 2 | L2₹4.8 L+₹56,949.81 (13.6%)Accepted-Finance | L2 | Accepted-Finance QUALIFIED | |
| 3 | L3₹5.4 L+₹1.2 L (27.9%)Accepted-Finance | L3 | Accepted-Finance QUALIFIED |
Tender Value
₹7.2 L
EMD Value
₹21,600
Closing Date
10 Nov 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
WILDLIFE WARDEN KATHUA
near college road forest complex
Construction of 6 Nos Water springs water points Bowli in different locations of Comptt Co 7 9 12 13 14 15 JDR of Surinsar Mansar Wildlife Sanctuary in Wildlife Division Kathua Under CAMPA 2022 23
2022_FD_194817_1
NIT 48 WLW/K OF 2022-23
Open Tender
Civil Works
Item Rate
60 days
Surinsar-Mansar Wildlife Sanctuary
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
WILDLIFE WARDEN KATHUA
₹21,600
11 Nov 2022
4 Nov 2022
11 Nov 2022
4 Nov 2022
10 Nov 2022
4 Nov 2022
Amount
Construction of Water springs, water points (Bowli) Co.7/JDR Earth work in excavation by manual means over areas (Exceeding 30 cm and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:5:10 (1 cement: 5 coarse sand :10 graded stone aggregate 40mm nominal size) (A) Crushed inculding all Mechanical and Head load carriage with complete job
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size inculding all Mechanical and Head load carriage with complete job
Coursed rubble masonry with hard stone in (first or second sort) in superstructure plinth level and up floor five level including curing complete with cement mortor 1:6 (1 cement : 6 coarse sand)
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete 50 mm thick with 20mm nominal size stone aggregate. inculding all Mechanical and Head load carriage with complete job
Pointing on stone work with cement mortor 1:3 (1cement: 3 coarse sand) Rasied cut pointing.
Providing and damp-proof course 50 mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) curing
12 mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) inculding all Mechanical and Head load carriage with complete job
Carriage of materials from source to site of work Including loading, unloading and stacking at site complete job a) Stone av. Distance MT 400 mtr
b) Sand av. Distance 20 Km MT 400 mtr
C) Bajri av. Distance 20 Km MT 400 mtr
Construction of Water springs, water points (Bowli) Co.9/JDR Earth work in excavation by manual means over areas (Exceeding 30 cm and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:5:10 (1 cement: 5 coarse sand :10 graded stone aggregate 40mm nominal size) (A) Crushed inculding all Mechanical and Head load carriage with complete job
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size inculding all Mechanical and Head load carriage with complete job
Coursed rubble masonry with hard stone in (first or second sort) in superstructure plinth level and up floor five level including curing complete with cement mortor 1:6 (1 cement : 6 coarse sand)
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete 50 mm thick with 20mm nominal size stone aggregate. inculding all Mechanical and Head load carriage with complete job
Pointing on stone work with cement mortor 1:3 (1cement: 3 coarse sand) Rasied cut pointing.
Providing and damp-proof course 50 mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) curing
12 mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) inculding all Mechanical and Head load carriage with complete job
Carriage of materials from source to site of work Including loading, unloading and stacking at site complete job a) Stone av. Distance MT 400 mtr
b) Sand av. Distance 20 Km MT 400 mtr
C) Bajri av. Distance 20 Km MT 400 mtr
Construction of Water springs, water points (Bowli) Co.12/JDR Earth work in excavation by manual means over areas (Exceeding 30 cm and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:5:10 (1 cement: 5 coarse sand :10 graded stone aggregate 40mm nominal size) (A) Crushed inculding all Mechanical and Head load carriage with complete job
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size inculding all Mechanical and Head load carriage with complete job
Coursed rubble masonry with hard stone in (first or second sort) in superstructure plinth level and up floor five level including curing complete with cement mortor 1:6 (1 cement : 6 coarse sand)
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete 50 mm thick with 20mm nominal size stone aggregate. inculding all Mechanical and Head load carriage with complete job
Pointing on stone work with cement mortor 1:3 (1cement: 3 coarse sand) Rasied cut pointing.
Providing and damp-proof course 50 mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) curing
12 mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) inculding all Mechanical and Head load carriage with complete job
Carriage of materials from source to site of work Including loading, unloading and stacking at site complete job a) Stone av. Distance MT 400 mtr
b) Sand av. Distance 20 Km MT 400 mtr
C) Bajri av. Distance 20 Km MT 400 mtr
Construction of Water springs, water points (Bowli) Co.13/JDR Earth work in excavation by manual means over areas (Exceeding 30 cm and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:5:10 (1 cement: 5 coarse sand :10 graded stone aggregate 40mm nominal size) (A) Crushed inculding all Mechanical and Head load carriage with complete job
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size inculding all Mechanical and Head load carriage with complete job
Coursed rubble masonry with hard stone in (first or second sort) in superstructure plinth level and up floor five level including curing complete with cement mortor 1:6 (1 cement : 6 coarse sand)
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete 50 mm thick with 20mm nominal size stone aggregate. inculding all Mechanical and Head load carriage with complete job
Pointing on stone work with cement mortor 1:3 (1cement: 3 coarse sand) Rasied cut pointing.
Providing and damp-proof course 50 mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) curing
12 mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) inculding all Mechanical and Head load carriage with complete job
Carriage of materials from source to site of work Including loading, unloading and stacking at site complete job a) Stone av. Distance MT 400 mtr
b) Sand av. Distance 20 Km MT 400 mtr
C) Bajri av. Distance 20 Km MT 400 mtr
Construction of Water springs, water points (Bowli) Co.14/JDR Earth work in excavation by manual means over areas (Exceeding 30 cm and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:5:10 (1 cement: 5 coarse sand :10 graded stone aggregate 40mm nominal size) (A) Crushed inculding all Mechanical and Head load carriage with complete job
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size inculding all Mechanical and Head load carriage with complete job
Coursed rubble masonry with hard stone in (first or second sort) in superstructure plinth level and up floor five level including curing complete with cement mortor 1:6 (1 cement : 6 coarse sand)
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete 50 mm thick with 20mm nominal size stone aggregate. inculding all Mechanical and Head load carriage with complete job
Pointing on stone work with cement mortor 1:3 (1cement: 3 coarse sand) Rasied cut pointing.
Providing and damp-proof course 50 mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) curing
12 mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) inculding all Mechanical and Head load carriage with complete job
Carriage of materials from source to site of work Including loading, unloading and stacking at site complete job a) Stone av. Distance MT 400 mtr
b) Sand av. Distance 20 Km MT 400 mtr
C) Bajri av. Distance 20 Km MT 400 mtr
Construction of Water springs, water points (Bowli) Co.15/JDR Earth work in excavation by manual means over areas (Exceeding 30 cm and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in All kinds of Soil
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:5:10 (1 cement: 5 coarse sand :10 graded stone aggregate 40mm nominal size) (A) Crushed inculding all Mechanical and Head load carriage with complete job
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size inculding all Mechanical and Head load carriage with complete job
Coursed rubble masonry with hard stone in (first or second sort) in superstructure plinth level and up floor five level including curing complete with cement mortor 1:6 (1 cement : 6 coarse sand)
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete 50 mm thick with 20mm nominal size stone aggregate. inculding all Mechanical and Head load carriage with complete job
Pointing on stone work with cement mortor 1:3 (1cement: 3 coarse sand) Rasied cut pointing.
Providing and damp-proof course 50 mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) curing
12 mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) inculding all Mechanical and Head load carriage with complete job
Carriage of materials from source to site of work Including loading, unloading and stacking at site complete job a) Stone av. Distance MT 400 mtr
b) Sand av. Distance 20 Km MT 400 mtr
C) Bajri av. Distance 20 Km MT 400 mtr
M/s Rakesh Kumar
RASHPAL SINGH GOVT CONTRACTOR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .