| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | ₹4.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.1 L+₹22,584 (4.61%)Rejected-AOC | ₹5.1 L+₹22,584 (4.61%) | L2 | Rejected-AOC L2 |
| 3 | L3₹5.2 L+₹27,338 (5.58%)Rejected-AOC NO 3 331 KARTHIGA NAGAR THANKKANKULAM MADURAI 625 006 | MADURAI | MADURAI | TAMIL NADU | 625006 | ₹5.2 L+₹27,338 (5.58%) | L3 | Rejected-AOC L3 |
| 4 | -₹4.9 LRejected-AOC 169 MEENAMBIGAI NAGAR 5TH STREET SUBRAMANIAPURAM MADURAI 625 011 | MADURAI | MADURAI | TAMIL NADU | 625011 | ₹4.9 L | - | Rejected-AOC Work Withdraw |
| Sl No | Description | Qty | Unit | T. Saravanan L3 | YOGEETHA CONSTRUCTION L2 | SPS CONSTRUCTIONS L4 | BAVITHRA BUILDERS L1 |
|---|---|---|---|---|---|---|---|
| 1.01 | Earth work excavation in all kinds of soil except hard rock requiring blasting inclusive of shoring, strutting and bailing out water wherever necessary refilling the sides of foundation with excavated earth in layer of 15 mm thick well rammed and consolidated depositing the surplus earth within compound, clearing and leveling the site with initial lead of 10m etc., and lift of 2m etc., complete. | 22 | m3 | 316 ₹6,952 | 303.67 ₹6,680.7 | 319.01 ₹7,018.24 | 302.1 ₹6,646.2 Lowest |
| 2.01 | Dismntling Reinforced Cement Concrete and Carefully Away from the Site Etc Complete | 3 | m3 | 4,482.1 ₹13,423.89 | 4,306.55 ₹12,898.1 | 4,524.14 ₹13,549.78 | 4,285 ₹12,833.58 Lowest |
| 3.01 | Plain Cement concrete 1:4:8 (One cement four sand and eight aggregates) using 40 mm gauge hard broken granite jelly for foundation wherever necessary etc. complete 1 cum based on SI.No.127 | 1 | m3 | 6,756 ₹6,762.76 | 6,491.4 ₹6,497.89 | 6,819.38 ₹6,826.2 | 6,458.9 ₹6,465.36 Lowest |
| 4.01 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 (Rectangular or Square Column) | 4 | m2 | 1,481.6 ₹5,932.33 | 1,423.48 ₹5,699.61 | 1,495.4 ₹5,987.58 | 1,416.4 ₹5,671.27 Lowest |
| 5.01 | Supplying and erecting shuttering with Necessary supports for plinth beam with all cross bracings etc. complete (RCC column footing plinth beam and lintel sider) Using steelplater and angles S.I.No.155 -10m2 | 17 | m2 | 1,117.2 ₹18,992.4 | 1,073.48 ₹18,249.21 | 1,127.72 ₹19,171.26 | 1,068.1 ₹18,157.7 Lowest |
| 6.01 | Reinforced cement concrete 1:1 1/2:3 (One cement One and Half Sand and Three aggregate) using 20mm machine broken gauge bard granite jelly for RCC works the rate excluding the cost of reinforcement grills,centering and shuttering etc., complete | 10 | m3 | 10,374.9 ₹1,03,750.14 | 9,968.51 ₹99,686.23 | 10,472.17 ₹1,04,722.9 | 9,918.6 ₹99,187.09 Lowest |
| 7.01 | Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also) | 1,000 | kg | 99.3 ₹99,300 | 95.37 ₹95,372.29 | 100.19 ₹1,00,191 | 94.9 ₹94,900 Lowest |
| 8.01 | Brick work in CM 1:5 (one cement five sand) using 2nd class bricks in foundation basement | 15 | m3 | 8,879.8 ₹1,33,181.9 | 8,531.94 ₹1,27,964.62 | 8,963.02 ₹1,34,430.07 | 8,489.3 ₹1,27,325.07 Lowest |
| 9.01 | Fabrication and Supply and fixing of steel door shutter made out of 40 x 40 x 6 mm MS angle section with necessary stiffeners 32 x 6 mm and flats at 30 cm intervals and necessary cross diagonals MS flats. The shutter frame shall be fully covered by 18G CC sheet and provided with required locking facilities and hinges including cost of red oxide primers. | 4 | m2 | 3,017.7 ₹12,070.8 | 2,899.55 ₹11,598.2 | 3,046.05 ₹12,184.2 | 2,885 ₹11,540 Lowest |
| 10.01 | Plastering with Cement 1:5 (one cement and five sand) 12mm thick etc complete | 52 | m2 | 325.4 ₹16,921.45 | 312.69 ₹16,260.69 | 328.49 ₹17,082.27 | 311.1 ₹16,177.82 Lowest |
Tender Value
₹4.9 L
EMD Value
₹4,927
Closing Date
23 Jan 2026, 10:00 amClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai, Thallakulam, Madurai.
Construction of Compound Wall and Providing Culvert at Pillaiyar Kovil Street in Ward No.28.
2026_MAWS_640758_1
Z2 / E1 / EST.515 / 2025-26
Open Tender
Civil Works
Lump-sum
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹4,927
17 Jul 2026
15 Jan 2026
23 Jan 2026
15 Jan 2026
23 Jan 2026
15 Jan 2026
Earth work excavation in all kinds of soil except hard rock requiring blasting inclusive of shoring, strutting and bailing out water wherever necessary refilling the sides of foundation with excavated earth in layer of 15 mm thick well rammed and consolidated depositing the surplus earth within compound, clearing and leveling the site with initial lead of 10m etc., and lift of 2m etc., complete.
Dismntling Reinforced Cement Concrete and Carefully Away from the Site Etc Complete
Plain Cement concrete 1:4:8 (One cement four sand and eight aggregates) using 40 mm gauge hard broken granite jelly for foundation wherever necessary etc. complete 1 cum based on SI.No.127
Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 (Rectangular or Square Column)
Supplying and erecting shuttering with Necessary supports for plinth beam with all cross bracings etc. complete (RCC column footing plinth beam and lintel sider) Using steelplater and angles S.I.No.155 -10m2
Reinforced cement concrete 1:1 1/2:3 (One cement One and Half Sand and Three aggregate) using 20mm machine broken gauge bard granite jelly for RCC works the rate excluding the cost of reinforcement grills,centering and shuttering etc., complete
Supplying fabricating and placing in position of MS grills for reinforcement rate inc. the cost of steel for all works (the rate to include cost of binding wire also)
Brick work in CM 1:5 (one cement five sand) using 2nd class bricks in foundation basement
Fabrication and Supply and fixing of steel door shutter made out of 40 x 40 x 6 mm MS angle section with necessary stiffeners 32 x 6 mm and flats at 30 cm intervals and necessary cross diagonals MS flats. The shutter frame shall be fully covered by 18G CC sheet and provided with required locking facilities and hinges including cost of red oxide primers.
Plastering with Cement 1:5 (one cement and five sand) 12mm thick etc complete
White washing two coats using freshly burnt shell lime, in all floors, including cost of lime and other materials such as brushes, kanjee, scaffolding charges etc., complete
Painting two coats with ready mixed Plastic Emulsion Paint approved quality and colour over a priming coat, including thorough scrapping, clean removal of dirt, etc complete and including necessary plaster of paris, putty, wherever required etc, complete as per standard specification. - 10 sq.m
Add GST 18%
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
BOQ_767346.xls
BOQ • 0.23 MB
1.pdf
Tender Documents • 0.84 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .