Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹82,158.14Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹89,214.61+₹7,056.47 (8.59%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹99,372.71+₹17,214.57 (21.0%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1 L
EMD Value
₹2,000
Closing Date
26 Jun 2026, 6:00 pmClosed
XEW REW UDHAMPUR
XEW REW UDHAMPUR
BOQ
2026_RDPR_312826_4
e-NIT No. 18 REW UDHAMPUR of 2026-27 Dated 18-06-2026
Open Tender
Civil Works
Percentage
30 days
Udhampur
NIT
2 documents required · 2 mandatory
₹600
XEW REW UDHAMPUR
₹2,000
3 Jul 2026
19 Jun 2026
27 Jun 2026
19 Jun 2026
26 Jun 2026
19 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in trench excavation by manual means in in A.K.O.S. with disposal lead upto 1 mtr and lift uto 1.5 mtr in 80% A.K.S & 20% O.R | 2.38 | cum | 568.4 | ₹1,352.79 |
| 2 | P/L in position Cement concrete (1:5:10) 1 cement: 5fine sand: 10graded crushed stone agg. 40 mm excluding the cost of centring & shuttering all work upto plinth level. | 1.24 | cum | 4,826.5 | ₹5,984.86 |
| 3 | P/L in position Cement conc. 1 cement:3fine sand:6graded crushed stone agg. 20 mm excluding the cost of centring & shuttering all work upto plinth level. 80% c.concrete | 3.01 | cum | 5,733.6 | ₹17,258.14 |
| 4 | 20% Boulders | 0.75 | cum | 937.9 | ₹703.43 |
| 5 | P/L of Brick work in super structure using 1:4 mix of cement mortar | 2.23 | cum | 9,027.2 | ₹20,130.66 |
| 6 | P/L in positionReinforced Cement conc. 1 cement:1.5fine sand:3graded crushed stone agg.20nominal size excluding the cost of centring & shuttering for slab. | 0.73 | cum | 9,821.85 | ₹7,169.95 |
| 7 | Providing tar steel reinforcement including cutting bending binding etc all complete | 54.96 | kg | 123.2 | ₹6,771.07 |
| 8 | providing centering and shuttering including struting ,propping etc for foundations | 27.32 | sqm | 286.35 | ₹7,823.08 |
| 9 | Providing centering and shuttering including struting ,propping etc for slab | 1.88 | sqm | 718.2 | ₹1,350.22 |
| 10 | Providing centering and shuttering including propping struting etc. for edges of slab | 7.32 | mtr | 262.2 | ₹1,919.3 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BOQ_1012494.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .