Tender Value
₹19.2 L
EMD Value
₹48,000
Closing Date
11 Mar 2026, 4:00 pmClosed
EE NH Dvn Kalaburagi
Office of EE NH Dvn Kalaburagi
Repair of Minor Bridge Situated at Km 50 100 on NH-150A Hattigudur Tinthani Section in Yadgiri District of Karnataka State for the year 2025 26
2026_MoRTH_900024_1
EE/NHD/KLB/NIT/2025-26/1790
Open Tender
Civil Works
Item Rate
30 days
Hattigudur
Please refer Tender documents.
4 documents required · 4 mandatory
₹3,600
RPAO
₹48,000
11 Mar 2026
24 Feb 2026
12 Mar 2026
24 Feb 2026
11 Mar 2026
24 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for Structures: Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. including cost of all labour, material, usage charges of all machinery, lead, lifts, loading, unlodaing.
i) Ordinary soil, B) Mechanical means (Depth upto 3m) etc., Complete. As directed by Engineer incharge of the work. | 45.26 | Cum | 116 | ₹5,250.16 |
| 2 | Dismantling of Structures:- Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres including all labour, hire charges of all machineries. Dismantling Stone Masonry-I(ii)B by Manual Means-RSM in CM etc., Complete. As directed by Engineer incharge of the work. | 20 | Cum | 529 | ₹10,580 |
| 3 | Providing & laying Plain/Reinforced Cement Concrete 1:3:6 in foundation with crushed stone aggregates 40mm nominal size mechanically mixed, placed in foundation and compacted ny vibration including curing, cost of all materials, all labour, usage charges of machinery, lead, lifts, loading, unloading, transporting, etc., complete.As directed by Engineer incharge of the work. | 6.53 | Cum | 4,808 | ₹31,396.24 |
| 4 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications including cost of all materials, formwork, centring, vibrating, compacting, usage charges of machinery, lead, lift, loading, unloading, transporting, stacking, curing, finishing the exposed faces etc., complete (excluding cost of steel and fabrication charges) C-Case-II) RCC Grade M20 using batching plant transit mixer & manual placing etc., complete.As directed by Engineer incharge of the work. | 51.69 | Cum | 6,295.41 | ₹3,25,409.74 |
| 5 | Supplying, Fitting and Placing un-coated TMT Fe 500 grade bar reinforcement in Foundation including cost of all labour, materials, usage charges of machinery, fabrication charges, straightening bars, cutting, bending, hooking, binding with approved quality binding wire, after placing in position, tyeing, lapping and / or welding where ever required (laps, hooks and wastages shall not be measured and paid) with all lead, lifts, loading , unloading, Transporting, stacking neately etc., complete as per drawing and technical specifications etc., complete.As directed by Engineer incharge of the work. | 1.55 | MT | 78,256 | ₹1,21,375.06 |
| 6 | Painting Two Coats on New Concrete Surfaces: Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces, including cost of all materials, labour, loading, unloading, lead, lift, transporting etc., complete.As directed by Engineer incharge of the work. | 200 | Sqm | 89 | ₹17,800 |
| 7 | Construction of Subgrade and Earthen Shoulders: Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 laid in layers not exceeding 250 mm thick and compacting it by mechanical means after adding water to its OMC, so as to achieve 97% compaction of maximum dry density and finish the surface to the required camber, grade and cross section etc., speading, grading by motor grador, consolidation by roller including all lead, lifts, loading, unloading, all labour, usage charges of machinery etc., complete.As directed by Engineer incharge of the work. | 83.78 | Cum | 475 | ₹39,795.5 |
| 8 | Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification including cost of all materials, labour, loading, unloading, lead, lift, usage charges of machinery transporting etc., complete.As directed by Engineer incharge of the work. | 17.89 | Cum | 2,840 | ₹50,807.6 |
| 9 | Boulder Pittching on slope - Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications including cost of all materials, labour, loading, usage charges of machinery, unloading, lead and lift, transporting etc., complete. As directed by Engineer incharge of the work. | 35.78 | Cum | 1,728 | ₹61,827.84 |
| 10Retro- Reflectorised Traffic signs:- Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of Class-B Type IV retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over back support frame of min 25 x 25 x 3mm Angle mounted on a mild steel circular pipe 65 NB ,3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing. The sign shall be maintained as per section 12 of IRC 67. as per clauses, including curing, cost of all materials, all labour, lead, lift, loading, unloading, transporting etc., complete. As directed by Engineer incharge of the work. | |||||
stage.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
KW1.pdf
Tender Documents • 0.90 MB
Instructions.pdf
Additional Documents • 0.12 MB
BOQ_946018.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .