| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹53,695.03Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹58,449.27+₹4,754.24 (8.85%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹58,607.46+₹4,912.43 (9.15%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹62,483.77+₹8,788.75 (16.4%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹66,437.60+₹12,742.57 (23.7%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹79,000
EMD Value
₹2,370
Closing Date
28 Jul 2026, 3:00 pmClosed
Executive Eng REW Kupwara
Executive Eng REW Kupwara
Const of Culvert link Road to Asmile W6 at Allachizeb
2026_RDPR_315747_4
NIT NO 51 OF 2026-27 ADF QADERABAD
Open Tender
Civil Works
Percentage
Executive Eng REW Kupwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Eng REW Kupwara
₹2,370
1 Aug 2026
14 Jul 2026
29 Jul 2026
14 Jul 2026
28 Jul 2026
14 Jul 2026
14 Jul 2026 - 14 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply spreading and filling of quarry RBM nallah/muck in layers incl watering dressing ramming by PRR to achieve required density complete job including loading & all carriages | 6.67 | Cum | 1,000 | ₹6,670 |
| 2 | CEMENT CONCRETE (CAST-IN-SITU) of specified grade including curing but excluding the cost of centring and shuttering.1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) | 3.75 | Cum | 7,788.4 | ₹29,206.5 |
| 3 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Mild steel and medium tensile steel bars incld all carriages CJ | 300.12 | Kg | 115.35 | ₹34,618.84 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work | 7.32 | Na | 1 | ₹7.32 |
| 4.1 | A) Walls | 8.78 | Sqm | 286.35 | ₹2,514.15 |
| 4.2 | B) Suspended floors, roofs, landings, balconies and access platforms | 4.64 | Sqm | 718.2 | ₹3,332.45 |
| 5 | Carriage of Materials by MT from source to Works site | 5.06 | Cum | 344.49 | ₹1,743.12 |
| 6 | Photography / Signboard | 1 | No | 1,000 | ₹1,000 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_1025735.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .