| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.7 LAccepted-AOC | ₹34.7 L Quoted ₹35.6 L | L1 | Accepted-AOC Being L1 Bidder |
| 2 | L2₹40.5 LRejected-Finance FLAT NO F2 BLOCK A FIRST FLOOR THE LEGACY APARTMENT AIRPORT ROAD GOLA KA MANDIR GWALIOR MP 474005 | GWALIOR | GWALIOR | MADHYA PRADESH | 474005 | ₹40.5 L | L2 | Rejected-Finance other than L1 |
| 3 | Rejected-Technical GF AKRITI TOWER 19 B VIDHAN SABHA MARG LUCKNOW PIN 226001 | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | - | - | Rejected-Technical NOT RECOMMENDED BEING ADVERSE REMARK IN WLR CE BHATINDA ZONE QE SEP 2025 |
| Sl No | Description | Qty | Unit | M/S STEAD FAST L1 | Jai Mahakaal Construction L2 |
|---|---|---|---|---|---|
| 1.00 | Repair/ maintenance of of Addressible/Non addressible type/conventional auto dialer fire alarm system complete type at Akash missile building single or multi stories having Heat/smoke/flame detectors and accessories controled through one or more control panels of any loop for functiong of the purpose installed with all accessories, such as MCP, Hooter, detectors etc for finding out defects if any or its serviceability complete all as specified and directed. The maintenace schedule shall cover 01 preventive maintenance schedule and unlimited breakdown call by a qualified technician as aproved by GE. The spare parts required will be measured and paid seperately. No of panels - 02 , No of detectors - 70 Note : (i) The Maintenance includes disconnecting of all uncleaned / dirty smoke detector from roof and make it to be cleaned with wet/dry cotton cloths , making the detectors dry and fix/connect the same and make it functionable, replacement of old unserviceable spares. (ii) The Maintenance includes checking of all disconnected circuit / wire of all the smoke detectors with the fire alarm control panel and reconnect the same and make it functionable. (iii) The maintenance includesTesting of fire alarm system as per relevant IS in the presence of the user and Engr-in-charge is deemend to be included in the quoted rate. The unserviceability issued of fire alarm system shall be attended with in 72 hours failing which a sum of Rs 2500/- per day shall be recoverd from the contractor
(iv) Required spares shall be measured and paid seperately under relevant items. (v) A register shall be maintained by the contractor for each visit and kept in record duly signed by user and JE/ Engr-in-Charge. | 1 | Each Job | 2,000 ₹2,000 | 15,000 ₹15,000 |
| 2.00 | All as per item no.1 above but at Nano hanger office complex , no of panels - 03 , No of detectors - 190 complete all as specified and directed by Eng-in-Charge. | 1 | Each Job | 4,000 ₹4,000 | 11,000 ₹11,000 |
| 3.00 | All as per item no.1 above but at 1 Sqn complex , no of panels - 02 , No of detectors - 80 complete all as specified and directed by Eng-in-Charge. | 1 | Each Job | 2,000 ₹2,000 | 11,000 ₹11,000 |
| 4.00 | All as per item no.1 above but at 7 Sqn complex , no of panels - 02 , No of detectors - 88 complete all as specified and directed by Eng-in-Charge. | 1 | Each Job | 2,000 ₹2,000 | 11,000 ₹11,000 |
| 5.00 | All as per item no.1 above but at IMMOLS, no of panels - 01 , No of detectors - 70 complete all as specified and directed by Eng-in-Charge. | 1 | Each Job | 2,000 ₹2,000 | 11,000 ₹11,000 |
| 6.00 | All as per item no.1 above but at DWR, no of panels - 01 , No of detectors - 90 complete all as specified and directed by Eng-in-Charge. | 1 | Each Job | 1,500 ₹1,500 | 11,000 ₹11,000 |
| 7.00 | All as per item no.1 above but at POL Store, no of panels - 01 , No of detectors - 6 complete all as specified and directed by Eng-in-Charge. | 1 | Each Job | 1,500 ₹1,500 | 11,000 ₹11,000 |
| 8.00 | All as per item no.1 above but at Avonics lab, no of panels - 02 , No of detectors - 85 complete all as specified and directed by Eng-in-Charge. | 1 | Each Job | 2,000 ₹2,000 | 11,000 ₹11,000 |
| 9.00 | All as per item no.1 above but at 706 SU, no of panels - 04 , No of detectors - 65 complete all as specified and directed by Eng-in-Charge. | 1 | Each Job | 2,000 ₹2,000 | 11,000 ₹11,000 |
| 10.00 | All as per item no 1 above but at CEO Complex, no of panels-02, No of detectors-110 complete all as specified and directed by Engr-in- Charge | 1 | Each Job | 2,000 ₹2,000 | 11,000 ₹11,000 |
Updated dates
Tender Value
₹45 L
EMD Value
₹90,000
Closing Date
2 Jan 2026, 6:00 pmClosed
GE(AF) TA GWALIOR
GE (AF) TA GWALIOR-474020
REPAIR/MAINTENANCE OF FIRE FIGHTING,FIRE ALARM,FLOODING SYSTEM,EARTHING/LIGHTNING PROTECTION AND CERTAIN MISCELLANEOUS WORKS AT AFS TECH AREA GWALIOR
2025_MES_743322_1
8900/1637/GWL/E8
Open Tender
Electrical and Maintenance Works
330 days
GWALIOR
Please ref tender documents
7 documents required · 7 mandatory
₹500
GE(AF) TA GWALIOR
₹90,000
Yes
23 Feb 2026
5 Dec 2025
9 Jan 2026
5 Dec 2025
2 Jan 2026
19 Dec 2025
All as per item no.1 above but at Nano hanger office complex , no of panels - 03 , No of detectors - 190 complete all as specified and directed by Eng-in-Charge.
All as per item no.1 above but at 1 Sqn complex , no of panels - 02 , No of detectors - 80 complete all as specified and directed by Eng-in-Charge.
All as per item no.1 above but at 7 Sqn complex , no of panels - 02 , No of detectors - 88 complete all as specified and directed by Eng-in-Charge.
All as per item no.1 above but at IMMOLS, no of panels - 01 , No of detectors - 70 complete all as specified and directed by Eng-in-Charge.
All as per item no.1 above but at DWR, no of panels - 01 , No of detectors - 90 complete all as specified and directed by Eng-in-Charge.
All as per item no.1 above but at POL Store, no of panels - 01 , No of detectors - 6 complete all as specified and directed by Eng-in-Charge.
All as per item no.1 above but at Avonics lab, no of panels - 02 , No of detectors - 85 complete all as specified and directed by Eng-in-Charge.
All as per item no.1 above but at 706 SU, no of panels - 04 , No of detectors - 65 complete all as specified and directed by Eng-in-Charge.
All as per item no 1 above but at CEO Complex, no of panels-02, No of detectors-110 complete all as specified and directed by Engr-in- Charge
All as per item no 1 above but at GIMI &ATEC Sec, no of panels-02, No of detectors-98 complete all as specified and directed by Engr-in-Charge
All as per item no.1 above but at WSMT, no of Panels-01 No of detectors-18 complete all as specified and directed by Engr-in-Charge
All as per item no.1 above but at Old 10 Tetra School, no of panels-02, No of detectors-68 complete all as specified and directed by Engr-in- Charge
All as per item no.1 above but at New 10 Tetra School, no of panels-02, No of detectors-218 complete all as specified and directed by Engr-in- Charge.
All as per item no 1 above but at 26 MMPU, no of panels-01, Nos of detectors-20 complete all as specified and directed by Engr-In-Charge.
All as per item no 1 above but at Tech Flight and Central Elint Complex, no of panels-02, No of detectors-125 complete all as specified and directed by Engr-in-Charge
All as per item no 1 above but at Ejection seat bay, no of panels-01, No of detectors-16 complete all as specified and directed by Engr-in-Charge
All as per item no 1 above but at Bison hanger, no of panels-01, No of detectors-20 complete all as specified and directed by Engr-in-Charge
All as per item no 1 above but at 9 Sqn, no of panels-02, No of detectors-120 complete all as specified and directed by Engr-in-Charge
All as per item no 1 above but at B flight, no of panels-02, No of detectors-60 complete all as specified and directed by Engr-in-Charge
All as per item no 1 above but at SU -30, no of panels-02, No of detectors-35 complete all as specified and directed by Engr-in-Charge
All as per item no 1 above but at ERS, no of panels-02, No of detectors-55 complete all as specified and directed by Engr-in-Charge
All as per item no 1 above but at CR & SS Hanger, no of panels-02, No of detectors-55 complete all as specified and directed by Engr-in-Charge
All as per item no 1 above but at P-73 Hanger, no of panels-02, No of detectors-40 complete all as specified and directed by Engr-in-Charge
All as per item no 1 above but at HS-4 Hanger, no of panels-02, No of detectors-38 complete all as specified and directed by Engr-in-Charge
Taking down unserviceable fire alarm panel addressable/non addressble of make model 2/4 loop capacity upto 200 detectors by removing /disconnecting the connections and repair /replace the complete unserviceble parts such as central processing unit/Control card,Display,Signalling line circuits,user interface,communication module,battery and software installation and programming need to be done at only in OEM team (Apollo/Agni/Ravel/Edward) with complete restoration as healthy panel all as specified and directed by Engr-in-charge.
Supply only in replacement of Mother board card suitable for any unserviceable Fire alarm control panel Addressible/no addressible including testing complete all as specified and directed .Note :(1) The mother board card shall be purchased only from the OEM.
Supply only inreplacement of Loop card suitable for any unserviceable Fire alarm control panel Addressible/no addressible including testing complete all as specified and directed .Note :(1) The Loop card shall be purchased only from the OEM.
Supply only inreplacement of Display card suitable for any unserviceable Fire alarm control panel Addressible/no addressible including testing complete all as specified and directed .Note :(1) The Loop card shall be purchased only from the OEM.
Supply only inreplacement of Digital display suitable for any unserviceable Fire alarm control panel Addressible/no addressible including testing complete all as specified and directed .Note :(1) The Loop card shall be purchased only from the OEM.
Attending complaints and the rectification of buzzing False alarm of any type fire alarm control panel by checking the control panel,removing the unwanted dust partcles inside the panel ,checking the complete wiring or each detector hanging on the false ceiling or inside the false ceiling panel or checking the MCP or fire alarm soundner and cleaning the smoke /dust particle on the smoke / heat type detector with the dry cloth or with the dust removing spray,programming,Software installation,Restting the complete fire alarm panel including testing the panel infront of user/JE/Engr-in-Charge complete all as specified and directed. Note :(1) The contractor shall arrange the technician only from the OEM team and the prior approval shall be obtained from the JE/Engr-in-Charge/. (2) The false alarm shall be rectified within 24 hrs by the contractor or the penalty charge Rs 750 /day shall be applied to the contractor (3) Rectification of buzzing false alarm for one Fire alarm panel measured as one Job only.
M&L inreplacement of Fire alarm system control wiring above/below the false ceiling using three single core PVC insulated, sheathed stranded copper conductor FRLSH cable of size 1.5 Sqmm 1100 Volts drawn in and including MS conduit (Medium grade ISI marked) of dia not less than 20mm with standard accessories complete all as specified and directed . Note: (1) Two run of copper cable will be measured in one single length.
All as per above item no 32 but wiring in the existing conduit complete all as specified and as directed
supply only in replacement of maintenance free fire alarm control panel battery of 12 volts 7 AH capacity and connecting and testing at site complete all as specified and directed.
Supply & fixing, in repair including testing and commissioning of Fire alrm Control panel complying with BSEN54 addressable type two loop panel including controller card of capacity from 99 detector and 99 modules upto 200 detector and modules complete with battery 12 volts 7 AH capacity (02 Nos ) all as specified and directed
Supply & fixing, in repair including testing and commissioning of Fire alrm Control panel non addressable type complying with BSEN54 non addressable two loop panel including controller card of capacity from 99 detector and 99 modules upto 200 detector and modules complete with battery 12 volts 7 AH capacity (02 Nos ) all as specified and directed
Supply only in repair of addressable / conventional manual call point (MCP) surface mounting with glass cover complete all as specified and directed.
Supply & fixing, in replacement of Automatic fire detection and Fire Alarm System including Programming , Software installing ,Controll card, Motherboard card, Loop card , SLC , EOL, NAC ,Display card , Digital display installation ,12 V 7.2 AH Fire alarm panel battery - 02 Nos ,2Loop FAS with PA eqpt , 230V -1A-50 Hz , complete with all spares and equipments including testing and commissioning complete set all as specified and directed.
Supply & fixing, in replacement of Fire Alarm Repeater Panel including Programming , Software installing ,Controll card, Motherboard card, Loop card , SLC , EOL, NAC ,Display card , Digital display installation , complete with all spares and equipments including testing and commissioning complete set all as specified and directed.
Programming/re-loading of software for existing unserviceable fire alarm control panel conventional/addressable type to make it functional with the help of software to suit existing panel/model including testing of all connected circuits/detectors complete all as specified and directed.
Supply only in replacement smoke/heat Detectors Complying with and type certified to EN - 45 Addressable/ Non addressable type detector Photoelectric /Optical with base with self built intelligence as per IS: 11360
Supply only in replacement addressable type flame Detectors with UV / IR detection capacity complete all as specified and directed by Engr-in-charge.
Supply only in replacement fire alarm sounders/sirens electronic type horizontal single stage continuous normal operation for at least 50 minutes with sound level 65 DB to 120 DB measured at 1.5 meter with sound output variation of +5 DB for 1000 meter range
Supply only in replacement addressable electronic sounder cum strobe complete all as specified and directed.
Supply only in replcement addressable control module complete all as specifed and as directed
Supply only in replacement remote response indicators complete all as specified and directed.
Supply only switch mode power supply suitable for existing fire alarm control panel complete all as specified and directed.
Repair/Maint of following capacity fully automatic engine start system Fire Fighting Pump sets installed at ATC complete all as specifed and as directed by Engr-in-Charge. The Maintenance includes monthly preventive maintenance visits and unlimited breakdown calls during the Contract period. The Maint Shall include the following works and services. a) Cleaning, Oiling,Greasing, topping, calibration, repairs to Main Pump Electric driven, Jockey Pump electric driven b) Inspection of Motor Control system with cleaning of all the switch gears and contactors c) Inspection, testing of entire Hydrant System through maintenance service Centre having experience in Fire Fighting maintainance or any other agency as approved by GE,checking of complete pipe line and cleaning of the complete line by passing rod or SWR wire. (d) Replacement of spare parts will be measure seperate. (e) A register shall be maintained by the contractor for each visit and kept in record duly signed by user and JE/ Engr-in-Charge. The list of fire fighting eqipments installed is appended below. 1.Motor driven main pump 45KW /60HP, 2500LPM 70M head-02 Nos and control valves 2. Motor driven Jockey pump 15HP 2900RPM, 70M head-01 Nos and control valves 3.Hydrant control panel and the connected items. The list of fire fighting eqipments installed is appended below. 1. Motor driven main pump 75KW/100HP 1450RPM 70M head-01 Nos 2.Motor driven Jockey pump 15 HP, 2900RPM 70M head-01 Nos 3. Diesel driven std by pump 45KW/60HP 1800 RPM, 70M head-01 Nos 4. Complete Hydrant System with UG MS Pipe, Fire Hydrants and Hose cabinets Note for
Item No 02 & 03 : The AMC of fire fighting system shall also include the following monthly checks 1. Cleaning, Checking and operating all fire pumps. Checking noise, vibration and temperature of the pumps in their working state. 2. Cleaning, Checking electrical Control Panel (MCC) of the fire pumps. 3. Checking of Engine Driven Starter Panel, Servicing of Fire Diesel pump At the interval of 06 Month 4. Checking of Volt Meter; Amp meter; Starter etc. 5. Checking of batteries, fan belt, temperature gauge, Fuel gauge etc. of diesel generator fire pump. 6. Greasing of pump shafts 7. Overhauling of all Pumps if required 8. Cleaning of all pumps and its accessories. 9.Checking & servicing of Strainers, Gate / Butterfly Valves, Non return Valves, Air Vessel, Pressure Gauges, Pressure Switches and other related accessories therein. 10. Checking of Diesel Tank flow pipe condition, Display pipe condition.(11)A register shall be maintained by the contractor for each visit and kept in record duly signed by user and JE/ Engr-in-Charge.
Repair/ Maintenance for following capacity fully automatic engine start system Fire Fighting Pump sets installed at Nano Hangar complete all as specifed and as directed by Engr-in-Charge. The Maintenance includes monthly preventive maintenance visits and unlimited breakdown calls during the Contract period. The Maintenance Shall include the following works and services. a) Cleaning, Oiling,Greasing, topping, calibration, repairs to Main Pump Electric driven, Jockey Pump electric driven,diesel engine driven pump b) Checking the tention in V Belt of any size of diesel engine,pipe with fittings, check the level of coolant in radiator, repairs to leakage in radiator etc. Gaskets & Oil seals,bushes, servicing of the water pump, adjustment of fuel firing, repair to self starter, c) Battery top up with Electrolite solution, arresting the oil leakage and topping up of engine oil, operator interface device OID display,replacement of U/S oil level tube provided on the fuel tank for checking of oil level. d) The tank has to be calibrated and level marked on the tank, cleaning of tank for dust and mud. e) Repair of wiring control panel of diesel engine by checking of condition of control wiring and tightning of screws etc as required at site. DG including repair/Replacement off toggle switch, f) Inspection of Motor Control system with cleaning of all the switch gears and contactors g) Inspection, testing of entire Hydrant System through maintenance service Centre having experience in Fire Fighting maintainance or any other agency as approved by GE.
All as per above item No 51 but 100 HP capacity main pump complete all as specified and as directed
All as per above item No 51 but 60 HP capacity main pump complete all as specified and as directed
All as per above item No 51 but 68 HP diesel engine driven pump complete all as specified and as directed.
M&L in replacementof Sluice Valve PN 1.6 150 dia Complete all as specified and as directed
M&L in replacementof Sluice Valve PN 1.6 100 dia Complete all as specified and as directed
M&L in replacement of Non Return Valave 100 mm dia complete all as specified and as directed
M&L in replacement of Non Return Valave 150 mm dia complete all as specified and as directed
Repair/Maint of following capacity engine start system Fire Fighting Pump sets installed at DWR complete all as specifed and as directed by Engr-in-Charge. The repair/maintenance cost includes 01 preventive maintenance visits and unlimited breakdown calls during the Contract period. The Maintenance Shall include the following works and services. a) Cleaning, Oiling,Greasing, topping, calibration, repairs to Main Pump Electric driven, Jockey Pump electric driven,diesel engine driven pump b) Checking the tention in V Belt of any size of diesel engine,pipe with fittings, check the level of coolant in radiator, repairs to leakage in radiator etc. Gaskets & Oil seals,bushes, servicing of the water pump, adjustment of fuel firing, repair to self starter, c) Battery top up with Electrolite solution, arresting the oil leakage and topping up of engine oil, operator interface device OID display,replacement of U/S oil level tube provided on the fuel tank for checking of oil level, cleaning of fuel tank etc. d) The tank has to be calibrated and level marked on the tank, cleaning of tank for dust and mud. e) Repair of wiring control panel of diesel engine by checking of condition of control wiring and tightning of screws etc as required at site. including repair/Replacement off toggle switch, f) Inspection of Motor Control system with cleaning of all the switch gears and contactors g) Inspection, testing of entire Hydrant System, through maintenance service Centre having experience in Fire Fighting maintainance or any other agency as approved by GE,checking of complete pipe line and cleaning of the complete line by passing rod or SWR wire. (h) Replacement of spare parts will be measure seperate. (i)A register shall be maintained by the contractor for each visit and kept in record duly signed by user and JE/ Engr-in-Charge. The list of fire fighting eqipments installed is appended below. 1.Motor driven main pump 60 HP 1415RPM 17M Head -kirloskar Make 01 Nos 2. Motor driven Jockey pump 15 HP 2900 RPM 17M head -01 Nos 3. Diesel driven std by pump 68 HP 1620LPM 1500RPM 88M head o kirloskar make 01 Nos 4. Complete Hydrant System with UG MS Pipe ,02 Nos Fire Hydrants and 04 Nos Hose cabinets & Hose reel drum.
Supply only in replacement of hose reel with drum 30m complete all as specified and as directed
M & L in replacement of pressure guage 4'' dial 0-14 Kgs rating including testing complete all as specified and directed.
M& L in replacement of Yard hydrant Post / Stand Post 80mm Dia GI / MS both flanged type 1.5m Height Including necessary fittings complete all as specified and as directed
M& L in replacement of fire hydrant valve double headed complete all as specified and as directed
Supply only in replacement of brass hose reel nozle 63 mm dia complete all as specified and as directed
M&L in replacement of Single Hydrant Gun Matal 63mm Dia with Water Tigghtness test :-14kgf/cm2 and Hydrostatic Test :- 21kgf/cm2 and Flow test :90 LPM min at :7kgf/cm2 .LPMm
Supply only in replacement of battery charger for diesel engine fire pump complete all as specified and as directed
M& L in replacement of relay suitable for Jockey pump 15 HP capacity complete all as specified and as directed
M/L for Maintenance and servicing of Diesel engine Pump Set complete including draining out of diesel from tank , cleaning the tank thoroughly and refilling the drained out diesel, draining out engine oil from the sump, cleaning the sump thoroughly and refilling the sump with new en
M&L for the replacement of 2 mm thick glass for hose reel box 24" x 12"with proper fixing arrangements like rubber seal at the edges of glasses complete all as specified and directed.
M & L for preparation of old painted steel surfaces of any description over and applying two coats of synthetic enamel paint of approved colour for Fire Fighting stand post of 1.5m height,hose reel box,hose reel drum along with fire hydrant sluice/non return valve,pump set, Diesel engine for fire pumps including MS pipe line for complete hydrant system complete all as specified and directed.
Supply only N2 gas cylinder seam less of capacity 2 kg or nearest higher size conferming to relevent of IS with control , valves etc with N2 gas all as specified and directed .
Supply only high pressure brass ISI mark non return valve 20mm bore for manifold and discharge hose connection of approved make complete all as specified and directed.
Supply only in replacement of RRL Hose pipe 63mm Dia 15mtr Gun Metal Male/Female Coupling with working pressure : 200 PSI Test Pressure: 300 PSI and Burst Pressure :500 PSI .
M&L in replacement of power contactor 3 Pole, 415V, AC3 rating 125 Amps complete all as specified and directed.
Supply only solenoid valve 60Kg/cm2 pressure two way 15 mm dia (ISI mark) including all fitting complete all as specified and directed.
Supply only high pressure brass safety valve 25mm bore (ISI mark) with outlet pipe of approved make complete all as specified and directed.
M&L in replacement of power contactor 3 Pole, 415V, AC3 rating 100 Amps complete all as specified and directed.
M&L in replacement of Lead acid battery 12 v 100 AH complete all as specified and directed.
Supply only Butter Fly Valve 150 mm CI Lever operated pressure /Class /Rating PN-1.6, Water type Nitrile Rubber Lining SG Iron.
Supply only in replacement of Carbon -Di-Oxide (CO2 ) Portable Fire Extinguisher capacity 4.5 Kg MS Seamless body ISI With Gun mattle Valve . High Pressure Horn type Hose pipe ,with Syphan ,95% Min Efficitive Discharge ,Operation valve Upright Wheel / Squeeze Grip type Including fixing of wall complete with suitable clamp with nuts, bolts and washers .
Suppy ABC type Powder Filled Fire Extinguisher capacity 4 kg IS 15683 ,85% Mon effective Discharge , 13 Sec Discharge Time ,35 kgf /cm2 Hydraulic tested Pressure .Including fixing of wall complete with suitable clamp with nuts, bolts and washers.
M& L in replacement of MS ERW Steel pipe including specials, welded joints/flanged nominal dia 150 mm as per IS 3589 (1981) thickness 4.8 mm with bituminus coating complete all as specified and as directed.
Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. Or for shafts, wells, cesspits, manholes, pier holes, etc. N exc 10 sq m on plan and n exc 5 m in depth and getting out in soft/loose soil complete all as specified and as directed.
All as per item no. 78 But butter fly valve 100 mm dia all as directed by Eng-in-Charge.
All as per item no. 78 But butter fly valve 80 mm dia all as directed by Eng-in-Charge.
M&L for Testing of Co2 system as per IS in the presence of the user and Engr-in-charge complete all as specied and as directed.
Material and labour for flushing out the complete pipe system from Co2 bank to gas nozzles with the adequate pressure of Nitrogen gas including taking out, opening and cleaning of nozzle complete all as specified and directed.
M&L including filling of CO2 gas 22.5 Kg in existing empty high pressure seamless cylinders having 22.5 Kgs capacity after carrying to authorized filling station of CO2 gas and fixing back to the plant complete all as specified and directed. Note: Cylinder shall be affixed with lamintated sticker of size not less than 100mmX75mm compresing details of cylinder i.e. Tare wt of cylinder, Nett wt. or filled gas & date.
Supply CO2 gas cylinder seam less of capacity 22.5 kg or nearest higher size conferming to relevent of IS with control , valves etc duly filled with CO2 gas all as specified and directed.
M&L including filling of Nitrogen (N2) gas 2 Kg in high pressure seamless cylinders having 2 Kgs capacity after carrying to authorized filling station of N2 gas and fixing back to the plant complete all as specified and directed.
Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm complete all as specified and as directed.
Supply N2 gas cylinder seam less of capacity 2 kg or nearest higher size conferming to relevent of IS with control, valves etc with N2 gas all as specified and directed.
M & L for preparation of the old existing steel surfaces of 16 Nos CO2 Gas cylinder and applying two coats of synthetic enamel paint of approved colour complete all as specified and directed.
Supply only brass discharge nozzles cone type for CO2 cylinders of approved make complete all as specified nd directed.
Supply only high pressure flexible hose pipe10 Kg /cm2 with flexible hose pipe flexible connector for pneumatic line & cylinder of approved make complete all as specified and directed .
All as per item no 98 above bt capacity 300 KVA
All as per item no 98 above bt capacity 200 KVA
All as per item no 98 above bt capacity 150 KVA
All as per item no 98 above bt capacity 75 KVA
All as per item no 98 above bt capacity 10/15 KVA
M& L in replacement of transformrer oil suitable for servo controlled oil cooled voltage stabilizer complete all as specified and directed.
All as per item no 105 above bt capacity
All as per item no 105 above bt capacity 10 KVA
All as per item no 105 above bt capacity 5 KVA
Supply only sealed maintenance free batteries 12 V 35 AH suitable for UPS system complete for its satisfactory operation Note: Unserviceable retrieved batteries shall be returned to E/M stores.
Supply only sealed maintenance free batteries 12 V 45 AH suitable for UPS system complete for its satisfactory operation Note: Unserviceable retrieved batteries shall be returned to E/M stores.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
tender1637.pdf
Tender Documents • 0.73 MB
BOQ_832336.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid