Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹9 L
Closing Date
9 Sept 2026, 2:00 pm
T. Shivadhandayuthabani
Bengaluru GGL
HIRING OF CONTRACTS FOR GROUND CONNECTIVITY WORKS FOR DOMESTIC / COMMERCIAL/ INDUSTRIAL CUSTOMERS FOR GAIL GAS BENGALURU CGD PROJECT
2026_GAILG_288005_1
GAILGAS/BLR/CnP/26-27/30
Open Tender
Miscellaneous Works
Item Rate
BENGALURU
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹9 L
Yes
ONLINE THROUGH MS TEAMS
19 Aug 2026
19 Aug 2026
10 Sept 2026
19 Aug 2026
9 Sept 2026
28 Aug 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | The scope under the proposed tender is covering the Ground Connectivity works for Domestic/Commercial/Industrial customers for GAIL Gas Bengaluru CGD Project.
Handling, Receipt, Loading, unloading, storing, reloading, transportation, Uncoiling, laying of PE100, SDR11 line pipes of all sizes (Free Issue Material from Owner's designated store within GA) including, proper stacking, and supply of accessories of all sizes & thickness like PE Bends, Saddle, Couplers, Endcaps, Tee(Equal/ Reducing), Reducer, CS / GI to PE Fittings (i.e. Transition Fittings of sizes 20 mm to 63 mm), (excluding asphalt road crossing width from road edge to road edge covered separately under item C1) in case road crossing is required for connectivity) laying /installation of PE pipe in any method (Open Trench/Moling/rat-boring/ auger method, etc. including execution of all associated works/consumables etc. for Ground Connectivity works from charged MDPE pipeline to customer premise.
Carrying out preliminary & final survey activities for crossings encountered in pipeline route and preparation of drawings with crossing methodology etc. wherever required and submission of drawings to Owner/Engineer-in-charge for review / approval.
Getting approval/permissions /clearances for execution from concerned authorities, utility operators, etc,
Dismantling/demolition/Rock breaking of RCC/ PCC/ Paver Blocks/ Footpath/Asphalt/Bitumen, all types of soils including soft/ rocky strata / roads etc., chiselling or otherwise cutting etc. as required and storing excavated soil etc. for pit excavation, Excavation of the soil, to determine the underground utilities/ services, charged pipelines, etc., Barricading the work area, restoration of the excavated portion to original condition and final clean up, to entire satisfaction of Owner/Engineer-in-charge and/or concerned authority as per the typical restoration drawing.
The minimum depth of the top of pipeline shall be 1.0 m measured from top of pipeline to the top of undisturbed surface of the soil or as per Specification/ OISD - 226 & PNGRB latest guidelines whichever is higher. Dewatering of trenches / pits if required as per site condition. Repairing of all damaged utilities if any, and payment of any compensation
Laying of PE pipelines with associated fitting, jointing of the pipe ends / fittings using approved electro-fusion techniques | - | - | - | - | - |
| 2 | Padding around pipeline with soft soil, backfilling to its original condition with excavated earth / borrowed select soil/sand & its compaction & crowning & restoration as per the attached drawing and shall be made ready for motorable. All tiles/slabs/curb stones etc removed during excavation shall be placed properly.
The scope of work against laying of 20/32/63/90 mm pipe, online tapping with saddle/tee with the existing charged pipeline. In case, the minimum required depth is not possible due to site condition, necessary mitigation measures shall be required to be taken by contractor in consultation with EIC
Flushing, Pneumatic testing and commissioning, providing all tools and tackles, instruments, manpower and other related accessories.
On completion of gas charging of pipelines. Preparation and submission of As-built drawings, crossings details, termination, utility graphs and deviation statements. On completion of gas charging of pipelines. Preparation and submission of As-built drawings, crossings details, termination, utility graphs and deviation statements, reconciliation of material. | - | - | - | - | - |
| 3 | Dismantling/demolition/ breaking | - | - | - | - | - |
| 4 | Dismantling/demolition/ breaking of RCC /Hard Rock | 100 | M3 | 9,112.5 | ₹9,11,250 | 0.18% |
| 5 | Dismantling/demolition/ breaking of PCC | 67 | M3 | 9,387.5 | ₹6,28,962.5 | 0.18% |
| 6 | Dismantling/demolition/ breaking of Paver Block/Foot Path etc. | 68 | M3 | 7,375 | ₹5,01,500 | 0.18% |
| 7 | Dismantling/demolition/ breaking of Aphalt/Bitumen/Road | 45 | M3 | 7,950 | ₹3,57,750 | 0.18% |
| 8 | Excavation of pit | - | - | - | - | - |
| 9 | Pit Excavation of soil for a depth upto 1.5m | 1,238 | M3 | 4,300 | ₹53,23,400 | 0.18% |
| 10 | Excavation of soil for a depth more than 1.5 upto 2.0m, additional payment shall be made as per this SOR item beyond the SOR item no.B1 | 335 | M3 | 2,575 | ₹8,62,625 | 0.18% |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.21 MB
IID.pdf
Tender Documents • 0.36 MB
VOL1.pdf
Tender Documents • 1.66 MB
IIE.pdf
Tender Documents • 3.31 MB
IIC.pdf
Tender Documents • 0.86 MB
IIB.pdf
Tender Documents • 3.03 MB
IIA.pdf
Tender Documents • 0.84 MB
BOQ_336127.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].