Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-Finance | L1 | Accepted-Finance Rate quoted is lowest | |
| 2 | L2₹2.0 L+₹3,190 (1.63%)Accepted-Finance | L2 | Accepted-Finance Rate quoted is second lowest | |
| 3 | L3₹2.0 L+₹3,725 (1.90%)Accepted-Finance | L3 | Accepted-Finance Rate quoted is highest |
Tender Value
₹2.0 L
EMD Value
₹2,000
Closing Date
18 Dec 2023, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
SE ETC Sultanpur 400KV S/S Campus Payagipur Sultanpur
INSTALLATION, ERECTION AND COMMISSIONING OF 40MVA T/F AFTER ITS IN PLACE OF 20MVA T/F AT 132KV S/S BIKAPUR AND OTHER ASSOCIATED WORKS UNDER ETD, AYODHYA.
2023_UPTCL_864713_1
S.T. T.No. 43/ETCS/2023-24
Open Tender
Electrical Works
Item Rate
10 days
132KV S/s Bikapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹236
SE ETC Sultanpur
₹2,000
20 Dec 2023
23 Nov 2023
19 Dec 2023
23 Nov 2023
18 Dec 2023
23 Nov 2023
Amount
Following works are to be carried out for the work of dismantling of old 20MVA 132/33KV T/F (Aditya Make) and installation,Erection & Commissioning of the 40MVA 132/33KV T/F in place of of 20MVA 132/33KV T/F (Aditya Make) at 132KV S/S,BikapurPur along with associated works including all cost of men, misc. consumable, T&P, Crane, 12KLPH capacity centrifuging M/C with operator etc to complete the job satisfactorily as per direction of Supervising Engineer.
Complete safe Dismantiling of the accessories of 132/33kV 20 MVA Transformer (Aditya Make) after opening of jumpers removal of earthing, opening of cable connection, draining out of Transformer oil upto required level in 209 Ltr. Capacity oil drums, removal of conservator tank, pipe lines, bushings, cooling fans and pumps,Wired Mesh fencing, Marshaling box, Radiator after draining of radiator oil in empty drums and fixing of blanking plates on the radiators, pipe lines, conservator tank, turret etc. Suitable blanking plates including bolts and nuts shall be provided by the contractor.
Proper packing of HV/LV and Neutral bushing of dismantaled 20 MVA Transformer(Aditya Make) including proper wrapping with polythene sheet in wooden crates of bushing of old Transformer .
Shifting of Main tank of dismantled 20 MVA Transformer(Aditya Make) to storage place from the plinth including turning of tank if required.
Shifting of 20 MVA Transformer tank upto 20 mtr distance (1 Job for every 5 mtr.)
Additional shifting of 20 MVATransformer tank upto 50 mtr distance (1 Job for every 5 mtr.)
Erection of 40 MVA Transformer
Shifting of Main tank of New 40MVA Transformer ( to plinth from the storage place upto 20 Mtr. distance including turning of tank if required.
Shifting of 40MVA Transformer tank upto 20 mtr distance (1 Job for every 5 mtr.)
Additional shifting of 40MVA Transformer tank upto 50 mtr distance (1 Job for every 5 mtr.)
Complete erection of new 40MVA Transformer including 'A' Frame header Radiators, Conservator Tank, Bushing, Connecting pipe lines, Cooling fans, Marshaling box, OTI, WTI, Capilary pipes etc.
Centrifuging/ Dehydration of the complete Transformer oil of new Transformer by ultra high 12KL. Vacuum Oil filteration plant after connecting the centrifuging pipes with Transformer tank to oil filtration plant. Including taking the BDV values of oil and megger values of the Transformer periodically till the required value is achieved. Including filling and topping up of the Transformer oil under vacuum in Main tank, Radiator, Conservator tank etc. and attending the oil leakages if any, will all cost of centrifuging machine, CFM operator, Lubricant etc.The work also includes assisting in complete testing of transformer as well as getting the oil tested in NABL approved lab for BDV and PPM.
Making of New Delta for Neutral Earthing by due fabrication of 3 Nos. 3 meter long electrodes of 36/40mm dia. M.S. Round Bar, its piercing under the ground at equal distance of 1 meter at 700mm depth by digging of earthand connecting all the 3 No. electrodes with 75mm x 10mm size M.S. Flat and taking out the M.S. riser by due cutting, bending, welding etc. of the M.S. Flat (1 Job per delta), painting of M.S. Flat with Green coulor paint as per technical specification of UPPTCL (M.S. Round Bar and M.S. Flat will be provided by the department)
Earthing of main tank, Marshalling box, Drive mechanism, T/F Neutral etc of new 40MVA T/F with the help of 50x6mm/ 75x10mm size M.S Flat to be provided by department, its jointing with already laid earthmat/ Delta at 2 place and necessaries modification in existing support for earthing of neutral bushing earthing work and repainting of earthing strips as per specification /standard practice.
Jumpering of HV Bushing of New 40MVA Transformer ACSR Panther Conductor
Jumpering of LV Bushing of New 40MVA Transformer with twin ACSR Moose Conductor
Dismantiling and shifting of old 20MVA (Aditya Make) Transformer RTCC Panel from Relay Room including necessary Disconnection of control cables including identification of cables for necessary future connection and shifting the same at proper place/store.
Erection of 40MVA Transformer ( RTCC Panel including shifting from storage place to control Room.
Re-termination of existing control and power cables as per cable schedule of 40MVA Transformer and its OLTC/ RTCC panels into 40MVA Transformer at both end and control and Relay panel, cooling fans and pumps, Marshaling box etc.using existing cable including laying, dressing and binding of additional control cables, if required, as per site requirement and termination along with making necessary holes using glands plate or box, wherever required. Fixing of cable glands of appropriate size, providing of ferrules and cable termination as per standard practice and all other associated works as per technical specification .Work also includes removal of damaged cable of T/F and laying of new cable including terminations.
Inspection of Transformer by electrical Safety Department and taking Clearance for Charging for which shall be paid as per actual.
HARE KRISHNA ENERGY PROJECTS
DEEPAK ENGINEERING
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .