| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹83.2 LAccepted-AOC | 1 | Accepted-AOC The rate quoted by the bidder is less than Put to Tender value | |
| 2 | 2₹88.0 L+₹4.8 L (5.76%)Rejected-AOC | 2 | Rejected-AOC The rate quoted by the bidder is Higher than Put to Tender value |
| Sl No | Description | Qty | Unit | S K G CONSTRUCTION L2 | SENTHAAMARAI CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Removal of Existing Modern tiles from the walls and Floor of the shannathy including all cost of Labour and cost of tranportation, complete etc., as per standard Specifications | 568.8 | sqm | 50 ₹28,440 Lowest | 60.5 ₹34,412.4 |
| 2.00 | Earthwork excavation for foundation in all soils except hard rock requiring blasting to a full depth with initial lead of 10 m and lift of 2 etc., complete (SS 20B) as directed by the Dept. Officers. | 46.8 | sqm | 200 ₹9,360 Lowest | 217.5 ₹10,179 |
| 3.00 | Supplying and filling in foundation and basement with filling M-sand in layers of 150mm 3 thickness well watered ramned and consolidated complying with relevant std specification including cost of supplying filling M-sand. | 182.4 | sqm | 1,500 ₹2,73,600 Lowest | 1,554.5 ₹2,83,540.8 |
| 4.00 | Cement concrete 1:5:10 (One of cement five of M-sand and ten of HBG jelly )for foundation using 40mm gauge HBG jelly inclusive of shoring strutting and baling out water where ever necessary ramming curing etc., complete as per Std, Specification and as directed by the Dept, Officers | 182.4 | sqm | 4,985 ₹9,09,264 | 4,955 ₹9,03,792 Lowest |
| 5.00 | Brick work in Cement Mortar 1:5 using 2nd class ground moulded Chamber bricks size 9" 5 x 43/8" x 23/4 including cost and conveyance of all materials and labour charges and all other pcidental charges etc complete complying with standard specification. | 37.4 | sqm | 6,300 ₹2,35,620 | 6,280.5 ₹2,34,890.7 Lowest |
| 6.00 | Plastering with Cement mortar 1 5,12mm thick including cast and conveyance of all materials and all labour charges, curing etc.complete complying with standard spectations | 112.5 | Sqm | 200 ₹22,500 Lowest | 265.5 ₹29,868.75 |
| 7.00 | Flooring with cut stone slab of size 600mmX600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and lobour charges for paving and Pointing With Lime Martor 1:2 etc complete. single line dressing | 1,145 | sqm | 5,000 ₹57,25,000 | 4,630 ₹53,01,350 Lowest |
| 8.00 | Refixing of removed paver block incluming cost and convevance labour, handling as per instruction of departmental officers etc. complete | 284.4 | Sqm | 900 ₹2,55,960 | 898.5 ₹2,55,533.4 Lowest |
| 9.00Sub total | |||||
| 10.00 | GST | 1 | Nos | 13,42,753.92 ₹13,42,753.92 | 12,69,642.07 ₹12,69,642.07 Lowest |
Tender Value
₹84.1 L
EMD Value
₹52,500
Closing Date
27 May 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assitant Commissioner/Executive Trustee
Arulmigu Devaraja Perumal Temple,Kancheeepuram Town, Taluk and District.
Formation cutstone approach from eastern rajagopuram Arulmigu Devaraja Perumal Temple,Kancheeepuram Town, Taluk and District.
2025_HRCE_558452_1
03/2025
Open Tender
Civil Works - Others
Lump-sum
300 days
Kancheepuram
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹52,500
Yes
12 Dec 2025
15 May 2025
27 May 2025
15 May 2025
27 May 2025
15 May 2025
Amount
Removal of Existing Modern tiles from the walls and Floor of the shannathy including all cost of Labour and cost of tranportation, complete etc., as per standard Specifications
Earthwork excavation for foundation in all soils except hard rock requiring blasting to a full depth with initial lead of 10 m and lift of 2 etc., complete (SS 20B) as directed by the Dept. Officers.
Supplying and filling in foundation and basement with filling M-sand in layers of 150mm 3 thickness well watered ramned and consolidated complying with relevant std specification including cost of supplying filling M-sand.
Cement concrete 1:5:10 (One of cement five of M-sand and ten of HBG jelly )for foundation using 40mm gauge HBG jelly inclusive of shoring strutting and baling out water where ever necessary ramming curing etc., complete as per Std, Specification and as directed by the Dept, Officers
Brick work in Cement Mortar 1:5 using 2nd class ground moulded Chamber bricks size 9" 5 x 43/8" x 23/4 including cost and conveyance of all materials and labour charges and all other pcidental charges etc complete complying with standard specification.
Plastering with Cement mortar 1 5,12mm thick including cast and conveyance of all materials and all labour charges, curing etc.complete complying with standard spectations
Flooring with cut stone slab of size 600mmX600mm and other sizes suitable for site requirement not less than 100mm thick with machine cut edges and top surface dressed as directed by the departmental officers including cost and conveyance of materials to site and lobour charges for paving and Pointing With Lime Martor 1:2 etc complete. single line dressing
Refixing of removed paver block incluming cost and convevance labour, handling as per instruction of departmental officers etc. complete
Sub total
S K G CONSTRUCTION (BID ID -1350175)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_666993.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .