| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | ₹4.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹5.2 LRejected-AOC | ₹5.2 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M VIJEYARAMAN L1 | A N KANNAN L2 |
|---|---|---|---|---|---|
| 1.01 | Construction of manholes using sulphate resistant cement at various depths to invert including earth work excavation asperSS20B, laying cement concrete in C.M.1:3:6 using 40mm B.G. jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M.1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M.1:3, 20mm thick and exterior with C.M.1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G. jelly fixing the frame, providing C.I. steps, manhole cover and frame etc. complete for the following sizes for each manhole (As per the type design drawing for manholes). Upto 3.50m Depth | 1 | No | 1,31,732.1 ₹1.3 L | 1,39,109.1 ₹1.4 L |
| 2.01 | Upto 3.00m Depth | 2 | No | 1,04,343.6 ₹2.1 L | 1,10,186.8 ₹2.2 L |
| 3.01 | Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3 MDU-CORP-BUILDING DATA-P-18-SL No:1 | 10 | m3 | 205.4 ₹2,054 | 216.9 ₹2,169 |
| 4.01 | Supply of 200 mm dia UN PLASTICIZED PVC PIPES AS PER IS 4985 /2000.,10KSC | 10 | m | 1,089.9 ₹10,899 | 1,150.9 ₹11,509 |
| 5.01 | Laying and jointing PVC slotted pipes in the inflitration gallery excluding cost of pipes but including charges for special tools and plants etc., complete such as air compressor and helmet. | 10 | m | 256.2 ₹2,562 | 270.5 ₹2,705 |
| 6.01 | Supply and Fixing of FRC frame with manhole cover 600mm dia (heavy duty) etc.complete… | 9 | No | 2,672.3 ₹24,050.70 | 2,821.9 ₹25,397.10 |
| 7.01 | Rising the existing circular manhole in heavy type including the removing the existing the manhole cover with frame and dismanting the existing the cement concrete wall and tar road surface around tha manhole using 1:2:4 20mm jally for raising the existing the manhole wall and using 1:2:4 with 20mm chips for finishing the top surface of manhole etc complete. | 11 | No | 3,264.7 ₹35,911.70 | 3,447.5 ₹37,922.50 |
| 8.01 | Add GST 18% | 1 | GST | 74,861.4 ₹74,861.40 | 79,053.6 ₹79,053.60 |
Tender Value
₹4.9 L
EMD Value
₹4,912
Closing Date
6 Jan 2026, 3:00 pmClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai, Thallakulam, Madurai.
Construction of new manhole and Inter connection supply of FRC Manhole and Manhole Raising at various places in ward 85.
2025_MAWS_635822_1
E3/451/25-26
Open Tender
Civil Works
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹4,912
10 Feb 2026
27 Dec 2025
6 Jan 2026
27 Dec 2025
6 Jan 2026
27 Dec 2025
Amount
Construction of manholes using sulphate resistant cement at various depths to invert including earth work excavation asperSS20B, laying cement concrete in C.M.1:3:6 using 40mm B.G. jelly for foundation, sinking well kerb below G.L. for 4.5m depth and above, pumping, timbering charges for 2.5m depth and above, stock brick work in C.M.1:3, for 23cm thick wall and over 23cm thick wall, plastering interior with C.M.1:3, 20mm thick and exterior with C.M.1:3, 12mm thick, laying plain cement concrete 1:3:6 using 12.0mm to 20mm B.G. jelly fixing the frame, providing C.I. steps, manhole cover and frame etc. complete for the following sizes for each manhole (As per the type design drawing for manholes). Upto 3.50m Depth
Upto 3.00m Depth
Earth work excavation in all kinds of soils except hard rock requiring blasting, inclusive of shoring, strutting and baling out water wherever necessary refilling the sides of foundation with excavated earth in layers of 15cm thick well rammed and consolidated depositing the surplus earth within compound in places as shown by the deptl.officers, clearing and leveling the site with initial lead of 10M and lift of 2M etc.Comp.SI.No.62-rate for 10m3 MDU-CORP-BUILDING DATA-P-18-SL No:1
Supply of 200 mm dia UN PLASTICIZED PVC PIPES AS PER IS 4985 /2000.,10KSC
Laying and jointing PVC slotted pipes in the inflitration gallery excluding cost of pipes but including charges for special tools and plants etc., complete such as air compressor and helmet.
Supply and Fixing of FRC frame with manhole cover 600mm dia (heavy duty) etc.complete…
Rising the existing circular manhole in heavy type including the removing the existing the manhole cover with frame and dismanting the existing the cement concrete wall and tar road surface around tha manhole using 1:2:4 20mm jally for raising the existing the manhole wall and using 1:2:4 with 20mm chips for finishing the top surface of manhole etc complete.
Add GST 18%
A N KANNAN (BID ID -1552762)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.34 MB
docs14.pdf
Tender Documents • 0.79 MB
BOQ_760916.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid