Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 CrAccepted-AOC | ₹3.9 Cr Quoted ₹4.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹4.4 Cr+₹23.2 L (5.52%)Rejected-Finance | ₹4.4 Cr+₹23.2 L (5.52%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | Eco Paryavaran Engineers And Consultants Pvt. Ltd. L2 | ECOTECH ENGINEERING CO L1 |
|---|---|---|---|---|---|
| 1.00 | BALANCE CAPITAL WORKS (CIVIL, MECHANICAL AND ELECTRICAL) OF 5 MLD CAPACITY STP AT DHURI BASED ON SBR TECHNOLOGY FOR SUCCESSFUL COMMISSIONING OF STP | 1 | Job | 2,50,34,000 ₹2,50,34,000 | 1,97,00,000 ₹1,97,00,000 Lowest |
| 2.00 | OPERATION AND MAINTENANCE OF 5 MLD CAPACITY STP AT DHURI FOR A PERIOD OF 60 MONTHS AFTER STABILIZATION PERIOD OF 3 MONTHS OR MORE. | 1 | Job | 1,70,44,058 ₹1,70,44,058 Lowest | 2,47,00,000 ₹2,47,00,000 |
Tender Value
Refer Docs
EMD Value
₹7.9 L
Closing Date
25 Aug 2025, 5:00 pmClosed
Executive Engineer
O/o Executive Engineer, Pb. W/S and Sew. Divn., Sangrur.
Remaining Balance work left by SPCL-KIPL JV as per scope of work for Commissioning of 5 MLD capacity STP at Dhuri based on SBR technology including operation and maintenance for a period of 60 months after stabilization period of 3 months or more.
2025_DLG_146283_2
BID NO.18(1) DATED 01.08.2025
Open Tender
Miscellaneous Works
Lump-sum
90 days
Dhuri
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹7.9 L
Sangrur
3 Oct 2025
18 Aug 2025
26 Aug 2025
18 Aug 2025
25 Aug 2025
18 Aug 2025
19 Aug 2025
Amount
BALANCE CAPITAL WORKS (CIVIL, MECHANICAL AND ELECTRICAL) OF 5 MLD CAPACITY STP AT DHURI BASED ON SBR TECHNOLOGY FOR SUCCESSFUL COMMISSIONING OF STP
OPERATION AND MAINTENANCE OF 5 MLD CAPACITY STP AT DHURI FOR A PERIOD OF 60 MONTHS AFTER STABILIZATION PERIOD OF 3 MONTHS OR MORE.
Description of Work / Item(s)
Amount
Remaining Balance work left by SPCL-KIPL JV as per scope of work for Commissioning of 5 MLD capacity STP at Dhuri Distt. Sangrur based on SBR technology including operation and maintenance for a period of 60 months after stabilization period of 3 months or more.
CREDIT OF SLUDGE (-)
ECOTECH ENGINEERING CO (BID ID -671782)
Eco Paryavaran Engineers And Consultants Pvt. Ltd. (BID ID -671692)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
DNIT2.pdf
Tender Documents • 23.66 MB
DNIT3.pdf
Tender Documents • 17.01 MB
BOQ_299095.xls
BOQ • 0.28 MB
DNIT1.pdf
Tender Documents • 16.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .