| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹5.9 LAccepted-AOC RAHIMPUR VILLAGE BIJNOR DISTRICT BIJNOR | BIJNOR | UTTAR PRADESH | 246701 | L 1 | Accepted-AOC All Documents Condition are Fullfiled | |
| 2 | L 2₹6.3 L+₹39,658.61 (6.67%)Rejected-Finance N A | FARIDABAD | HARYANA | 121004 | L 2 | Rejected-Finance L 2 | |
| 3 | Rejected-Technical PLEASE PROVIDE THE DOCUMENT CONTAINING THE ADDRESS | NEW DELHI | DELHI | 110001 | - | Rejected-Technical The validity Period of the Character Certificate has Expired and the turnover certificate for 2025-26 is not attached | |
| 4 | Rejected-Technical | - | Rejected-Technical The 90 days stamp is signed but not dated and has no receipt stamp and Self Attested Cerificate not date ticket |
| Sl No | Description | Qty | Unit | CHHATAR PAL SINGH CONTRACTOR L1 | SHEESHPAL SINGH CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in Excavation of foundation i/c upto 30.00 Mtr. & lift upto 1.50 Mtr. | 128.22 | cum | 120 ₹15,386.4 Lowest | 125 ₹16,027.5 |
| 2.00 | Shuttering /From work for P.C.C including cost of materials labour and T&P etc Complete | 32.54 | sqm | 270 ₹8,785.8 Lowest | 285 ₹9,273.9 |
| 3.00 | Providing and Laying M-10 C. C (1:3:6) including cost of materials Labour and T&P etc Complete | 11.71 | cum | 6,200 ₹72,602 Lowest | 6,300 ₹73,773 |
| 4.00 | M-105 Brick work in 1:4 cm. including cost of materials Labour and T&P etc Complete | 41.1 | cum | 5,500 ₹2,26,050 Lowest | 5,725 ₹2,35,297.5 |
| 5.00 | Providing and Laying M-15 C.C (1:2:4) including cost of materials Labour and T&P etc Complete | 19.85 | cum | 6,600 ₹1,31,010 Lowest | 6,800 ₹1,34,980 |
| 6.00 | Providing and Laying /Lining wearing coat of 10 cm. thick M-20 C.C (1:1:5:3) including cost of materials Labour and T&P etc Complete | 1.26 | cum | 7,300 ₹9,198 Lowest | 7,400 ₹9,324 |
| 7.00 | Struck deep pointing in 1:3 cm i/c including cost of materials Labour and T&P etc Complete | 267.79 | sqm | 102 ₹27,314.58 Lowest | 121 ₹32,402.59 |
| 8.00 | S/F Drainage Spout PVC in 150mm Dia Pipe including cost of materials Labour and T&P etc Complete | 4 | RM | 550 ₹2,200 Lowest | 570 ₹2,280 |
| 9.00 | Providing and Laying First class Brick on edge soiling 110 mm thick including cost of materials Labour and T&P etc Complete | 30.8 | sqm | 425 ₹13,090 Lowest | 500 ₹15,400 |
| 10.00 | Cement Plaster(1:3)12 mm thick on brick work including cost of materials Labour and T&P etc Complete | 152.76 | sqm | 140 ₹21,386.4 Lowest | 170 ₹25,969.2 |
Tender Value
₹6.5 L
EMD Value
₹13,000
Closing Date
28 May 2026, 2:00 pmClosed
Executive Engineer
MGCQCDiv-2 Haridwar
Construction of 1.3 M Drop Fall at km. 1.500 of Obari Minor
2026_UPIDC_1136542_10
01/EE/2026-27
Open Tender
Civil Works - Canal
Item Wise
30 days
Chandausi Branch
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹13,000
16 Jul 2026
21 May 2026
28 May 2026
21 May 2026
28 May 2026
21 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in Excavation of foundation i/c upto 30.00 Mtr. & lift upto 1.50 Mtr. | 1 | cum | - | - |
| 2 | Shuttering /From work for P.C.C including cost of materials labour and T&P etc Complete | 1 | sqm | - | - |
| 3 | Providing and Laying M-10 C. C (1:3:6) including cost of materials Labour and T&P etc Complete | - | cum | - | - |
| 4 | M-105 Brick work in 1:4 cm. including cost of materials Labour and T&P etc Complete | - | cum | - | - |
| 5 | Providing and Laying M-15 C.C (1:2:4) including cost of materials Labour and T&P etc Complete | - | cum | - | - |
| 6 | Providing and Laying /Lining wearing coat of 10 cm. thick M-20 C.C (1:1:5:3) including cost of materials Labour and T&P etc Complete | - | cum | - | - |
| 7 | Struck deep pointing in 1:3 cm i/c including cost of materials Labour and T&P etc Complete | - | sqm | - | - |
| 8 | S/F Drainage Spout PVC in 150mm Dia Pipe including cost of materials Labour and T&P etc Complete | - | RM | - | - |
| 9 | Providing and Laying First class Brick on edge soiling 110 mm thick including cost of materials Labour and T&P etc Complete | - | sqm | - | - |
| 10 | Cement Plaster(1:3)12 mm thick on brick work including cost of materials Labour and T&P etc Complete | 1 | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_2155654.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .