Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.5 LAccepted-AOC C O M KHARKARANG LUMJINGSUK BLOCK A MADANRTING SHILLONG 793021 | SHILLONG | EAST KHASI HILLS | MEGHALAYA | 793021 | ₹43.5 L Quoted ₹45.1 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹45.5 L+₹35,428.50 (0.79%)Rejected-AOC | ₹45.5 L+₹35,428.50 (0.79%) | L2 | Rejected-AOC Being L2 |
| 3 | L3₹46.2 L+₹1.1 L (2.35%)Rejected-AOC | ₹46.2 L+₹1.1 L (2.35%) | L3 | Rejected-AOC Being L3 |
| 4 | L4₹47.4 L+₹2.3 L (5.05%)Rejected-AOC MISSION CHARIALI NH 37 A PO KETEKIBARI TEZPUR 784 154 ASSAM | SONITPUR | ASSAM | 784154 | ₹47.4 L+₹2.3 L (5.05%) | L4 | Rejected-AOC Being L4 |
| 5 | L5₹47.6 L+₹2.5 L (5.61%)Rejected-AOC KALIBARI BAZAR TUPKHANA PART I PO ARUNACHAL P S SILCHAR DISTT CACHAR ASSAM 788 025 | SILCHAR | CACHAR | ASSAM | 788025 | ₹47.6 L+₹2.5 L (5.61%) | L5 | Rejected-AOC Being L5 |
| Sl No | Description | Qty | Unit | M/S M P Sharma L7 | M/S TAPAN KUMAR RAY L3 | MS AFTAB LASKAR L2 | Bhuiya Construction L1 | SURANA CORPORATION L8 | m/s builders and suppliers L9 | M/S SANJIB DEB L5 | M/S SUBHAM ENTERPRISE L6 | LUIT CONSTRUCTION L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00B & R Division Items | ||||||||||||
| 2.00 | Demolition of cement concrete (unreinforced) in ground floors and pavings n exc 15 cm thickness (below or above ground level) complete all as specified and directed. | 20.6 | Cum | 535 ₹11,021 | 505 ₹10,403 | 505 ₹10,403 | 490 ₹10,094 Lowest | 595 ₹12,257 | 545 ₹11,227 | 545 ₹11,227 | 615 ₹12,669 | 532 ₹10,959.2 |
| 3.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) removing serviceable tiles to stores and rubbish off the premises complete all as specified and directed. | 320 | Sqm | 32 ₹10,240 | 44 ₹14,080 | 48 ₹15,360 | 35 ₹11,200 | 50 ₹16,000 | 45 ₹14,400 | 36 ₹11,520 | 55 ₹17,600 | 30 ₹9,600 Lowest |
| 4.00 | Dismantling of wall and ceiling boards (fibre, pulp, insulation boards etc) any thickness including cover fillets complete all as specified and directed. | 260 | Sqm | 34 ₹8,840 | 27 ₹7,020 | 28 ₹7,280 | 22 ₹5,720 Lowest | 33 ₹8,580 | 37 ₹9,620 | 36 ₹9,360 | 35 ₹9,100 | 32 ₹8,320 |
| 5.00 | Dismantling boarding any desription ,fixed in any position with nails complete all as specified and directed. | 240 | Sqm | 39 ₹9,360 | 48 ₹11,520 | 43 ₹10,320 | 35 ₹8,400 | 44 ₹10,560 | 52 ₹12,480 | 47 ₹11,280 | 45 ₹10,800 | 34 ₹8,160 Lowest |
| 6.00 | Taking down Chowkhats or frames not exc. 1.5 sq m each with shutters (without taking off shutters from the frames) complete all as specified and directed. | 15 | Each | 315 ₹4,725 | 200 ₹3,000 | 155 ₹2,325 | 145 ₹2,175 Lowest | 228 ₹3,420 | 230 ₹3,450 | 300 ₹4,500 | 230 ₹3,450 | 322 ₹4,830 |
| 7.00 | Taking down Chowkhats or frames exc 1.5 sq. m but n exc 4 sq. m each with shutters (without taking off shutters from the frame) complete all as specified and directed. | 25 | Each | 335 ₹8,375 | 220 ₹5,500 | 205 ₹5,125 | 195 ₹4,875 Lowest | 235 ₹5,875 | 237 ₹5,925 | 320 ₹8,000 | 250 ₹6,250 | 329 ₹8,225 |
| 8.00 | Taking down shutters of any description exc 1 sqm and n exc 2 sqm each complete all as specified and directed. | 5 | Leaf | 333 ₹1,665 | 138 ₹690 | 133 ₹665 | 125 ₹625 Lowest | 148 ₹740 | 150 ₹750 | 330 ₹1,650 | 152 ₹760 | 339 ₹1,695 |
| 9.00 | Taking up or down GI tubing and connection 15 mm bore, including cleaning for refixing complete all as specified and directed. | 200 | RM | 32 ₹6,400 | 32 ₹6,400 | 27 ₹5,400 | 23 ₹4,600 Lowest | 36 ₹7,200 | 37 ₹7,400 | 38 ₹7,600 | 34 ₹6,800 | 37 ₹7,400 |
| 10.00 | M&L for 75mm th PCC 1:3:6 type C-2 using 40mm graded agg as in plinth protection finished even and smooth w/out using extra cement complete all as specified and directed. | 158 | Sqm | 758 ₹1,19,764 | 715 ₹1,12,970 | 705 ₹1,11,390 Lowest | 715 ₹1,12,970 | 748 ₹1,18,184 | 755 ₹1,19,290 | 756 ₹1,19,448 | 755 ₹1,19,290 | 761 ₹1,20,238 |
Tender Value
₹42.8 L
EMD Value
₹85,600
Closing Date
7 Jul 2026, 6:00 pmClosed
GE SILCHAR
Office of the GE Silchar Masimpur Cantt
COMPREHENSIVE MAINT OF GROUP B BLDGS OF CIJW SCHOOL VAIRENGTE
2026_MES_772260_1
8165A/E8
Open Tender
Civil Works
Item Rate
270 days
Vairengte
Class D Category a i and other criteria as per NIT and Tender Doc
8 documents required · 8 mandatory
₹500
GE Silchar
₹85,600
Yes
20 Aug 2026
15 Jun 2026
10 Jul 2026
15 Jun 2026
7 Jul 2026
30 Jun 2026
15 Jun 2026 - 22 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | B & R Division Items | - | - | - | - |
| 2 | Demolition of cement concrete (unreinforced) in ground floors and pavings n exc 15 cm thickness (below or above ground level) complete all as specified and directed. | 20.6 | Cum | - | - |
| 3 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing) removing serviceable tiles to stores and rubbish off the premises complete all as specified and directed. | 320 | Sqm | - | - |
| 4 | Dismantling of wall and ceiling boards (fibre, pulp, insulation boards etc) any thickness including cover fillets complete all as specified and directed. | 260 | Sqm | - | - |
| 5 | Dismantling boarding any desription ,fixed in any position with nails complete all as specified and directed. | 240 | Sqm | - | - |
| 6 | Taking down Chowkhats or frames not exc. 1.5 sq m each with shutters (without taking off shutters from the frames) complete all as specified and directed. | 15 | Each | - | - |
| 7 | Taking down Chowkhats or frames exc 1.5 sq. m but n exc 4 sq. m each with shutters (without taking off shutters from the frame) complete all as specified and directed. | 25 | Each | - | - |
| 8 | Taking down shutters of any description exc 1 sqm and n exc 2 sqm each complete all as specified and directed. | 5 | Leaf | - | - |
| 9 | Taking up or down GI tubing and connection 15 mm bore, including cleaning for refixing complete all as specified and directed. | 200 | RM | - | - |
| 10 | M&L for 75mm th PCC 1:3:6 type C-2 using 40mm graded agg as in plinth protection finished even and smooth w/out using extra cement complete all as specified and directed. | 158 | Sqm | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.13 MB
8165A-TP.pdf
Tender Documents • 0.51 MB
BOQ_864744.xls
BOQ • 0.42 MB
8165A-SchofCreditformat.pdf
Additional Documents • 0.03 MB
Amendment_8165A.pdf
PDF • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .