Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.4 LAdmitted-Finance | ₹43.4 L | L1 | Admitted-Finance |
| 2 | L2₹48.0 LAdmitted-Finance | ₹48.0 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | EMIT Projects Private Limited L1 | Classic Enterprises L2 |
|---|---|---|---|---|---|
| 1.00 | a)Charges for providing Skilled Electrician for maintenance of Electrical Installation under Banga Bhawan Electrical section, PWD three Shifts Arround The Clock (3 Heads x 12 Months= 36 Heads) | 36 | Head / month | 39,000 ₹14.0 L | 41,600 ₹15.0 L |
| 2.00 | b)Charges for providing Semi Skilled Electrician for maintenance of Electrical Installation under Banga Bhawan Electrical section, PWD three Shifts arround the clock (01 HeadsX 3 Shifts x 12 Months)= 72 Heads | 36 | Head / month | 34,970 ₹12.6 L | 39,280 ₹14.1 L |
| 3.00 | c)Charges for providing Semi skilled lift Operator/ attendant for lift operation under Banga Bhawan Electrical section, PWD three Shifts (4Heads x 12 Months) = 48 Heads | 48 | Head / month | 34,970 ₹16.8 L | 39,280 ₹18.9 L |
| 4.00Agency should pay minimum wages and E.S.I & P.F of engaged persons as per recent labour act. | |||||
Tender Value
Refer Docs
EMD Value
₹1.0 L
Closing Date
29 May 2026, 12:00 pmClosed
The Executive Engineer, Kolkata Electrical Div
The Executive Engineer Kolkata Electrical Division P.W.Dte. BlockI (1st Floor)Writers Buildings,Kolkata 700001
Routine , preventive and Break down Maintenance of EI of Banga Bhawan-II, 2, Pt Uma Sankar Dixit Marg, New Delhi attending emergency breakdown of LT Panel and allied sevice like DG set, Lift under Banga Bhawan Electrical Section, PWD
2026_WBPWD_5013898_1
WBPWD/EEKED/eNIT-56/2nd/25-26
Open Tender
ELECTRICAL WORKS ORG
365 days
Banga Bhawan II New Delhi
Please refer Tender documents.
6 documents required · 6 mandatory
₹1.0 L
O/O The Executive Engineer Kolkata Electrical Divi
11 Jun 2026
11 May 2026
1 Jun 2026
11 May 2026
29 May 2026
21 May 2026
20 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 0.0 | a)Charges for providing Skilled Electrician for maintenance of Electrical Installation under Banga Bhawan Electrical section, PWD three Shifts Arround The Clock (3 Heads x 12 Months= 36 Heads) | 36 | Head / month | - | - | Dismantling of the existing ductable AC machine, including both indoor and outdoor units, by deploying skilled AC technicians with their own tools, tackles, and necessary arrangements. |
| 0.0 | b)Charges for providing Semi Skilled Electrician for maintenance of Electrical Installation under Banga Bhawan Electrical section, PWD three Shifts arround the clock (01 HeadsX 3 Shifts x 12 Months)= 72 Heads | 36 | Head / month | - | - | Dismentling the existing split Acs from existing location Part by part outdoor as well as indoor and shifing this machins to the store as per direction of EIC |
| 0.0 | c)Charges for providing Semi skilled lift Operator/ attendant for lift operation under Banga Bhawan Electrical section, PWD three Shifts (4Heads x 12 Months) = 48 Heads | 48 | Head / month | - | - | SITC Microprocessr Controlled, DX Type ceiling suspended Ductable Air conditioner Unit(Latest QCO) with all necessary acessories for hanging Indoor& Outdoor unit as per site condition having following specification i) Refrigerent-R410A/R407C ii) Expansion Valve:Thermostatic/Electronics iii) Compressor :Scroll/TwinRotary with Fixed speed v) ODU: Outdoor Unit Air cooled Condenser unit With Copper coil with Aluminium fins having single compact ODU or multiple ODU unit vi) IDU: Indoor Unit having synthetic Filter and wireless/Wire Remote Vii) CFM: 400/Tr viii)Protection: Single Phase Preventer, phase reversal preventer, HP/LP cut Out. ix)Power sypply: 415+/- 10%, 50Hz x)Ambient temperature: 42°C +/- 5°C (Tollerance) Make: (Make:Hitachi/Daikin/ Blue Star) no extra shal be payable for refrigerant gas & transportation/shifting work. |
| 0.0 | Agency should pay minimum wages and E.S.I & P.F of engaged persons as per recent labour act. | - | - | - | - | Min :36.75Kw (2 No compressor) |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
termsandconditions.pdf
Tender Documents • 0.73 MB
2911.pdf
Other Document • 0.54 MB
BOQ_5081770.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid