| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.1 LAccepted-AOC 64 220 MAIN ROAD KATAINAR BANKI MONGRA KORBA CG 495455 | KORBA | CHHATTISGARH | 495455 | ₹13.1 L | L1 | Accepted-AOC Technically and financially eligible L1 Bidder |
| 2 | L2₹14.5 L+₹1.4 L (10.8%)Rejected-Finance BEHIND OF PAWAN TALKIES ROAD KORBA CG 495678 | 495678 | ₹14.5 L+₹1.4 L (10.8%) | L2 | Rejected-Finance Not L1 Bidder |
| 3 | L3₹16.0 L+₹2.9 L (22.1%)Rejected-Finance | ₹16.0 L+₹2.9 L (22.1%) | L3 | Rejected-Finance Not L1 Bidder |
| 4 | L4₹16.1 L+₹3.1 L (23.5%)Rejected-Finance QTR NO 1B 48 SBS COLONY SECL KORBA C G | KORBA | KORBA | CHHATTISGARH | 495677 | ₹16.1 L+₹3.1 L (23.5%) | L4 | Rejected-Finance Not L1 Bidder |
| 5 | L5₹17.1 L+₹4.0 L (30.9%)Rejected-Finance MUNGADIH POST BAKSAHI TAH PALI KORBA CG 495449 | KORBA | KORBA | CHHATTISGARH | 495449 | ₹17.1 L+₹4.0 L (30.9%) | L5 | Rejected-Finance Not L1 Bidder |
| Sl No | Description | Qty | Unit | RAKESH KUMAR RANJAN L3 | VIJAY KUMAR YADAV L4 | SATISH CHATURVEDI L6 | MAA RADHA ENTERPRISES L7 | SANSKAR CONSTRUCTION L1 | M/S DEEPAK KUMAR DIXENA L5 | SATPAL SHARMA L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Civil Works | ||||||||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 320 | Cum | 97 ₹31,040 | 93.7 ₹29,984 | 100 ₹32,000 | 187 ₹59,840 | 80 ₹25,600 Lowest | 120 ₹38,400 | 96.52 ₹30,887.27 |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III): 8 graded stone
aggregate 40 mm nominal size) | 32 | Cum | 2,977 ₹95,264 | 2,735 ₹87,520 | 3,000 ₹96,000 | 4,714 ₹1,50,848 | 3,000 ₹96,000 | 2,820 ₹90,240 | 2,428.88 ₹77,724.31 Lowest |
| 1.03 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 32 | Cum | 3,377 ₹1,08,064 | 3,830 ₹1,22,560 | 4,300 ₹1,37,600 | 6,602 ₹2,11,264 | 3,000 ₹96,000 Lowest | 3,950 ₹1,26,400 | 3,401.45 ₹1,08,846.51 |
| 1.04 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources) | 80 | cum | 3,597 ₹2,87,760 | 4,475 ₹3,58,000 | 4,800 ₹3,84,000 | 5,200 ₹4,16,000 | 3,300 ₹2,64,000 Lowest | 4,630 ₹3,70,400 | 3,976.18 ₹3,18,094.78 |
| 1.05 | Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 1,360 | Sqm | 347 ₹4,71,920 | 265 ₹3,60,400 | 285 ₹3,87,600 | 280 ₹3,80,800 | 150 ₹2,04,000 Lowest | 300 ₹4,08,000 | 271.84 ₹3,69,698.62 |
| 1.06 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars | 6,720 | kg | 52 ₹3,49,440 | 59 ₹3,96,480 | 68 ₹4,56,960 | 72 ₹4,83,840 | 62 ₹4,16,640 | 60 ₹4,03,200 | 46.24 ₹3,10,727.42 Lowest |
| 1.07 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 176 | cum | 47 ₹8,272 | 69 ₹12,144 | 60 ₹10,560 | 119 ₹20,944 | 27 ₹4,752 Lowest | 70 ₹12,320 | 61.72 ₹10,862.89 |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | 2,43,316.8 ₹2,43,316.8 | 2,46,075.84 ₹2,46,075.84 | 2,70,849.6 ₹2,70,849.6 | 3,10,236.48 ₹3,10,236.48 | 1,99,258.56 ₹1,99,258.56 Lowest | 2,60,812.8 ₹2,60,812.8 | 2,20,831.52 ₹2,20,831.52 |
Tender Value
₹28.1 L
EMD Value
₹35,200
Closing Date
28 Jun 2025, 5:00 pmClosed
STAFF OFFICER (CIVIL) KORBA AREA SECL
Office of the General Manager, South Eastern Coalfields Limited, CIVIL DEPARTMENT, KORBA AREA KORBA- 495 677(CG)
Construction of RCC drain between the service buildings and green belt fencing from back side of first aid room to the drain near stock no.1 for monsoon preparation at Saraipali OCM.
2025_SECL_337754_1
SECL/GM/KA/C/e-Tender/25-26/47 Dt. 16.06.2025
Open Tender
Civil Works - Others
Item Rate
90 days
Office of the General Manager, SECL, Korba Area
As per NIT
3 documents required · 3 mandatory
₹35,200
20 Dec 2025
17 Jun 2025
30 Jun 2025
18 Jun 2025
28 Jun 2025
18 Jun 2025
18 Jun 2025 - 21 Jun 2025
Amount
Civil Works
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III): 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources)
Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Cold twisted bars
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Total impact of GST for the purpose of CTC
SATPAL SHARMA (BID ID -1162616)
RAKESH KUMAR RANJAN (BID ID -1162556)
VIJAY KUMAR YADAV (BID ID -1164112)
M/S DEEPAK KUMAR DIXENA (BID ID -1164135)
SATISH CHATURVEDI (BID ID -1163132)
MAA RADHA ENTERPRISES (BID ID -1164143)
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_350131.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .