| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H2₹13.2 LAccepted-AOC | ₹13.2 L | H2 | Accepted-AOC - |
| 2 | H1₹13.3 LRejected-Finance | ₹13.3 L | H1 | Rejected-Finance - |
| Sl No | Description | Qty | Unit | M. Kalaimani H1 | S. Moorthy H2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete., | 82.92 | M3 | 265 ₹21,973.80 | 263.75 ₹21,870.15 |
| 2.00 | Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,l aying,curing etc complete., | 8.72 | M3 | 5,520 ₹48,134.40 | 5,518.2 ₹48,118.70 |
| 3.00 | Reinforced Cement concrete 1:11/2:3 mix using 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | 28.35 | M3 | 8,600 ₹2.4 L | 8,593.4 ₹2.4 L |
| 4.00 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., | 138.92 | M2 | 940 ₹1.3 L | 937.6 ₹1.3 L |
| 5.00 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc. | 2,834.53 | kg | 95 ₹2.7 L | 92.95 ₹2.6 L |
| 6.00 | Brick work with cement mortar 1:5 mix using country bricks of size 83/4"x41/4"x2" for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete. | 44.6 | M3 | 7,785 ₹3.5 L | 7,783.2 ₹3.5 L |
| 7.00 | Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc | 474.95 | M2 | 290 ₹1.4 L | 288.2 ₹1.4 L |
| 8.00 | Exterior Emulsion paint Two coats with good quality of approved Emulsion paint including cost of all materials to site and all labour charges for mixing applying and proper curring etc., Complete as per Standard Specifications for 10 sqm | 474.95 | M2 | 275 ₹1.3 L | 271.15 ₹1.3 L |
Tender Value
Refer Docs
EMD Value
₹16,000
Closing Date
11 Sept 2025, 3:00 pmClosed
Executive Officer Thenkarai Town Panchayat
Executive Officer Thenkarai Town Panchayat
Construction of compound wall in ward no 15 RR Park In Thenkarai Town Panchayat
2025_DTP_601068_1
86-4-2025
Open Tender
Civil Works
Construction of compound wall in ward no 15 RR Pa
Pls refer to the Tender Documents
3 documents required · 3 mandatory
₹0
₹16,000
Yes
Executive Officer Thenkarai Town Panchayat
27 Feb 2026
6 Sept 2025
11 Sept 2025
6 Sept 2025
11 Sept 2025
6 Sept 2025
8 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf