Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.3 LAdmitted-Finance | -21.10% | ₹5.3 L | L1 | Admitted-Finance |
| 2 | L2₹5.6 L+₹32,911.44 (6.26%)Admitted-Finance | -16.16% | ₹5.6 L+₹32,911.44 (6.26%) | L2 | Admitted-Finance |
| 3 | L3₹5.7 L+₹39,507.05 (7.52%)Admitted-Finance | -15.17% | ₹5.7 L+₹39,507.05 (7.52%) | L3 | Admitted-Finance |
| 4 | L4₹6.1 L+₹87,275.27 (16.6%)Admitted-Finance | -8.00% | ₹6.1 L+₹87,275.27 (16.6%) | L4 | Admitted-Finance |
| 5 | L5₹6.3 L+₹1.1 L (20.3%)Admitted-Finance | -5.11% | ₹6.3 L+₹1.1 L (20.3%) | L5 | Admitted-Finance |
Tender Value
₹6.7 L
EMD Value
₹13,340
Closing Date
9 Sept 2026, 6:00 pmClosed
EE PHED dn Rajsamand
EE PHED dn Rajsamand
Deepening of open well Under DMFT 17th GC with 1 year Defeat Liability Period In village Jagat Singh ka Kheda Block Railmagra District Rajsamand.
2026_PHCJA_592734_1
EE NIT 54/2026-27
Open Tender
Civil Works - Water Works
Percentage
90 days
Rajsamand
As per TD
5 documents required · 5 mandatory
₹1,000
EE PHED dn Rajsamand
₹13,340
Yes
15 Sept 2026
27 Aug 2026
10 Sept 2026
27 Aug 2026
9 Sept 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | OW DEEPENING WORK | - | - | - | - |
| 2 | Earth work in excavation over areas (exceding 30cm depth, 1.5 mtr in width and I 0 SQM in plan) for construction of open well, lift up to 1.5 Mtr. including taking out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 meter. | - | - | - | - |
| 3 | Hard rock (requiring blasting) | - | - | - | - |
| 4 | From 20 mtr to 26 mtr BGL | - | Cum | 976 | - |
| 5 | Recovery of Hard rock useful material 30% | - | - | - | - |
| 6 | Add extra over item No. 2.39.2-4 for every additional lift of 1.5 Mtr. or part thereof : In Ordinary rock and hard rock. | - | - | - | - |
| 7 | In hard rock | - | Cum | 67 | - |
| 8 | Add 20% extra over item No. 2.39 for excavation in saturated soil where pumping or baling out of water is required, including shoring strutting where required and dewatering. | - | Cum | 195.2 | - |
| 9 | Centering & shuttering with ply wood or steel sheets including strutting , propping, barcing both ways with wooden members and removal of form work up to floor five level for:Walls (any thickness) including attached pilasters, buttresses, plinth and string course.Add extra for shuttering in circular work in plan up to dia 10 m over item no 2.6.1 | - | Sqm | 346.8 | - |
| 10 | Providing and fabricating reinforcement for RCC work including straightening, cutting, bending, placing in position in binding (including cost of binding wire ) all complete up to floor five level. | - | - | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
BOQ_1052304.xls
BOQ • 0.31 MB
TD54.pdf
Tender Documents • 29.76 MB
54-61.pdf
PDF • 0.58 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .