Loading…
Loading…
Tender Value
₹1.8 L
EMD Value
₹3,700
Closing Date
14 Oct 2026, 3:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
BUILDING
13 conditions · 2 needing a document upload
No eligibility criteria is required for works costing less than 50 lakhs
No eligibility criteria is required for works costing less than 50 lakhs
52 conditions · 9 needing a document upload
Whether required test certificates/samples, if any have been uploaded?
Tenderers are requested to ensure the uploading of mandatory documents under the relevant tabs as per check list and put(tick) mark wherever applicable as per CE/Works/Chennai letter No.W.496/Tender policy dt.03.07.2023. The check list is available under DOCUMENTS tab. The check list is only exhaustive. Tenderer should ensure that all the documents required as per relevant clauses are uploaded. The mere submission of documents mentioned in the check list alone will not qualify for the eligibility of the tender.
Multiple L-1 :- In case of more than one L-1 bidders, tender may be awarded to tenderer having higher bid capacity. In case bid capacity is also the same, tenderer having done more value of similar work in last three previous financial years and the current financial year up to the date of opening of tender may be selected for award. Railway reserves the right and may seek the above details within specified period, if not submitted by the tenderers along with the bid.
The tenderer shall clearly specify whether the tender is submitted on his Own (Proprietary Firm) or on behalf of a Partnership Firm / Company / Joint Venture (JV) I Registered Society/ Registered Trust / Hindu Undivided Family( HUF) / Limited Liability Partnership (LLP) etc. , The tenderer(s) shall enclose the attested copies of the requisite documents (including Power of Attorney, if opted) for constitution of their concern as per Cl.14 of GCC-Part-l and as per a)Clause 17 of GCC - Part-1, for JV b)Clause 18 of GCC - Part-I, for Partnership Firm.
Copies of the following documents are to be uploaded: (i) Details such as Name of the tenderer/ Contractor, Validity of DSC, Complete address with pin code, contact number (ii) Copy of PAN card (iii) Copy of GSTIN card.
A copy of NEFT form duly filled in the details as necessary to be uploaded. (The Tenderer/Contractor not having NEFT form may down load the empty NEFT form available in Document site)
Submission of Annexure-V under document verification certificate- As per Advance Correction Slip No.2 dt.13/12/2022 to GCC - 2022, the tenderers shall submit copy of certificate stating that they are not liable to be disqualified and all their statements/documents submitted along with bid are true and factual. Standard format of the certificate to be submitted by the bidder in form Annexuere-V Non-submission of the above Certificate(s) by the bidder shall result in summarily rejection of his/their bid.
Submission of Annexure-V(A) under Document Verification Certificate. In case of other than company/Proprietary firm, Annexure-V(A) shall also be submitted by the each member of a Partnership Firm/ Joint Venture (JV) /Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc., as the case my be. Non-submission of the above Certificate(s) by the bidder shall result in summarily rejection of his/their bid
The contractor should ensure that the staff employed are physically fit, with a sound mind and of good character. To this effect, necessary police clearance certificate should be obtained from local police authorities before the contractor's staff are put into service. This will be in accordance with the Railway Board Letter No. 2020/Sec(CCB)/45/50/Misc Dt.03.02.2020. Refer Annexure I & II.
All the contracts on works/goods/services will be subject to the new GST act as applicable from time to time. Contractors have to register themselves with GST authorities and to furnish the GST registration number in order to process the bills from 01.07.2017
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Deployment Of Qualified Engineers At Work Sites By The Contractor. The contractor shall also employ Qualified Graduate Engineer or Qualified Diploma Holder Engineer, based on value of contract, as may be prescribed by the Ministry of Railways through separate instructions from time to time.(As per RB ltr no.2012/CE-I/CT/O/20 dt:10.05.2013)
One qualified Graduate Engineer when the cost of the work is Rs. 200 lakhs and above.
One qualified Diploma holder Engineer when the cost of the work to be executed is more than Rs.25 lakhs but less than Rs.200 lakhs.
In case the contractor fails to employ the technical staff as aforesaid, he shall be liable to pay a an amount of Rs.40,000/ (Rupees Forty thousand) for each month or part thereof for the default incase of Graduate Engineer and Rs.25,000/- (Rupees Twenty five thousand) for each month or part thereof for the default in case of Diploma holder (Engineer)
I/WE also hereby agree to abide by the INDIAN RAILWAY GENERAL CONDITIONS OF CONTRACT- April 2022, with all correction slips up to date and to carry out the works accordingly.
Until a formal agreement is prepared and executed, acceptance of this tender shall constitute a binding contract between us subject to modifications, as may be mutually agreed to between us and indicated in the letter of acceptance of my/our offer for this work.
I/We also agree to keep this tender open for acceptance for a period of 60 days from the date fixed for opening the same
I/We offer to do the work for DRM/W/O/SA, at the rates quoted in the attached schedule and hereby bind myself/ourselves to complete the work in all respects within the period of completion stipulated in the tender document, from the date of issue of letter of acceptance of the tender. The Bid security shall stand forfeited without prejudice to any other right or remedies in case my/our Tender is accepted and if : (a) I/We do not execute the contract documents as stipulated in performance guarantee clause of GCC as detailed in general instructions. (b) I/We do not commence the work within seven days after receipt of orders to that effect.
I/We hereby Confirm that the rates, rebates and/or other financial terms, if any, quoted by us in the relevant fields of the Financial Bid page will only be the ruling terms for deciding the inter-se ranking, and any such condition having financial repercussions, if quoted by us anywhere else including attached documents shall not be considered for deciding inter-se ranking
However, Railways shall have the right to incorporate any such condition quoted by us, in the contract, at their discretion, if contract is placed on us.
I/We have read the various conditions attached/ referred to in this tender document, and agree to abide by the said conditions.
A tenderer claiming credentials as an individual for their share in a partnership firm, has to submit both the deeds of (i) partnership deed, showing % of their share and (ii) retirement deed from the partnership firm(or) deed showing the closure of business operations of the partnership firm, as applicable. Failing to submit the above deeds, the offer of the tenderer will be summarily rejected.
Advance Correction Slip No.11 to the Indian Railway Standard General Conditions of Contract (April 2022) has been incorporated and copy uploaded for reference.
Bidders are requested to submit the Performance Guarantee (PG) strictly in accordance with the new prescribed format and within the stipulated timeline to avoid any delay in processing. (Copy enclosed)
Maintenance period of four (4) years shall be stipulated for works involving construction of ROB/RUB/LHS, new Rail Bridges/ROR, and rebuilding of existing bridges, to ensure quality and standardization across Zonal Railways; whereas, for construction of quarters and other buildings, a maintenance period of up to three (3) years shall be applicable as per Dy. CVO/Engg letter No. VO/E/Sys.Imp dated 17/02/2026.
SA Division: Dismantling of condemned old station buildings at APN, MPLI,ETP, PDKM, MLYR, PRV and MKSP in SA-VRI section (Note: Bidder to pay the Bid amount to Railways)
SA-OT-12-2026-04~SR
SA-OT-12-2026-04
Open
Works - General
3 Months
Salem, Tamil Nadu
₹0
₹3,700
21 Sept 2026
21 Sept 2026
30 Sept 2026
3 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 1,82,374.16 | ||
| — | 1.00 | — | — | ||
| Dismantling the Railways buildings not in use viz., station buildings at various locations as listed and to clear and own the released materials out of it on as is where is basis as per special conditions vide Annexures and as directed by the Engineers representative. Note: The tenderer have to make their own arrangements at their cost for dismantling, loading the released following materials, transportation, filling debris at low levels as directed, leveling the ground, labour,safety precautions,security arrangements, clearing the debris, incidental charges etc., complete. Note: 1.The total bid amount thus quoted to be remitted to railways. The bid amount shall exclude cost of hidden RSJ/rails if any, all cost of labour, lead, lift, hire charges for tools and plant and machinery, fuel, consumables, safety and security measures, maintenance charges, taxes, incidental charges,etc., complete by the contractor. 2.All the released materials except hidden RSJ and rails released during dismantling as certified by Engineer in charge shall be moved by the contractor. While dismantling, hidden rails/RSJ are noticed, the same should be removed, stacked and handed over to Railway at nominated locations as per inventory.3.The successful bidder shall remit to the Railways 100% of bid amount with GST, other statutory levies, etc., within Fifteen days from the date of receipt of acceptance of the tender. 4. After payment of 100% of the bid amount with GST and other statutory levies, authorization letter will be issued to dismantle the buildings. After completion of dismantling gate passes will be issued for taking out the released materials from the Railway premises. 5. Details of station buildings to be dismantled as specified. 6. Instructions to the tenderers and special conditions vide Annexure 'B, C & D'. and own to clear the specified released materials such as Mangalore roofing tiles, Mangalore ceiling tiles, Mangalore ridge tiles, rails, bricks, AC sheet and steel items such as angles, doors & Windows except hidden RSJ/rails) on as is where is basis. (The Unit "Set" shall represent total number of units as specified) - Dismantling of condemned station buildings- 7 Nos as per details enclosed as Annexure-A in Senior Section Engineer /Works/ATU section. | — | — | — | 1,82,374.16 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
SCCFORDismantlinDENCentralJurisdiction.pdf
ATTACHMENT
ACS1to10.pdf
ATTACHMENT
ANNEXUREVVAVIAVIB.pdf
ATTACHMENT
INSTRUCTIONSTOTHETENDERER.pdf
ATTACHMENT
ProcedureforLetterofCredit.pdf
ATTACHMENT
Workonhanddetails.pdf
ATTACHMENT
SafetyprecautionstobeadoptedwhileworkinginElectrifiedArea.pdf
ATTACHMENT
Splconditionsofcontractformovementofvehicle.pdf
ATTACHMENT
CheckListandNEFTform.pdf
ATTACHMENT
GCCApril2022NEW.pdf
ATTACHMENT
RBCECEICTImplementationofContractoremb.pdf
ATTACHMENT
RlyBdletterClarificationofAnnexureV.pdf
ATTACHMENT
ANNEXUREIIIFORPOLICEVERIFICATION.pdf
ATTACHMENT
StationBuildingDetails.pdf
ATTACHMENT
NewFormatofBG.pdf
ATTACHMENT
AdvanceCorrectionSlipNo12_.pdf
ATTACHMENT
SPECIFICATIONFORBUILDINGSBRIDGEWORKSDEC2025_1.pdf
ATTACHMENT
ACS112026_compressed.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .