Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 CrAccepted-AOC 122 SAMHARIYA ASOPUR TANDA AMBEDKAR NAGAR UTTAR PRADESH 224190 | AMBEDKAR NAGAR | UTTAR PRADESH | 224190 | ₹4.1 Cr | L1 | Accepted-AOC for being L1 |
| 2 | L2₹4.3 Cr+₹16.0 L (3.86%)Rejected-Finance BLOCK C32 VIKAS NAGAR VIKAS NAGAR NEW DELHI NEW DELHI WEST WEST DELHI DELHI 110059 | WEST DELHI | DELHI | 110059 | ₹4.3 Cr+₹16.0 L (3.86%) | L2 | Rejected-Finance for not being L1 |
| 3 | L3₹4.5 Cr+₹34.2 L (8.28%)Rejected-Finance PLOT NO 69 NEAR ARYAN PUBLIC SCHOOL RAJKISHOR NAGAR BILASPUR C G 495001 | BILASPUR | BILASPUR | CHHATTISGARH | 495001 | ₹4.5 Cr+₹34.2 L (8.28%) | L3 | Rejected-Finance for not being L1 |
| 4 | L4₹4.6 Cr+₹48.8 L (11.8%)Rejected-Finance 81 ARYA NAGAR ASSANDH ROAD PANIPAT HARYANA 132103 | PANIPAT | HARYANA | 132103 | ₹4.6 Cr+₹48.8 L (11.8%) | L4 | Rejected-Finance for not being L1 |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not as per NIT |
| Sl No | Description | Qty | Unit | AXIOM INDIA L3 | POLLUCON TECHNOLOGIES LIMITED L2 | M/s Shiv Construction Company L1 | SURYA INTERNATIONAL ENTERPRISE PRIVATE LIMITED L4 |
|---|---|---|---|---|---|---|---|
| 1.00Part A (1st STP) | |||||||
| 1.01 | Survey, Planning, Designing, Supplying, installing, testing and commissioning of STP of SBR (Sequential Batch Reactor) technology including civil works (except Plant Room), tertiary treatment etc. for building/campus, complete in all respect as per direction of EIC. Capacity of STP:- 1000 KLD. | 1 | Each | 2,52,90,800 ₹2,52,90,800 | 1,20,00,000 ₹1,20,00,000 Lowest | 2,39,97,873.73 ₹2,39,97,873.73 | 2,80,00,000 ₹2,80,00,000 |
| 1.02 | Construction of Plant Room of RCC and Brickwork of suitable size as per requirement with internal water supply/sanitary/electrical installations all complete as per the direction of EIC. | 1 | Each | 7,85,000 ₹7,85,000 | 4,00,000 ₹4,00,000 | 3,00,000 ₹3,00,000 Lowest | 9,80,000 ₹9,80,000 |
| 1.03 | Survey, Planning, Designing and Construction of Sewerage network with non-pressure RCC NP2 class RCC pipes as per approval of EIC of suitable diameters as per design, including inspection chamber and Manhole of suitable size at suitable intervals as per design, connecting sewers to the outlets of houses (including internal pipelines/Chambers for individual houses for sewerage collection from each House), all fittings and fixtures as per requirement complete in all respect. This also include designing of the sewerage network. (Minimum 7500.00 metre length) | 1 | LS | 98,75,300 ₹98,75,300 | 2,10,00,000 ₹2,10,00,000 | 82,50,000 ₹82,50,000 Lowest | 92,00,000 ₹92,00,000 |
| 1.04 | Operation & Maintenance of the STP plant & Sewerage network with all required T&P, consumables, required spares etc. for a period of 05years Capacity of STP:- 1000 KLD and minimum Length of sewer line:- 7500.00 mtr. | 1 | Each | 19,98,000 ₹19,98,000 | 30,00,000 ₹30,00,000 | 25,00,000 ₹25,00,000 | 10,00,000 ₹10,00,000 Lowest |
| 4.00 | Total impact of GST for the purpose of CTC | 1 | Nos | 68,30,838 ₹68,30,838 | 65,52,000 ₹65,52,000 | 63,08,617.27 ₹63,08,617.27 Lowest | 70,52,400 ₹70,52,400 |
Tender Value
₹7.8 Cr
EMD Value
₹9.8 L
Closing Date
21 Mar 2025, 5:00 pmClosed
GM(Civil)/HoD
Alaknanda Building, Darbhanga House, Ranchi
Survey, Planning, Designing, Drawing and Construction including Operation and Maintenance for five years of Construction of STP at Central colony Dhori under AADOCM of Dhori Area on TURNKEY basis.
2025_CCL_328446_1
GM(C)/Tender/2024-25/809H
Turnkey
Miscellaneous Works
Item Rate
2125 days
Dhori Area, CCL
refer tender document
7 documents required · 7 mandatory
₹9.8 L
Online and Ranchi
6 Dec 2025
24 Feb 2025
22 Mar 2025
24 Feb 2025
21 Mar 2025
4 Mar 2025
24 Feb 2025 - 14 Mar 2025
28 Feb 2025
Amount
Part A (1st STP)
Survey, Planning, Designing, Supplying, installing, testing and commissioning of STP of SBR (Sequential Batch Reactor) technology including civil works (except Plant Room), tertiary treatment etc. for building/campus, complete in all respect as per direction of EIC. Capacity of STP:- 1000 KLD.
Construction of Plant Room of RCC and Brickwork of suitable size as per requirement with internal water supply/sanitary/electrical installations all complete as per the direction of EIC.
Survey, Planning, Designing and Construction of Sewerage network with non-pressure RCC NP2 class RCC pipes as per approval of EIC of suitable diameters as per design, including inspection chamber and Manhole of suitable size at suitable intervals as per design, connecting sewers to the outlets of houses (including internal pipelines/Chambers for individual houses for sewerage collection from each House), all fittings and fixtures as per requirement complete in all respect. This also include designing of the sewerage network. (Minimum 7500.00 metre length)
Operation & Maintenance of the STP plant & Sewerage network with all required T&P, consumables, required spares etc. for a period of 05years Capacity of STP:- 1000 KLD and minimum Length of sewer line:- 7500.00 mtr.
Total impact of GST for the purpose of CTC
POLLUCON TECHNOLOGIES LIMITED (BID ID -1143147)
AXIOM INDIA (BID ID -1140576)
SURYA INTERNATIONAL ENTERPRISE PRIVATE LIMITED (BID ID -1138524)
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
BOQ_340455.xls
BOQ • 0.25 MB
164217814.pdf
Tender Documents • 2.36 MB
164217818.html
Tender Documents • 0.06 MB
EvaluationSheetfinal.xls
Tender Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .