Tender Value
₹22.0 L
EMD Value
₹43,920
Closing Date
12 Dec 2024, 6:55 pmClosed
Executive Engineer
Executive Engineer RCC Lower Division Hiranagar
Renovation Upgradtion of Main Ravi Canal From RD 45000M to 45300M at places
2024_IFC_266883_6
e-NIT No. 08 of 2024-25
Open Tender
Civil Works - Canal
Item Rate
35 days
Hiranagar
As per NIT
2 documents required · 2 mandatory
₹600
Executive Engineer RCC Lower Division Hiranagar
₹43,920
Executive Engineer RCC Lower Division Hiranagar
20 Dec 2024
6 Dec 2024
13 Dec 2024
6 Dec 2024
12 Dec 2024
6 Dec 2024
6 Dec 2024 - 10 Dec 2024
10 Dec 2024
Amount
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) Wet
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil :
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand)
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge: 1:3:6 or richer mix (i/c equivalent design mix)
Extra for three additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : All kinds of soil :
Preparing and dressing side slopes of canals for lining.In ordinary soils
Preparing and dressing beds of canals for lining. In ordinary soil
Providing and laying in-situ concrete lining using M-10 nominal mix concrete (max. size of aggregates: 20mm nominal). In side slopes, - at a height over 3.5 m but upto 5.5m above bed
Providing and laying in-situ concrete lining using M-10 nominal mix concrete (max. size of aggregates: 20mm nominal). In beds
Extra over item no. 25.7.2 to 25.7.4 towards allowance for scaffolding
Curing canal lining for 28 days. In beds
Curing canal lining for 28 days. In side slopes
Disposal of silt/Dismantaled Material avg. 2 Km by MT
Carriage of Materials from Source to site of work a) Carriage of Sand and agg. 20MM stone av. 10 Kms by Mechincal Transport
RAHUL SAMOTRA GOVT CONTRACTOR (BID ID -2281727)
M/S NARINDER PAUL SINGH CONTRACTOR (BID ID -2282890)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .