| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.5 LAccepted-AOC | ₹19.5 L | L1 | Accepted-AOC L1 Accepted |
| 2 | L2₹19.6 LRejected-AOC | ₹19.6 L | L2 | Rejected-AOC L2 Rejected |
| Sl No | Description | Qty | Unit | CHANDRASEKARAN C L1 | Akash Rajasekar L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth | 93.78 | Cum | 263.7 ₹24,729.79 | 275 ₹25,789.50 |
| 2.00 | Filling with good river sand including cost and conveyance of all materilas to site and all labours etc., complete | 13.29 | Cum | 2,068 ₹27,483.72 | 2,075 ₹27,576.75 |
| 3.00 | Cement concrete 1:4:8 mix (one cement four sand and eight hard broken stone) using 40mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification | 13.29 | Cum | 5,798 ₹77,055.42 | 5,850 ₹77,746.50 |
| 4.00 | Centering, shuttering and strutting to the soffits of RCC works including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification | 214.94 | Cum | 547.5 ₹1.2 L | 547.5 ₹1.2 L |
| 5.00 | Supplying and fabrication of steel centering for RCC works including cost and conveyance to site and labour charges etc | 3.8 | MT | 91,988.8 ₹3.5 L | 91,988.8 ₹3.5 L |
| 6.00 | PCC 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance to site and labour charges etc | 37.36 | Cum | 9,555 ₹3.6 L | 9,650 ₹3.6 L |
| 7.00 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standar | 4.92 | Sqm | 7,110 ₹34,981.20 | 7,110 ₹34,981.20 |
| 8.00 | Brickwork masonry in C.M 1:5 mix using country bricks including cost and conveyance to site and labour charges etc | 35.55 | Cum | 6,205 ₹2.2 L | 6,205 ₹2.2 L |
| 9.00 | Plastering in C.M 1:5 to 12mm thick including cost and conveyance to site and labour charges etc | 620.93 | Cum | 287.5 ₹1.8 L | 287.5 ₹1.8 L |
| 10.00 | Emulsion painting two coats including cost and conveyance to site and labour charges etc | 620.93 | Sqm | 262.4 ₹1.6 L | 262.4 ₹1.6 L |
Tender Value
₹19.7 L
EMD Value
₹19,710
Closing Date
29 Jan 2026, 9:00 amClosed
The Block Development Officer(BP)
Panchayat Union, Ariyalur
Construction of Compound wall at Arungal Muslim Mayanam in Arungal Panchayat
2026_RDTN_648054_1
R.C.NO.A2/102/2026, Date.12.01.2026
Open Tender
Civil Works - Others
90 days
Ariyalur
As per tender document
5 documents required · 5 mandatory
₹0
₹19,710
24 Mar 2026
28 Jan 2026
29 Jan 2026
28 Jan 2026
29 Jan 2026
28 Jan 2026
Earthwork excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth
Filling with good river sand including cost and conveyance of all materilas to site and all labours etc., complete
Cement concrete 1:4:8 mix (one cement four sand and eight hard broken stone) using 40mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Centering, shuttering and strutting to the soffits of RCC works including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standard specification
Supplying and fabrication of steel centering for RCC works including cost and conveyance to site and labour charges etc
PCC 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance to site and labour charges etc
Cement concrete 1:2:4 mix using 20mm ISS HBG metal for foundation including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing, etc., complete as per standar
Brickwork masonry in C.M 1:5 mix using country bricks including cost and conveyance to site and labour charges etc
Plastering in C.M 1:5 to 12mm thick including cost and conveyance to site and labour charges etc
Emulsion painting two coats including cost and conveyance to site and labour charges etc
Cost and supply of RCC span pipe 0.90m dia including etc., S.Rate p.No.55
Spreading and collected US Gravel watering and hand roller rolling including cost and conveyance to site and labour charges etc
Cost and supply of Steel gate including cost and conveyance to site and labour charges etc
Provision for Bala Paint
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
TechnicalBid1.pdf
Tender Documents • 0.34 MB
PriceBid1.pdf
Tender Documents • 0.24 MB
BOQ_776953.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid