| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹17.0 LAccepted-AOC MORWA SHUKLA MODE WARD NO 2 P O SINGRAULI DISTT SINGRAULI M P PIN 486889 | SINGRAULI | SINGRAULI | MADHYA PRADESH | 486889 | L-1 | Accepted-AOC Accepted as L-1 bidder basis in OPEN TENDER ENQUIRY | |
| 2 | Rejected-Technical SARSAVAH RAJA POST JAYANT DISTT SINGRAULI MP 486890 | JAYANT | SINGRAULI | MP | 486890 | - | Rejected-Technical Rejected as not L-1 |
| Sl No | Description | Qty | Unit | SUNSHINE ENGINEERING L2 | KOHLI & SONS L1 |
|---|---|---|---|---|---|
| 1.00Scope of Work: Repairing of Drag Mechanism of 24/96 Balram Dragline working at Nigahi Project which encluded (A) Replacement / Repairing of foundation and vertical plates beneath Drag Intermediate Gear wheel , Bearing Block along with repairing of structure cracks in Drag Gear Box assembly and (B) Repairing of Fairlead Gate Assembly of 24/96 Balram Dragline working at Nigahi Project. Project. Maximum likely manpower to be deployed per shift : 18 nos ( Supervisor-1 No., Skilled -06 nos , Semiskilled- 06 nos and Unskilled-05 nos. ) | |||||
| 2.00Replacement / Repairing of foundation and vertical plates beneath Drag Intermediate Gear wheel , Bearing Block along with repairing of structure cracks in Drag Gear Box assembly Scope of work : (1) Cleaning of area arround the Gear Box assembly . Drag Drum and intermediate space between Drag and Hoist Drum. (2) Dismantling of complete platform between hoist and Drag Drum to carry out repair / replacement work (3) Preparation of suitable platform around the Gear Box to carry out the repair work. (4) Dismantling of Drag Gear box casing intermidiate Gear wheel and pinion assembly , 2 Nos. Motor pinion shaft of Drag Gear Train. (5) Reparing of Oval holes of Drag Gear box casing. (6) Repairing of foundation structure of intermediatr bearing block by removing bearing block , foundation plate, fabrication of new foundation plate, aligning , setting and welding of foundation plate and bearing block.(7) Rebuilding and co-axila boring of bearing housing. (8) Repairing of cracks in Non-Drive end pedastal of Drag System. (9) DP Test and stress relieving of weld joints carried out in foundation and vertical plates beneath drag intermediuate gear wheel and bearing block (10) Checking and Matching of drag gear train. (11) Assemblies of Drag Gear Train and (12) Refitting of services structure between hoist & Drag Drum. | |||||
| 2.01 | Cost / charges for cleaning of area around the gear box assembly, drag drum and intermediate space between drag & hoist drum including labour charges, contractor profit etc. (labour consisting of Un- skilled manpower) | 1 | job | 72,000 ₹72,000 | 59,510 ₹59,510 Lowest |
| 2.02 | Cost / charges for Dismantling of complete service structure and fabrication of platform between hoist and drag to carry out repair / replacement work and refitting of service structure after completion of repair work including labour charges, contractor profit etc. ( required Skilled welder ,Skilled fitter and Semi-skilled helper manpower ) | 1 | job | 30,000 ₹30,000 | 28,996 ₹28,996 Lowest |
| 2.03 | Cost / charges for Dismantling of drag Gear box casing , intermediuate gear wheel and pinion assembly , 02 Nos. Motor pinion shaft of Drag Gear Train including labour charges, contractor profit etc. ( required Skilled welder ,Skilled fitter and Semi-skilled helper manpower ) | 1 | job | 60,000 ₹60,000 | 52,213 ₹52,213 Lowest |
| 2.04 | Cost / charges for Repairing of Oval holes of Drag gear box cassing ( Top and Bottom) and structural cracks including labour charges, contractor profit etc. ( required Skilled welder ,Skilled fitter and Semi-skilled helper manpower ) | 1 | job | 70,000 ₹70,000 | 65,076 ₹65,076 Lowest |
| 2.05 | Fabricaion charges for hole drilling ( M16) | 40 | hrs. | 300 ₹12,000 | 275 ₹11,000 Lowest |
| 2.06 | Cost / charges for Repair of foundation structure of intermediate bearing block by removing bearing block, foundation plate , fabrication of new foundation plate , aligning , setting and wedlong of foundation plate and bearing block including labour charges, contractor profit etc. ( required Skilled welder ,Skilled fitter and Semi-skilled helper manpower ) | 1 | job | 2,00,000 ₹2,00,000 | 1,95,228 ₹1,95,228 Lowest |
| 2.07 | Cost / charges for repairing of cracks in non-drive end pedastal of drag system including labour charges, contractor profit etc. ( required Skilled welder ,Skilled fitter and Semi-skilled helper manpower ) | 1 | job | 2,00,000 ₹2,00,000 | 1,95,228 ₹1,95,228 Lowest |
| 2.08 | Cost / charges for Assembling of drag gear train including labour charges, contractor profit etc. ( required Skilled welder ,Skilled fitter and Semi-skilled helper manpower ) | 1 | job | 50,000 ₹50,000 | 44,359 ₹44,359 Lowest |
Tender Value
₹16.6 L
EMD Value
₹20,800
Closing Date
24 Jun 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GENERAL MANAGER (EXCAVATION)
OFFICE OF GM(EXCV) NIGAHI PROJECT , NCL , PO-NIGAHI , DISTRICT-SINGRAULI , M.P.
Repairing of Drag Mechanism of 24/96 Balram Dragline working at Nigahi Project which includes (A) Replacement/Repairing of foundationANDVertical Plates beneath Drag Intermediate Gear wheel, Bearing Block along with repairing of structural cracks in D
2025_NCL_336575_1
NGH/EXCV/TENDERS/25-26/018
Open Tender
Excavation Department Work
Item Rate
40 days
NIGAHI PROJECT
AS PER NIT
4 documents required · 4 mandatory
₹20,800
13 Aug 2025
31 May 2025
25 Jun 2025
31 May 2025
24 Jun 2025
2 Jun 2025
31 May 2025 - 10 Jun 2025
Amount
Scope of Work: Repairing of Drag Mechanism of 24/96 Balram Dragline working at Nigahi Project which encluded (A) Replacement / Repairing of foundation and vertical plates beneath Drag Intermediate Gear wheel , Bearing Block along with repairing of structure cracks in Drag Gear Box assembly and (B) Repairing of Fairlead Gate Assembly of 24/96 Balram Dragline working at Nigahi Project. Project. Maximum likely manpower to be deployed per shift : 18 nos ( Supervisor-1 No., Skilled -06 nos , Semiskilled- 06 nos and Unskilled-05 nos. )
Replacement / Repairing of foundation and vertical plates beneath Drag Intermediate Gear wheel , Bearing Block along with repairing of structure cracks in Drag Gear Box assembly Scope of work : (1) Cleaning of area arround the Gear Box assembly . Drag Drum and intermediate space between Drag and Hoist Drum. (2) Dismantling of complete platform between hoist and Drag Drum to carry out repair / replacement work (3) Preparation of suitable platform around the Gear Box to carry out the repair work. (4) Dismantling of Drag Gear box casing intermidiate Gear wheel and pinion assembly , 2 Nos. Motor pinion shaft of Drag Gear Train. (5) Reparing of Oval holes of Drag Gear box casing. (6) Repairing of foundation structure of intermediatr bearing block by removing bearing block , foundation plate, fabrication of new foundation plate, aligning , setting and welding of foundation plate and bearing block.(7) Rebuilding and co-axila boring of bearing housing. (8) Repairing of cracks in Non-Drive end pedastal of Drag System. (9) DP Test and stress relieving of weld joints carried out in foundation and vertical plates beneath drag intermediuate gear wheel and bearing block (10) Checking and Matching of drag gear train. (11) Assemblies of Drag Gear Train and (12) Refitting of services structure between hoist & Drag Drum.
Cost / charges for cleaning of area around the gear box assembly, drag drum and intermediate space between drag & hoist drum including labour charges, contractor profit etc. (labour consisting of Un- skilled manpower)
Cost / charges for Dismantling of complete service structure and fabrication of platform between hoist and drag to carry out repair / replacement work and refitting of service structure after completion of repair work including labour charges, contractor profit etc. ( required Skilled welder ,Skilled fitter and Semi-skilled helper manpower )
Cost / charges for Dismantling of drag Gear box casing , intermediuate gear wheel and pinion assembly , 02 Nos. Motor pinion shaft of Drag Gear Train including labour charges, contractor profit etc. ( required Skilled welder ,Skilled fitter and Semi-skilled helper manpower )
Cost / charges for Repairing of Oval holes of Drag gear box cassing ( Top and Bottom) and structural cracks including labour charges, contractor profit etc. ( required Skilled welder ,Skilled fitter and Semi-skilled helper manpower )
Fabricaion charges for hole drilling ( M16)
Cost / charges for Repair of foundation structure of intermediate bearing block by removing bearing block, foundation plate , fabrication of new foundation plate , aligning , setting and wedlong of foundation plate and bearing block including labour charges, contractor profit etc. ( required Skilled welder ,Skilled fitter and Semi-skilled helper manpower )
Cost / charges for repairing of cracks in non-drive end pedastal of drag system including labour charges, contractor profit etc. ( required Skilled welder ,Skilled fitter and Semi-skilled helper manpower )
Cost / charges for Assembling of drag gear train including labour charges, contractor profit etc. ( required Skilled welder ,Skilled fitter and Semi-skilled helper manpower )
Cost / charges for Checking and Matching of Drag Gear Train including labour charges, contractor profit etc. ( required Skilled welder ,Skilled fitter and Semi-skilled helper manpower )
Cost / charges for DP Test of weld joints carried out in foundation and vertical plates beneath drag intermediate gear wheel and bearing block ( after root, after 3 layer and after final welding)
Repairing of Fairlead Gate Assembly of 24/96 Balram Dragline : Scope of Work: (1) Cleaning of area around the fair lead assembly (2) Dismantling of Horizontal Pulley. (3) Disnalting of LHS and RHS gate assembly by removing 04 Nos. Hinge Pin. (4) Dismantling of 04 Nos. Guide Rollers from gate assembly, assembling & Re-fitting (5) Removal of worn out vertical plate in front of drag rope tray , fabrication and re-fitting. ( 6) Welding of base of 04 Nos. Horizontal pulley. (7) Rebuilding and line boring of 02 Nos. pin housing ( R1 & R4) of Horizontal Pulley. (8) Assembling of Horizontal pulley and fitting (9) Fabrication and fitting of 02 Nos. foundation plate of mounting 04 Nos. rope guard. ( 10) Dismantling of vertical pulley from gate assembly. (11) Assembling of 04 Nos. Vertical pulley in gate assenbly. (12) Assembling of LHS and RHS gate assembly. (13) Fitment of 04 Nos. rope guard.
Cost/ charges for Cleaning of area around the fair lead assembly including labour charges, contractor profit etc. (labour consisting of un skilled manpower)
Cost/ charges for Fabrication of working flatfrom arround fairlead pulley ( Paralle activity) including labour charges contractor profit etc. (labour consisting of Skilled fitter, Skilled welder and semi skilled Helper manpower)
Cost/ charges for Dismatling of 04 Nos. Horizontal Pulley including labour charges, contractor profit etc. (labour consisting of Skilled fitter, Skilled welder and semi skilled Helper manpower)
Cost/ charges for Dismantling of LHS and RHS gate assembly by removing 04 Nos. Hinge including labour charges contractor, profit etc. (labour consisting of Skilled fitter, Skilled welder and semi skilled Helper manpower)
Cost/ charges for Welding of base of 04 Nos. Horizontal pulley including labour charges contractor profit etc. (labour consisting of Skilled fitter, Skilled welder and semi skilled Helper manpower)
Cost/ charges for removal of worn out vertical plate in front of Drag rope tray fabrication and refitting of the vertical plate including labour charges contractor profit etc. (labour consisting of Skilled fitter, Skilled welder and semi skilled Helper manpower)
Cost/ charges for Rebuilding and line boring of 02 Nos. pin housing (R1 and R4) of horizontal pulley and refitting of 04 Nos. horizontal pulley including labour charges contractor profit etc. (labour consisting of Skilled fitter, Skilled welder and semi skilled Helper manpower)
Cost/ charges for Co-axial boring of horizontal pulley housing (04 Nos.)
Cost/ charges for Dismantling of 04 Nos. guide rollers , assembling of guide rollers and re-fitting of gate assembly including labour charges contractor profit etc. (labour consisting of Skilled fitter, Skilled welder and semi skilled Helper manpower)
Cost/ charges for dismantling of 04 Nos. vertical pulley , assembling of vertical pulley and re-fitment in gate assembly including labour charges contractor profit etc. (labour consisting of Skilled fitter, Skilled welder and semi skilled Helper manpower)
Cost/ charges for refitment of gate assembly with throust washer and 04 Nos. Hinge pin including labour charges contractor profit etc. (labour consisting of Skilled fitter, Skilled welder and semi skilled Helper manpower)
Cost/ charges for Repairing and rebuilding of Housing of Hinge pin , repairing of structural cracks and line boring of 04 Nos. hinge pin housing including labour charges contractor profit etc. (labour consisting of Skilled fitter, Skilled welder and semi skilled Helper manpower)
Cost/ charges for Co-axial boring of Gate Assembly housing (04 Nos.)
Cost/ charges for supervision by engaging one number Highly skilled supervisor including labour charges, contractor profit etc. for all the above mentioned job
Cost/ charges for Hiring of welding machines - 04 Nos. with all accessories for all the above jobs
Cost/ charges for Hiring of Gas Cutting Sets. - 04 Nos. with all accessories for all the above jobs
Cost/ charges for Hiring of Grinding machines - 04 Nos. with all accessories for all the above jobs
Hire charges for hydraulic jack 200Ton - 02 Nos. with accessories for the all the above mentioned job
Hire charges for Hand lamps with bulbs 05 Nos. with all accessories for the above mentioned job
Hire charges for Exhaust fan 04 Nos. with all accessories for the above mentioned job
Hire charges for Misc. tools and tackles like hammers, D-shockles, crow-bars, spanners, Jig fixtures etc. for all the above mentioned job.
Hire charges for Transportation 02 Nos. Jeep for all the above mentioned job.
Total impact of GST for the purpose of CTC
SUNSHINE ENGINEERING (BID ID -1161867)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .