Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-Finance 0 0 RAMNAGAR FATEHPUR ROAD KADIRABAD GRAM BUDHWAL PARGANA AND TEHSIL RAMNAGAR BARABANKI UTTAR PRADESH 225202 | BARABANKI | UTTAR PRADESH | 225202 | L1 | Accepted-Finance As per norms of UPPTCL | |
| 2 | L2₹1.7 L+₹4,479.60 (2.70%)Accepted-Finance | L2 | Accepted-Finance As per norms of UPPTCL | |
| 3 | L3₹1.7 L+₹7,056.60 (4.26%)Accepted-Finance | L3 | Accepted-Finance As per norms of UPPTCL |
| Sl No | Description | Qty | Unit | M/s Abhinav Enterprises L3 | shiva enterprises L1 | MISHRA TRADING COMPANY L2 |
|---|---|---|---|---|---|---|
| 1.00Construction of sand pit for 220KV Sub-Station, Kanduni (Sitapur):- | ||||||
| 1.01 | Exacavation of dry soil including lift upto 0.30 Mtr., watering and ramming in the pit and backfilling after completion of work (Exacavation and backfilling both)2x(2x1.5x0.3)m3 | 1.8 | CuM. | 210 ₹378 | 188 ₹338.4 Lowest | 195 ₹351 |
| 1.02 | Base cement concreeting 1:4:8 with 40mm brick balast coarse sand and cement under the floor including cost of all material, Labour, T&P etc to complete the job 2x (2x1.5x0.3)m3 | 1.8 | CuM. | 6,000 ₹10,800 | 5,900 ₹10,620 Lowest | 6,000 ₹10,800 |
| 1.03 | First class brick work in 1:4 cement and coarse sand mortar in pit foundation & walls including cost of all material, labour, T&P etc to complete the job. 2[(1.06x1x0.22)+(2x1x0.22)]+2[(1/2x(1.28x.22x.22)]+(0.22x2x.22)m3 | 3.01 | CuM. | 7,000 ₹21,070 | 6,900 ₹20,769 Lowest | 7,000 ₹21,070 |
| 1.04 | 12mm thick plaster with cement mortar with 1:4 cement and coarse sand mortar on walls of pit including cost of all material, Labour,T&P etc to complete the job. 2x[{(1.5x1)+(2x1)}+{(1.06x1)+(1.56x1)}]+4x{1/2x(1.28x.22)}+2x(1.29x0.22)+(2x0.22)+1.56x.22)m2 | 28.3 | Sq.Cm. | 150 ₹4,245 | 140 ₹3,962 Lowest | 150 ₹4,245 |
| 1.05 | Sand filling including cost of sand, labour T&P required for filling | 6 | CuM. | 1,800 ₹10,800 | 1,740 ₹10,440 Lowest | 1,755 ₹10,530 |
| 2.00Constrcution of Shed for sand pit for 220KV Sub-Station, Kanduni:- | ||||||
| 2.01 | Cement concrete with 20 mm stone ballast coarse sand and cement in ratio of 1:2:4 for grooting of angle (04 Nos leg). (0.3x0.3x0.3)m3 | 2 | CuM. | 6,000 ₹12,000 | 5,938 ₹11,876 Lowest | 6,000 ₹12,000 |
| 2.02 | Grouting of 04 Nos 65x65x6 mm G.I./m.s. Angle post of size 3000 mm after due fabrication with CC mixture in the ratio of 1:2:4 fixing and welding of open hut type G.I./M.S. Angle frame structure of size 3000x2400x2400 mm by due fabrication with 65x65x6 mm size and 50x50 mm size G.I./M.S. angle on above GI/MS angle post by due cutting, drilling, welding etc of GI/MS angle to provided by department of each fire hut. | 2 | Cum. | 15,000 ₹30,000 | 13,388 ₹26,776 Lowest | 13,400 ₹26,800 |
| 2.03 | Fixing and fitting of asbestos corrugated (A.C.) roofing of size 3x4 inch to cover the roof of open hut type GI/MS angle frame structure of size 3000x2400x2400 mm with j hook bolt, nut and washer etc for each fire hut. | 2 | Job | 13,000 ₹26,000 | 12,000 ₹24,000 Lowest | 13,500 ₹27,000 |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
23 Apr 2026, 11:00 amClosed
Executive Engineer
Electricity Transmission Division, UPPTCL, Hussainganj, Sitapur
Work
2026_UPTCL_1131845_1
E-Tender No.16/ETD(S)/2025-26
Open Tender
Electrical Works
Item Rate
30 days
Kanduni (Sitapur)
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Acc. No. 10906917956 IFSC-SBIN0000720
₹2,000
23 Apr 2026
31 Mar 2026
23 Apr 2026
31 Mar 2026
23 Apr 2026
31 Mar 2026
31 Mar 2026 - 23 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of sand pit for 220KV Sub-Station, Kanduni (Sitapur):- | |||||
| 1.01 | Exacavation of dry soil including lift upto 0.30 Mtr., watering and ramming in the pit and backfilling after completion of work (Exacavation and backfilling both)2x(2x1.5x0.3)m3 | - | CuM. | - | - |
| 1.02 | Base cement concreeting 1:4:8 with 40mm brick balast coarse sand and cement under the floor including cost of all material, Labour, T&P etc to complete the job 2x (2x1.5x0.3)m3 | - | CuM. | - | - |
| 1.03 | First class brick work in 1:4 cement and coarse sand mortar in pit foundation & walls including cost of all material, labour, T&P etc to complete the job. 2[(1.06x1x0.22)+(2x1x0.22)]+2[(1/2x(1.28x.22x.22)]+(0.22x2x.22)m3 | - | CuM. | - | - |
| 1.04 | 12mm thick plaster with cement mortar with 1:4 cement and coarse sand mortar on walls of pit including cost of all material, Labour,T&P etc to complete the job. 2x[{(1.5x1)+(2x1)}+{(1.06x1)+(1.56x1)}]+4x{1/2x(1.28x.22)}+2x(1.29x0.22)+(2x0.22)+1.56x.22)m2 | - | Sq.Cm. | - | - |
| 1.05 | Sand filling including cost of sand, labour T&P required for filling | - | CuM. | - | - |
| 2Constrcution of Shed for sand pit for 220KV Sub-Station, Kanduni:- | |||||
| 2.01 | Cement concrete with 20 mm stone ballast coarse sand and cement in ratio of 1:2:4 for grooting of angle (04 Nos leg). (0.3x0.3x0.3)m3 | - | CuM. | - | - |
| 2.02 | Grouting of 04 Nos 65x65x6 mm G.I./m.s. Angle post of size 3000 mm after due fabrication with CC mixture in the ratio of 1:2:4 fixing and welding of open hut type G.I./M.S. Angle frame structure of size 3000x2400x2400 mm by due fabrication with 65x65x6 mm size and 50x50 mm size G.I./M.S. angle on above GI/MS angle post by due cutting, drilling, welding etc of GI/MS angle to provided by department of each fire hut. | - | Cum. | - | - |
| 2.03 | Fixing and fitting of asbestos corrugated (A.C.) roofing of size 3x4 inch to cover the roof of open hut type GI/MS angle frame structure of size 3000x2400x2400 mm with j hook bolt, nut and washer etc for each fire hut. | - | Job | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Tenderdoc.pdf
Tender Documents • 0.17 MB
BOQ_2112168.xls
BOQ • 0.24 MB
bid.pdf
PDF • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .