Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.9 LAccepted-Finance 0 0 0 KHIRKITA DUBEY PAKARI GORAKHPUR UTTAR PRADESH 273412 | GORAKHPUR | UTTAR PRADESH | 273412 | L1 | Accepted-Finance As per prahari lottery System | |
| 2 | L1₹14.9 LRejected-Finance 1 NEAR MODERN GUEST HOUSE COURT ROAD C BUDAUN UTTAR PRADESH 243601 | BUDAUN | BUDAUN | UTTAR PRADESH | 243601 | L1 | Rejected-Finance As per prahari lottery System | |
| 3 | L1₹14.9 LRejected-Finance | L1 | Rejected-Finance As per prahari lottery System | |
| 4 | L1₹14.9 LRejected-Finance | L1 | Rejected-Finance As per prahari lottery System | |
| 5 | L1₹14.9 LRejected-Finance | L1 | Rejected-Finance As per prahari lottery System |
Tender Value
₹17.5 L
EMD Value
₹1.8 L
Closing Date
17 Nov 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer, CD-2, PWD, Budaun.
Bhetajavi to Ulaiya Raod Repair in Financial Year 2026-27 .
2026_CEBLY_1205167_1
1875(8)/Nivida (E.T)/2026 Date 28-10-2026
Open Tender
Civil Works - Roads
Percentage
60 days
CD-2 PWD Budaun
Please refer Tender documents.
3 documents required · 3 mandatory
₹944
₹1.8 L
Yes
Budaun
25 Nov 2026
7 Nov 2026
17 Nov 2026
7 Nov 2026
17 Nov 2026
7 Nov 2026
12 Nov 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth roller to achieve the desired density, complete as per Technical specification clause 401 (A) | 30 | Cum | 4,000 | ₹1,20,000 |
| 2 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, requisite type of screening/binding ,materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 404) | 30 | Cum | 4,800 | ₹1,44,000 |
| 3 | ConConstruction of un-reinforced dowel jointed at expension and construction joint only, plain cement concrete pavement,thickness as per design, over a prepared sub-base, with 43 grade cement or any other type as per clause 1501.2.2 M 30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregates and exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design ,laid in approved fixed side from work (steel channel, laying and fixing of 125 micron thick polythene film , wedges,steel plates including levelling the form work as per drawing),spreading the concrete with shovels ,rakes,compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, admixtures as approved, curing of complete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause (1501) | 90 | Cum | 8,600 | ₹7,74,000 |
| 4 | Construction of embankment with approved material obtained from brrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 30 m per Technical Specification Clause 301.5 ( Carted earth 1 km) | 90 | Cum | 80 | ₹7,200 |
| 5 | Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5m and lead upto 50m as per technical specitication clause 302.3 | 114 | Cum | 190 | ₹21,660 |
| 6 | Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 18 | Cum | 7,200 | ₹1,29,600 |
| 7 | Providing concrete for plain/reinforced concrete (1:2:4) in open foundations complete as per drawings and technical specification Clause 802,803,1202&1203 | 46 | Cum | 7,800 | ₹3,58,800 |
| 8 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specification Clauses 1000 and 1202 | 2.8 | Tonne | 69,000 | ₹1,93,200 |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.43 MB
T1_8.pdf
Tender Documents • 2.15 MB
BOQ_2283253.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .