Tender Value
₹16.4 Cr
EMD Value
₹38.7 L
Closing Date
9 Sept 2026, 4:00 pm
Executive Engineer InFC division Leh
Office of the Executive Engineer InFC division Leh
Construction of Concrete bund at Leh Nallah (Under SDP)
2026_PWD_19435_1
33 of I and FC Division Leh 2026-27
Open Tender
Civil Works - Canal
Percentage
720 days
LEH
Please refer to tender document
3 documents required · 3 mandatory
₹19,368
Payable To Executive Engineer InFC division Leh
₹38.7 L
25 Aug 2026
25 Aug 2026
11 Sept 2026
26 Aug 2026
9 Sept 2026
26 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) in
foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),
including dressing of sides and ramming of bottoms, lift upto 1.5 m, including
getting out the excavated soil and disposal of surplus excavated soil as directed,
within a lead of 50 m.
A. All kinds of soil 80%. | 10,450 | Cum | 278.09 | ₹29,06,040.5 |
| 2 | B. Ordinary rock 20%. | 3,512.5 | Cum | 504.48 | ₹17,71,986 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas
(exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including
getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as
directed by Engineer-in-charge. a) All kind of Soil:-80% | 33,440 | Cum | 208.42 | ₹69,69,564.8 |
| 4 | B. Ordinary rock 20%. | 8,360 | Cum | 383.88 | ₹32,09,236.8 |
| 5 | Earth work in excavation by manual means in foundation trenches or drains (not
exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and
ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and
disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil. | 176.4 | Cum | 445.85 | ₹78,647.94 |
| 6 | Dumping stone excluding cost of stones in Horizontal on level | 1,360.02 | Cum | 232.68 | ₹3,16,449.45 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1,093.2 | Cum | 5,725.33 | ₹62,58,930.76 |
| 8 | Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level :1:3:6 (1 cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size)1:3:6 (1 cement : 3 manufactured sand derived from Recycled Concrete | 12,381.6 | Cum | 8,362.45 | ₹10,35,40,510.92 |
| 9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of
foundations etc. in layers not exceeding 20cm in depth, consolidating each
deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 6,895 | Cum | 220.4 | ₹15,19,658 |
| 10 | Reinforced cement concrete work in walls (any thickness), including attached
pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers,
abutments, posts and struts etc. above plinth level up to floor five level,
excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm
nominal size) | 441 | Cum | 11,102.31 | ₹48,96,118.71 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
Tendernotice_2.pdf
PDF • 2.25 MB
BOQ_46081.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].