Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAccepted-AOC | ₹6.9 L | L1 | Accepted-AOC Deed Complete |
| 2 | L2₹6.9 LSame as L1Rejected-Finance | ₹6.9 LSame as L1 | L2 | Rejected-Finance Rejected in Lottery |
| 3 | L2₹6.9 LSame as L1Rejected-Finance 12 30 126 A CHAMANLAL KI KUAN | ₹6.9 LSame as L1 | L2 | Rejected-Finance Rejected in Lottery |
| 4 | L2₹6.9 LSame as L1Rejected-Finance | ₹6.9 LSame as L1 | L2 | Rejected-Finance Rejected in Lottery |
| 5 | L2₹6.9 LSame as L1Rejected-Finance | ₹6.9 LSame as L1 | L2 | Rejected-Finance Rejected in Lottery |
Tender Value
₹8.2 L
EMD Value
₹81,547
Closing Date
28 Mar 2026, 3:00 pmClosed
Chief Engineer, KNN
Chief Engineer Office, KNN, Motijheel
Cleaning of open drain from Khedia School to Yoga Ashram Karbala Old Kanpur under Ward-13 Zone-04.
2026_NNKAN_1126430_1
779/AA-4/25-26
Open Tender
Civil Works
Percentage
45 days
ward-13
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹81,547
5 May 2026
20 Mar 2026
28 Mar 2026
20 Mar 2026
28 Mar 2026
20 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Desilting of covered nala in liquid or mud in foul position Including lift up to 1.5m etc all complete | |||||
| 2Dismantling of cement concrete or brick or granolithic floors including base concrete and including stacking of materials as directed by engg. i/c. within a distance of 60mtr. | |||||
| 3Providing and laying in position cement cocrete of specified grade excluding the cost of centering and shuttering - All work up to the plinth level in 1:4: (1 cement : 4 coarse sand (zone-iii) : 8 graded stone aggregate 200 mm nominal size | |||||
| 4Providing & laying in position specified grade of reinforced cement cocrete, excluding the cost of centering, shuttering, finishing and reinforcement- All work up to plinth level: 1:1.5:3(1 cement: 1.5 coarse sand: 3 graded stone aggregate 20mm. | |||||
| 5Steel reinforcement for R.C.C. work including straightening. cutting, bending, placing in position and binding all completeupto plinth level. Thermo | |||||
| 6Cartage of materials by head load up to 90.0mtr distance including loading/unloading with all charges complete. | |||||
| 7Disposal of surplus earth/malwa upto 10.00km distance including loading/unloading of material with all charge complete. | |||||
| 8Add 18 % G.S.T. | |||||
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_2100572.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
BOQ_2100572.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .