Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.6 LAccepted-AOC | L1 | Accepted-AOC Lowest 1 | |
| 2 | L2₹16.7 L+₹10,475.65 (0.63%)Rejected-AOC | L2 | Rejected-AOC Lowest 2 |
Tender Value
Refer Docs
EMD Value
₹2.1 L
Closing Date
4 Feb 2021, 11:00 amClosed
Executive Engineer
Executive Engineer,Matatila dam Division, Jhansi
Restoration of stair ,M.S. railing of parapet wall of Marginal bundh D/S of Matatila Dam.
2021_UPIDC_548730_1
02/EE/Matatila/2020-21
Open Tender
Civil Works
Item Rate
25 days
Matatila, Talbehat
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹2.1 L
19 Feb 2021
28 Jan 2021
4 Feb 2021
28 Jan 2021
4 Feb 2021
28 Jan 2021
Amount
Dismentaling of old and damaged RR Stone Mensory at D/s of marginal bund including cost of all material, labour and T&P.disposal upto 1 km, all lead and lift as per directed by Engineer -in -charge.
Ist class brick masonary in 1:6 cement Mortar including cost of all lead & lift, Labour, Material, T&P etc complete as per directed by Engineer -in -charge
R.R. stone masonary in 1:4 cement Mortar including cost of all lead & lift, Labour, Material, T&P etc complete as per directed by engineer -in-charge
12.50 mm thick cement plaster in 1:5 cement mortar including cost of all materials, labour and T&P,as per directed by engineer -in-charge
S/F steel MS window Penal with steel gril made of window fream Angle size (35x35x5)mm, 10mm sq bar, Flat Patti Size (40x5)mm, for gril including all cost of material, labour T&P, lead and lift fabrication charge,red oxide and enamel painting etc. complete. as per directed by Engineer -in -charge
S/F steel MS gate with steel gril made of fraim M.S. Angle size (50x50x5)mm, 10mm sq bar, Flat Iron sheet 2mm thick, for gate grill i/c all cost of material, labour T&P, fabrication charge red oxide and enamel painting etc. complete. as per directed by Engineer -in –charge
P/L centering & shuttering for PCC gate piller including cost of all lead & lift, Labour, Material, T&P etc complete as per directed by Engineer -in -charge
Supplying and laying 1:8:16 Plain cement concrete including all cost of materials, labour and T&P,lead and lift as per directed by Engineer -in -charge
Supplying and laying 1:2:4 Plain cement concrete including all cost of material, labour and T&P,lead and lift as per directed by Engineer -in -charge
Supplying and laying 1:2:4 R.C.C. Piller for marginal bundh gate as per directed by Engineer -in -charge
Snowcem Painting 2 Coats on Old Surface (water proof cement paint.) including cost of all materials, labour and T&P etc as per directed by Engineer -in -charge
Supplying and fixing 25mm thick size Dhoulpuri red flag stone ( well dressed) including cost of all materials, labour and T&P etc as per directed by Engineer -in -charge
reaised pointing with 1:2 cement sand mortar including cost of all materials, labour and T&P etc as per directed by Engineer -in -charge
P/L reinforcement for marginal bundh gate including Cutting, bending, binding & placing steel cost of all materials, labour and T&P etc as per directed by Engineer -in -charge
Providing and laying of 80 mm interlocking concrete block pavement laid in stone dust base and fill joint with fine sand joint filled after levelling and dressing base including supply of All maqterial,labour ,T&P etc required for proper completion of work as per directed by Engineer -in -charge
Earth work in Mar,Rankar and kankar mixed soils in digging or in embankment including lead up to 30.00 M and lift up to 1.50M including dressing making profile and manual compaction but excluding mechanical compaction
M/S PRADEEP KUMAR SHUKLA
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .