| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.4 CrRejected-AOC 101 KRISHNA VIHAR RAILWAY COLONY QUARSI RAMGHAT ROAD ALIGARH | ₹1.4 Cr | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical DISQUALIFIED |
| 4 | Rejected-Technical | - | - | Rejected-Technical DISQUALIFIED |
| Sl No | Description | Qty | Unit | M/S SURENDRA KUMAR KAUSHIK L1 | M/S S K BUILDERS L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling R.B or R.C.C work i/c stacking of material with in 60 mtrs.distance. | 81.95 | Cum | 469 ₹38,434.55 | 200 ₹16,390 |
| 2.00 | Dismantling of Bricks or stone masonry in lime or cement i/c stacking of material with in 60 mtrs. Distance. | 54.28 | Cum | 384 ₹20,843.52 | 150 ₹8,142 |
| 3.00 | Earth work in excavation of foundation in all type of soil with back filling i/c all lead and lift with all cost of material,labour and T&P. | 1,478.73 | Cum | 75 ₹1.1 L | 100 ₹1.5 L |
| 4.00 | Providing and laying C.C 1:2:4 (M-15) with coarse sand & stone Aggregate of size 10 to 20mm i/c all cost of material,labour & T&P. | 281.02 | Cum | 3,952 ₹11.1 L | 5,200 ₹14.6 L |
| 5.00 | Providing and laying C.C 1:1.5:3 (M-20) with coarse sand & stone Aggregate of size 10 to 20mm i/c all cost of material,labour & T&P. | 183.1 | Cum | 4,850 ₹8.9 L | 6,200 ₹11.4 L |
| 6.00 | Providing and laying R.C.C 1:1:2 (M-25) with coarse sand & stone aggregate of size 10 to 20 mm including all cost of material,labour and T&P. But excluding cost of steel reinforcement. | 426.46 | Cum | 5,380 ₹22.9 L | 7,200 ₹30.7 L |
| 7.00 | Providing and laying C.C. 1:1:2 with coarse sand & stone aggregate 10–20 mm i/c all cost of material, labour and T&P. | 20.01 | Cum | 4,900 ₹98,049 | 7,200 ₹1.4 L |
| 8.00 | Centering and shuttering for R.C.C. work including all costs of material and T&P. | 1,303.68 | Sqm | 850 ₹11.1 L | 800 ₹10.4 L |
| 9.00 | Steel reinforcement including cutting, bending, binding and placing of reinforcement including cost of binding wire with all cost of material, labour and T&P. | 55.87 | MT | 56,000 ₹31.3 L | 92,000 ₹51.4 L |
| 10.00 | Supplying and laying one layer of tar felt ISI marked at the junction of wall and roof or any place i/c necessary overlap giving a cost of approved mastic paint below the tar felt i/c cost of all material, labour and T&P. | 10.2 | Sqm | 185 ₹1,887 | 2,000 ₹20,400 |
Tender Value
₹1.6 Cr
EMD Value
₹3.1 L
Closing Date
12 Mar 2026, 1:00 pmClosed
SE IWC SAHARANPUR
OFFICE OF THE SE IWC SAHARANPUR
Construction work of VRV at km 136.488 of Eastern Yamuna Canal
2026_UPIDC_1121289_2
05/SE/SRE/2025-26
Open Tender
Civil Works
365 days
SHAMLI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹3.1 L
OFFICE OF THE SE IWC DEHRADUN ROAD SAHARANPUR
27 Mar 2026
5 Mar 2026
12 Mar 2026
5 Mar 2026
12 Mar 2026
5 Mar 2026
10 Mar 2026
Dismantling R.B or R.C.C work i/c stacking of material with in 60 mtrs.distance.
Dismantling of Bricks or stone masonry in lime or cement i/c stacking of material with in 60 mtrs. Distance.
Earth work in excavation of foundation in all type of soil with back filling i/c all lead and lift with all cost of material,labour and T&P.
Providing and laying C.C 1:2:4 (M-15) with coarse sand & stone Aggregate of size 10 to 20mm i/c all cost of material,labour & T&P.
Providing and laying C.C 1:1.5:3 (M-20) with coarse sand & stone Aggregate of size 10 to 20mm i/c all cost of material,labour & T&P.
Providing and laying R.C.C 1:1:2 (M-25) with coarse sand & stone aggregate of size 10 to 20 mm including all cost of material,labour and T&P. But excluding cost of steel reinforcement.
Providing and laying C.C. 1:1:2 with coarse sand & stone aggregate 10–20 mm i/c all cost of material, labour and T&P.
Centering and shuttering for R.C.C. work including all costs of material and T&P.
Steel reinforcement including cutting, bending, binding and placing of reinforcement including cost of binding wire with all cost of material, labour and T&P.
Supplying and laying one layer of tar felt ISI marked at the junction of wall and roof or any place i/c necessary overlap giving a cost of approved mastic paint below the tar felt i/c cost of all material, labour and T&P.
providing weepholes in brick masonary/stone masonary plain/ reinforced concrete abutment, wing wall, return wall with 75 mm dia pvc pipe make of kisan and equivalent extending through the full width of the structures with slope of 1(v) : 20(H) towards drawing face complete as per drawing.
Providing and fixing of 75 mm dia PVC pipe Drainage spout make of kissan and equivalent complete as per drawing and Technical specification as per Moeth 2705 sr no 9.20
Random coarse rubble stone masonry with cement mortar 1:4 (1 cement : 4 sand) in foundation and plinth including labour and T&P etc. up to 60 M lead.
Supply and laying dry boulder pitching 300mm thickness with 20 to 40kg in weight i/c all cost of material,labour t&p etc.comp.
Grouting of boulder pitching in 1:2:4 i/c all cost of material,labour T&P etc.complete.
Earth work in filling for making bund and restoration of bank Lead up to 1.00 Km. & lift up to 1.5 M with ramming and dressing etc complete
Supplying and filling E.C bags with earth filled and placing with in 60 mtr distance for making Bundh including all cost of material, labour and T&P.
Readymade coloured water proof paint weather coat two coat on new surface/ old surface including one coat of primer i/c cost of materials,labour, tools & plants etc
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.95 MB
BOQ_2086354.xls
BOQ • 0.23 MB
Booklate-02.pdf
Tender Documents • 2.62 MB
Download all tender documents and submit your bid