Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 LQualified Item Categories: LEVELING AND EARTH EXCAVATION FOR FOUNDATION,CONSTRUCTION OF FOUNDATION WALL USING 06 INCH THICK CO NO 7 GROUND FLOOR GUNDAPPA GOWDA ROAD 4TH CROSS EJIPURA BANGALORE KARNATAKA 560047 UDYAM KR 03 0103142 29BJMPA1813K1Z7 R M | BENGALURU URBAN | KARNATAKA | 560047 | Item Categories: LEVELING AND EARTH EXCAVATION FOR FOUNDATION,CONSTRUCTION OF FOUNDATION WALL USING 06 INCH THICK CO | L1 | Qualified MSE, Category: General | |
| 2 | L2₹3.5 L+₹6,871.38 (2.00%)Qualified Item Categories: LEVELING AND EARTH EXCAVATION FOR FOUNDATION,CONSTRUCTION OF FOUNDATION WALL USING 06 INCH THICK CO | Item Categories: LEVELING AND EARTH EXCAVATION FOR FOUNDATION,CONSTRUCTION OF FOUNDATION WALL USING 06 INCH THICK CO | L2 | Qualified MSE, Category: General | |
| 3 | L3₹3.5 L+₹10,378.08 (3.02%)Qualified Item Categories: LEVELING AND EARTH EXCAVATION FOR FOUNDATION,CONSTRUCTION OF FOUNDATION WALL USING 06 INCH THICK CO 3 BAZAR STREET VANNERPET VIVEK NAGAR POST BANGALORE KARNATAKA 560047 UDYAM KR 03 0100679 29AAPPA4217J1ZM R M | BENGALURU URBAN | KARNATAKA | 560047 | Item Categories: LEVELING AND EARTH EXCAVATION FOR FOUNDATION,CONSTRUCTION OF FOUNDATION WALL USING 06 INCH THICK CO | L3 | Qualified MSE, Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
9 Jun 2025, 12:00 pmClosed
LEVELING AND EARTH EXCAVATION FOR FOUNDATION
CONSTRUCTION OF FOUNDATION WALL USING 06 INCH THICK CONCRETE BLOCK
REMOVING OF EXISTING INTERLOCKING TILES
LEVELING THE SURFACE AND RELAYING OF THE SAME TILES WITH M SAND CUSHION BED
LABOUR AND TRANSPORT CHARGES
7852587
GEM/2025/B/6242154
Single Packet Bid
LEVELING AND EARTH EXCAVATION FOR FOUNDATION,CONSTRUCTION OF FOUNDATION WALL USING 06 INCH THICK CO
15 days
Karnataka; Bengaluru Urban
Total value wise evaluation
BOQ
7 documents required · 7 mandatory
3 yrs
₹31
10%
Exempted
9 Jun 2025
17 May 2025
9 Jun 2025
| Item No | Item Title | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|
| 1 | LEVELING AND EARTH EXCAVATION FOR FOUNDATION | 1 | Ls | Bangalore | 15 |
| 2 | CONSTRUCTION OF FOUNDATION WALL USING 06 INCH THICK CONCRETE BLOCK | 680 | Sqft | Bangalore | 15 |
| 3 | REMOVING OF EXISTING INTERLOCKING TILES | 3,200 | Sqft | Bangalore | 15 |
| 4 | LEVELING THE SURFACE AND RELAYING OF THE SAME TILES WITH M SAND CUSHION BED | 3,200 | Sqft | Bangalore | 15 |
| 5 | LABOUR AND TRANSPORT CHARGES | 1 | Job | Bangalore | 15 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_7852587.pdf
GEM_BID
outdoor_hall_2025-05-16-20-18-47_689f51d7cc1c7c75a93660679ce89e95.pdf
BOQ
boq_item_sample_file-1_2025-05-16-20-18-47_6c6fa19661670891234f4d3a87b3998f.csv
BOQ
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .