Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.8 LAccepted-AOC OPPOSITE VIPUL GAS AGENCY HOSPITAL ROAD SOLAN H P | SOLAN | SOLAN | HIMACHAL PRADESH | ₹22.8 L Quoted ₹23.9 L | L1 | Accepted-AOC Award of contract |
| 2 | L2₹24.2 LRejected-Finance R O 127 3 LOWER BAZAR SHIMLA 1 | ₹24.2 L | L2 | Rejected-Finance Rejected |
| 3 | L3₹24.2 LRejected-Finance | ₹24.2 L | L3 | Rejected-Finance Rejected |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Thakur Traders L3 | ROYAL ENGINEERING WORKS L1 | Electro Mechanical Engineering Company L2 |
|---|---|---|---|---|---|---|
| 1.00 | Complete set of rewinding of stator of squirrel cage BHEL make 11KV 1050KW/ 1400HP, 3 phase induction motor having Sr. No. 44148A401-11-05 including cost of re-winding, with new winding material, insulation material and allied materials repair of rotor shaft complete and precision longitude as well as axial tightening of motor with pump shaft with suitable precision measuring device like dial gauge of digital alignment meter using stainless steel shims etc. and allied jobs/ material including entire carriage of materials upto all leads and lifts complete in all respect as per direction of Engineer-in-Charge. | 1 | P/Job | 16,75,000 ₹16.8 L | 16,50,000 ₹16.5 L | 16,68,900 ₹16.7 L |
| 2.00 | Re-babbiting of DE and NDE side bearing to actual shaft size with permissible tolerance and clearances as per manufacturing manual including carriage of materials with in all leads & lifts complete in all respect as per direction of Engineer-in-Charge. | 1 | P/Job | 2,30,000 ₹2.3 L | 2,22,000 ₹2.2 L | 2,20,000 ₹2.2 L |
| 3.00 | Re-installation of motor on bed and precision longitudinal as well as axial alignment of motor with pump shaft with suitable precision measuring devices like dial gauges, SS Shims etc. including manual and machenized loading/ unloading including carriage of materials with in all leads & lifts complete in all respect as per direction of Engineer-in-Charge. | 1 | P/Job | 37,000 ₹37,000 | 36,500 ₹36,500 | 40,000 ₹40,000 |
| 4.00 | Transportation charges of motor from site to workshop and back including carriage of materials with in all leads and lifts complete in all respect i.e. re-assembling and testing in full load and as per direction of Engineer-in-Charge. | 1 | P/Job | 51,000 ₹51,000 | 50,000 ₹50,000 | 51,800 ₹51,800 |
| 5.00 | Providing and fixing meter connection load fiber glass 120mm2 including thimbles, gas welding, base plate for connection including carriage of materials with in all leads & lifts complete in all respect as per direction of Engineer-in-Charge. | 1 | P/Job | 34,000 ₹34,000 | 35,000 ₹35,000 | 38,000 ₹38,000 |
| 6.00 | Providing and fixing new bearing bush with white metal material bearing of actual size shaft with permissible tolerence and clearance complete in all respect. | 2 | Nos. | 1,98,000 ₹4.0 L | 1,96,500 ₹3.9 L | 1,98,200 ₹4.0 L |
Tender Value
₹22.8 L
EMD Value
₹41,760
Closing Date
9 Sept 2024, 11:00 amClosed
Executive Engineer
Jal Shakti Division Solan
CRF of DWSS Solan Town from Giri River SH _ Rewinding of motor 11KV 1050 KW 1400 HP Sr. No. 44148A401-11-05 at pump house
2024_HPIPH_92405_1
JSV-DS-CB-TA-NIT/2024- 5570-5669 dated 30.08.24
Open Tender
Civil Works - Others
30 days
Goura Distt. Solan H.P.
Please refer to the tender documents
2 documents required · 2 mandatory
₹400
₹41,760
Yes
3 Feb 2026
30 Aug 2024
9 Sept 2024
30 Aug 2024
9 Sept 2024
30 Aug 2024
30 Aug 2024 - 9 Sept 2024
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid