| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.1 LAccepted-AOC | L1 | Accepted-AOC STANDS LOWEST | |
| 2 | L2₹12.1 L+₹1,140.20 (0.09%)Rejected-AOC | L2 | Rejected-AOC HIGHER THAN L1 | |
| 3 | L3₹12.1 L+₹1,259.20 (0.10%)Rejected-Finance | L3 | Rejected-Finance HIGHER THAN L1 AND L2 | |
| 4 | L4₹12.5 L+₹38,167.20 (3.15%)Rejected-Finance RANGBULL DARJEELING 734123 | DARJEELING | DARJEELING | WEST BENGAL | 734123 | L4 | Rejected-Finance HIGHER THAN L1 AND L2 |
Tender Value
₹12.5 L
EMD Value
₹24,947
Closing Date
6 Jul 2020, 2:00 pmClosed
Executive Engineer, NMD, PHE DTE.
Office of the Executive Engineer, Northern Mechanical Division Public Health Engineering Directorate Sukanta Sarani, Paresh Nagar, Savoke Road, Siliguri - 734001, District- Jalpaiguri
Day to day comprehensive maintenance of pipe line from Intake to St. Pauls AND Rockvill reservoir via Intermediate, Sinchal Lake, Sindhap WTP under Darjeeling WS Pumping Scheme.
2020_PHED_285484_1
WBPHED/EE/NMD/NIeT- 01 OF 2020-2021
Open Tender
Miscellaneous Works
Item Rate
184 days
SINDHAP
Please refer Tender documents.
5 documents required · 5 mandatory
₹24,947
Yes
21 Jul 2020
16 Jun 2020
8 Jul 2020
18 Jun 2020
6 Jul 2020
18 Jun 2020
Amount
Comprehensive maintenance of the entire rising main alongwith operation of different valves placed at different geographical altitude for attaining highest level of supervision and control of the whole networking system defined as below. Period : 01/08/2020 to 31/01/2021 = 184 Days Intake to intermediate 300 mm pipeline (double pipe)- 7.4 km approx. Intermediate to Sinchal lake 300 mm pipe line (double pipe).-2.9 km approx. Sinchal lake to Sindhap WTP 250 mm pipe line (double pipe).-278 mt approx. Sindhap WTP to St. Paul's tank 200 mm 250 mm & 400 mm pipe line-6.7 km approx Sindhap WTP to Rockvill tank 200 mm, 250 mm & 400 mm pipe line. Wash out pipe line for St. Paul's tank 150 mm G.I.-108 mt approx. Wash out pipe lune from Rock vill tank to Thamijhora 200 mm M.S.- 443 mt approx.
Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specifications clause 201 for Rural Roads of MORD. (PWD Schedule Road & Bridge Works : Volume III, Page no. 230) By Manual Means
In area of non-thorny jungle.
In area of thorny jungle.
Deployment of one inspection vehicle on daily basis including fuel and driver (Preferable four wheel drive) for supervision of pipeline from Intake to St. Paul's & Rockvill reservoir. (Elevation from 806 mtr. to 2236 mtr.) Period : 01/08/2020 to 31/01/2021 Rates to be quoted for all item should be inclusive of all taxes and charges including GST.
NORDEN DUKPA
DAWA DUKPA
BHAGWATI CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .