Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹98.6 L
Closing Date
5 Nov 2021, 2:00 pmClosed
GM, INRPK
GM, INRPK, Kalpakkam - 603102
Design, Fabrication, Factory Testing, Supply, Installation and Commissioning of Electrical Bus Ducts for Ceramic Melter at WIP, Kalpakkam
2021_BARC_651158_1
BARCF/INRPK-MA/WU/TR/77/2021
Open Tender
Electrical Works
Item Rate
365 days
Kalpakkam
As per attached document
2 documents required · 2 mandatory
₹0
Exempted
18 Nov 2021
7 Oct 2021
8 Nov 2021
7 Oct 2021
5 Nov 2021
7 Oct 2021
7 Oct 2021 - 1 Nov 2021
Amount
Design, Fabrication, Assembling, Factory testing and Dis-assembling, Transportation to site and installation at site of single phase copper conductor busducts of Powder coated MS sheet enclosure (outside melter cell Part A, B, C and D in the relevant drawing) with inspection chambers, respective supporting structures, end terminations and earthing for Electrode power supply of Ceramic melter as per tender specifications.
Design, Fabrication, Assembling, Factory testing and Dis-assembling, Transportation to site and installation at site of single phase copper conductor busducts of Stainless steel 304L enclosure (inside melter cell Part E and F in the relevant drawing) with inspection chambers, respective supporting structures, end terminations and earthing for Electrode power supply of Ceramic melter as per tender specifications.
Design, Fabrication, Assembling, Factory testing and Dis-assembling, Transportation to site and installation at site of single phase copper conductor busducts of Stainless steel 304L enclosure (inside melter cell Part G and H in the relevant drawing) with inspection chambers, respective supporting structures, end terminations and earthing for Electrode power supply of Ceramic melter as per tender specifications.
Supply and installation of End Terminations of Busbars using 60 mmx10 mm Tinned Copper Flexible braid (500 mm length each)
Supply and installation of End Terminations of Busbars using 40mmx10 mm Tinned Copper Flexible braid (500 mm length each)
Supply and installation of End Terminations of Busbars using 30mmx10 mm Tinned Copper Flexible braid (500 mm length each)
Design, Fabrication, Assembling, Factory testing and Dis-assembling, Transportation to site and installation at site of single phase circular copper conductor busducts with Stainless steel 304L enclosure & Stainless steel supporting structure (Part A, B and C in the relevant drawing) for Plenum heater power supply of Ceramic melter as per tender specifications.
Design, Fabrication, Assembling, Factory testing and Dis-assembling, Transportation to site and installation at site of single phase circular copper conductor busducts with SS 304 L cover (Part 1 to 8 in the relevant drawing) for Plenum heater power supply of Ceramic melter as per tender specifications.
Supply and installation of Powder coated MS Junction box for Plenum heater power supply
Design, Fabrication, Assembling, Factory testing and Dis-assembling, Transportation to site and installation at site of copper tube bus duct with Syndanio sheet enclosure for induction coils of Ceramic melter as per tender specifications.
Supply, Installation and termination of 2Cx16 sqmm, Copper conductor, XLPE insulated, FRLS PVC sheathed, armoured Cable.
THARIQUE ELECTRICAL CONTRACTOR
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .