Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-AOC | L1 | Accepted-AOC ACCEPT | |
| 2 | L2₹2.1 L+₹686.19 (0.33%)Rejected-AOC | L2 | Rejected-AOC ACCEPT |
Tender Value
Refer Docs
EMD Value
₹2,100
Closing Date
4 Mar 2024, 3:00 pmClosed
The Block Development Officer
The Block Development Office,K.V.Kuppam
Vellore District Construction of New Kitchen Shed Building at PUE School in Latheri Panchayat for K.V.Kuppam Block General Fund 2023-24 Package No 04
2024_RDTN_430125_1
A3/1155/2023
Open Tender
Civil Works
Item Rate
180 days
The Block Development Office, K.V.Kuppam
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹2,100
10 Apr 2024
24 Feb 2024
4 Mar 2024
24 Feb 2024
4 Mar 2024
24 Feb 2024
Amount
Vellore District Construction of New Kitchen Shed Building at PUE School in Latheri Panchayat for K.V.Kuppam Block General Fund 2023-24 Package No 04
Dismantling for Brick work
Providing Blue colour sheet in Top of roof in School Building etc.complete.
Supply and fixing of GI angle including cost and conveyance of all etc.. Complete(Rate added for SOR 2022-23
Supply and fixing of GI "J" or "L" Bolts with Nuts 6mm dia including cost and conveyance of all etc.. Complete
Supply and fixing of Bitumen Washers 15mm dia including cost and conveyance of all etc.. Complete
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete in 1:4:8 mix using 40mm ISS HBG metal including all Cost and conveyance of labour charges etc.,Complete.,
Supplying and filling of conveyed earth with a lead of 1Km for basement filling including all Cost and conveyance of labour charges etc.,Complete.,
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Solid Block in cement mortar 1:5 mix using solid blocks 40x15x20cm and conveyance of all materials to site and all labour charges etc complete
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
Plastering with Cement Mortar 1:4 (One Cement and Three M.Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used
Plastering with Cement Mortar 1:5 (One cement and Five M.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Electrical arrangement
Cuddaba slab
Steel door
Steel window
Ventilater
Provision for Name Board
GST Amount for providing service to Government contract works for the above construction works. { GST amount is the Total GST amount for total overall quoted amount above this row in column "BB" for all works in this package}
A.THIYAGARAJAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_511291.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .