Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹15.9 LAccepted-AOC CAMP DHANPURI NO 01 DHANPURI DIST SHADOL MP | DHANPURI | SHADOL | MADHYA PRADESH | 484114 | L-1 | Accepted-AOC Accepted as L-1 | |
| 2 | Rejected-Technical AMLAI COLLIERY ANUPPUR MADHYA PRADESH 484114 | AMLAI | ANUPPUR | MADHYA PRADESH | 484114 | - | Rejected-Technical Rejected as L-3 | |
| 3 | Rejected-Technical GRAM POST KARKATI VIA BURHAR KARKATI SHAHDOL MADHYA PRADESH 484110 | SHAHDOL | MADHYA PRADESH | 484110 | - | Rejected-Technical Rejected as L-2 |
Tender Value
₹22.5 L
EMD Value
₹28,200
Closing Date
29 Nov 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Staf Officer Mining
Staff Officer (Mining) SECL Sohagpur Area, PO- Dhanpuri, Distt- Shahdol (MP),Mobile No.- 9425533459
Construction of 02 nos Air crossing in seam VII and reconstruction of 04 nos of Air Crossing in seam VIB of Khairaha UG Mine
2024_SECL_321095_1
SECL/SGP/SO(M)/e-T/35/24-2 5/669 Dt13.11.2024
Open Tender
Civil Works - Others
Item Rate
365 days
khairaha UG Mine
As per NIT
8 documents required · 8 mandatory
₹28,200
8 Jan 2025
14 Nov 2024
2 Dec 2024
14 Nov 2024
29 Nov 2024
15 Nov 2024
14 Nov 2024 - 21 Nov 2024
Amount
Item Description/ Heading Part (A) labour Cost
Roof heightening- ( Drilling, blasting, dressing, mucking etc.) (a) ( Drilling, blasting, dressing, mucking etc.) Including mucking - i) 4(6.20 X 4.50 X 1.20) = 133.92 m³ ii) 2(6.75 X 5.00 X 1.80) = 121.50 m³ Total = 255.42 m3
(b) ( Drilling, blasting, dressing, etc.) Excluding mucking - i) 4[(2.75 X 4.50 X (1.20+0 /2)] = 29.70 m³ ( Rate for excluding mucking = Item No. 2(h) =2106.42 Item No. 1(d) = 528.47 2(h)-1(d)= 1577.95
Groove cutting in soft stone In roof –i) 4{2X(4.80m.x0.15m.X0.10 m.)}=0.58 m3 ii) 2{2X(5.30m.x0.15m.X0.10 m.)}=0.32 m3 In side – i) 4{4X(1.20m.x0.15m.X0.10 m.))=0.29 m3 ii) 2{4X(1.80m.x0.15m.X0.10 m.)}=0.22 m3 Total = 1.41
Groove cutting in coal/shale - In floor – 2{2X( 5.60m.x0.30m.X0.30 m.)}=2.02 m3 In side –i)2{4X (2.50m.x0.30m.X0.30 m.)}=1.80 m3 ii) 2{4X(0.50m.x0.15m.X0.10 m.)}=0.06 m3 Total = 3.88 m3
Reinforced cement concrete (1:2:4) in wall/roof ceiling of air crossing/stopping (any thickness) in u/g (Excluding centring, shuttering, reinforcement cutting, bending, placing in position and binding etc all complete as well as cost of RCC materials) Lower wall- 2{2X6.35m.X2.80m.X0.30m.} = 21.34 m3 Upper wall – i)4{2X5.10m.X2.50m.X0.15m.} = 15.30 m3 ii)2{2X5.90m.X2.50m.X0.15m.} = 8.85 m3 Roof slab of Air crossing- i)4{5.80m. X 4.50m. X 0.10m.}= 10.44 m3 ii)2{6.35m. X 5.00m. X 0.10m.}= 6.35 m3 Total = 62.28 m3
Centring, shuttering, finishing and reinforcement including cutting, bending, placing in position and binding and strutting, propping etc compleCentring, shuttering, finishing and reinforcement including cutting, bending, placing in position and binding and strutting, propping etc complete Lower wall- 2{2X5.75m.X2.50m.} = 57.50 m2 Upper wall – i) 4{2X4.80m.X2.20m.} = 84.48 m2 ii)2{2X5.60m.X2.20m.} = 49.28 m2 Roof slab of Air crossing- i)4{5.50m. X 4.50m. } = 99.00 m2 ii)2{6.05m. X 5.00m. } = 60.50 m2 Total = 350.76 m2
6 mm thick cement plaster along with making of Board (1:6) Lower wall- 2{2 X (5.75m. X 2.50m. )}= 57.50 m2 Upper wall i)4{2 X (4.50m. X 2.20m. ))= 79.20 m2 ii)2{2 X (5.30m. X 2.20m. ))= 46.64 m2 TOTAL = 183.34 m2
Loading of all kind building materials in to tub at Inc. mouth- a) Cement
b) Sand + stone chips (29.12+55.43 m³)
d) Steel rod(12 mm)
Transportation of all kind of building material from surface to ug through haulages with tramming and coupling/uncoupling etc for a distance every 1.0 km there of and bringing the empty tubs to surface a) Cement
b) Sand + stone chips (29.12+55.43 m³)
d) Steel rod(12 mm)
Unloading of all kind building materials in to tub at distination a) Cement
b) Sand + stone chips (29.12+55.43 m³)
d) Steel rod(12 mm)
Lead for transportation/carriage of all kinds building materials by manually in u/g. (46 to 60 mtr.)
Roof support including drilling of holes (stone) by providing of drill bit. drill rod, & jet pump by the contractor and installation of roof bolts (1.50m to 1.80m) with bearing plate & w-strap (where required) , Anchorage testing and carrying of support materials. Total length – 65.00/0.80=81.25X 5 nos. = 405 nos. Additional bolts required in 06 Junctions = 12 rows x 5 nos. = 60 No. Total = 465 nos
Part-B Material Cost supply and stacking of building materials Cement
Stone chips
Steel rod(12mm)
Total impact of GST for the purpose of CTC
VIKASH KUMAR VISHWAKARMA (BID ID -1103742)
UDAY RAJ SINGH (BID ID -1104293)
techsummary_332839.pdf
PDF • 0.21 MB
finsummary_332839.pdf
PDF • 0.23 MB
LOI669.pdf
PDF • 1.09 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .