Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Pectherm Pvt Ltd L1 |
|---|---|---|---|---|
| 1.00 | Supply & installation of Auto Drain Valves – Electronic/Pneumatic type with adjustable discharge timing (0.5 – 10 sec), working pressure 0.2 – 16 bar, voltage 230V AC/24V DC, flow capacity up to 1000 LPM, corrosion-resistant brass/stainless steel body | 5 | No. | 10,000 ₹50,000 Lowest |
| 2.00 | Replacement Coalescing Filter – Technical Specifications
1. Filtration Efficiency: 0.01 microns (removes oil, water, and solid particulates)
2. Material: Borosilicate or fiberglass media with stainless steel mesh support
3. Operating Pressure: 4 – 16 bar (58 – 232 psi), depending on the system requirement
4. Flow Rate Capacity: 1000 – 5000 LPM (varies based on plant size)
5. Initial Pressure Drop: ≤ 0.1 bar
6. Maximum Oil Carryover: ≤ 0.01 mg/m³
7. Temperature Range: -20°C to 80°C
8. Service Life: 6 – 12 months (depending on air quality and load)
9. Connection Type: BSP/NPT threaded or flanged, depending on system compatibility | 1 | Job | 45,000 ₹45,000 Lowest |
| 3.00 | Supply & installation of Control Panel (Including Timer & Sensors) – Microprocessor-based with digital temperature and pressure sensors (±0.5% accuracy), relay-based automation, HMI/LED interface, overload protection, auto drain control integration, input voltage 220V AC | 1 | Job | 10,000 ₹10,000 Lowest |
| 4.00 | Particulate Filter
Technical Specifications
1. Filtration Efficiency: 1 micron (removes fine dust and solid particulates)
2. Material: Pleated synthetic fiber or borosilicate media with stainless steel mesh support
3. Operating Pressure: 4 – 16 bar (58 – 232 psi)
4. Flow Rate Capacity: 750LPM
5. Initial Pressure Drop: ≤ 0.1 bar
6. Maximum Particle Carryover: ≤ 0.1 mg/m³
7. Temperature Range: -20°C to 80°C
8. Service Life: 6 – 12 months (depends on air quality and usage)
9. Connection Type: BSP/NPT threaded or flanged | 1 | Job | 45,000 ₹45,000 Lowest |
| 5.00 | Servicing of Air Dryer Unit (Cleaning, Leak Testing, and Calibration) – Includes cleaning of desiccant bed, leak detection test (helium/nitrogen-based), pressure regulator calibration (±2% accuracy), and replacement of faulty seals and gaskets | 1 | job | 45,000 ₹45,000 Lowest |
| 6.00 | Testing & Commissioning of the System – Functional testing of auto drains, filter efficiency verification, dew point monitoring (-40°C to -60°C), pressure drop analysis, and real-time performance logging | 1 | Job | 30,000 ₹30,000 Lowest |
| 7.00 | Transportation & Handling Charges – Covers logistics, handling, and transportation of filters, valves, control panels, and associated equipment to the installation site | 1 | Job | 5,000 ₹5,000 Lowest |
| 8.00 | Labor Charges for Installation & Testing – Skilled technician charges for removal of defective components, precise installation of new equipment, integration with PSA oxygen plant, and trial run validation | 1 | Job | 9,900 ₹9,900 Lowest |
| 9.00 | PSA Oxygen Sensor
Ntron Senz-Tx Oxygen Sensor Transmitter SELECTED OPTIONS: Sensor Type: Zirconia Range: 0 to 96% Connection: Flow-through housing Cable: No cable supplied | 1 | Job | 3,15,000 ₹3,15,000 Lowest |
Tender Value
₹5.5 L
EMD Value
₹11,100
Closing Date
19 Aug 2025, 12:00 pmClosed
EXECUTIVE ENGINEER M AND H DIVISIO DODA
KHELLANI DODA
Periodic Maintenance schedule for Plant 1 750 LPM Oxygen Generation Plant at Associated Hospital GMC Doda
2025_PWDJK_281144_2
MHDD/TS/2025-26/34
Open Tender
Repair and Maintenance Works
Turn-key
20 days
GMC DODA
AS PER SBD
2 documents required · 2 mandatory
₹500
EXECUTIVE ENGINEER M AND H DIVISIO DODA
₹11,100
8 Sept 2025
28 Jul 2025
19 Aug 2025
28 Jul 2025
19 Aug 2025
28 Jul 2025
Amount
Supply & installation of Auto Drain Valves – Electronic/Pneumatic type with adjustable discharge timing (0.5 – 10 sec), working pressure 0.2 – 16 bar, voltage 230V AC/24V DC, flow capacity up to 1000 LPM, corrosion-resistant brass/stainless steel body
Replacement Coalescing Filter – Technical Specifications 1. Filtration Efficiency: 0.01 microns (removes oil, water, and solid particulates) 2. Material: Borosilicate or fiberglass media with stainless steel mesh support 3. Operating Pressure: 4 – 16 bar (58 – 232 psi), depending on the system requirement 4. Flow Rate Capacity: 1000 – 5000 LPM (varies based on plant size) 5. Initial Pressure Drop: ≤ 0.1 bar 6. Maximum Oil Carryover: ≤ 0.01 mg/m³ 7. Temperature Range: -20°C to 80°C 8. Service Life: 6 – 12 months (depending on air quality and load) 9. Connection Type: BSP/NPT threaded or flanged, depending on system compatibility
Supply & installation of Control Panel (Including Timer & Sensors) – Microprocessor-based with digital temperature and pressure sensors (±0.5% accuracy), relay-based automation, HMI/LED interface, overload protection, auto drain control integration, input voltage 220V AC
Particulate Filter Technical Specifications 1. Filtration Efficiency: 1 micron (removes fine dust and solid particulates) 2. Material: Pleated synthetic fiber or borosilicate media with stainless steel mesh support 3. Operating Pressure: 4 – 16 bar (58 – 232 psi) 4. Flow Rate Capacity: 750LPM 5. Initial Pressure Drop: ≤ 0.1 bar 6. Maximum Particle Carryover: ≤ 0.1 mg/m³ 7. Temperature Range: -20°C to 80°C 8. Service Life: 6 – 12 months (depends on air quality and usage) 9. Connection Type: BSP/NPT threaded or flanged
Servicing of Air Dryer Unit (Cleaning, Leak Testing, and Calibration) – Includes cleaning of desiccant bed, leak detection test (helium/nitrogen-based), pressure regulator calibration (±2% accuracy), and replacement of faulty seals and gaskets
Testing & Commissioning of the System – Functional testing of auto drains, filter efficiency verification, dew point monitoring (-40°C to -60°C), pressure drop analysis, and real-time performance logging
Transportation & Handling Charges – Covers logistics, handling, and transportation of filters, valves, control panels, and associated equipment to the installation site
Labor Charges for Installation & Testing – Skilled technician charges for removal of defective components, precise installation of new equipment, integration with PSA oxygen plant, and trial run validation
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .