| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹4.9 L+₹8,849.27 (1.84%)Rejected-Finance | L2 | Rejected-Finance Rejected |
Tender Value
₹5.7 L
EMD Value
₹5,700
Closing Date
10 Jul 2025, 3:00 pmClosed
BDO (BP)
BDO Office, Sattur
Renovation of School Building in PU Primary School at Nenmeni Village and Panchayat
2025_RDTN_573502_1
A7/3427/2024
Open Tender
Civil Works
Works
Sattur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹5,700
Yes
11 Jul 2025
25 Jun 2025
10 Jul 2025
25 Jun 2025
10 Jul 2025
25 Jun 2025
Renovation School Building
Dismantling, clearing away and carefully stacking materials useful for re-use for any thickness of walls Chipping of concrete and roughening the surface
Cement Concrete 1:4:8 (One Cement, Four sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Paving the floor with best approved quality fine polished shahabad stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification
Pointing with cement mortar 1:3 to full depth of tiles using waterproofing compound 10% by weight of cement including cost and conveyance of all materials to site and all labour charges etc complete for 10 Sqm
Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers
Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
White washing two coats with freshly burnt white shell lime in all floors including cost of lime, blue powder fevicol type gum, brushes, scaffolding charges, etc., complete complying with standard specification and as directed.
Distempering the old wall and ceiling two coats with best oil bound distember of approved quality including preparation of surface, the rate includes cost of brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting the old iron works two coats with syntactic enamel paint of approved quality and colour including ordinary scraping using brushes and neat finishing etc., complete complying with standard specification and as directed by the Departmental Officer (the colour and quality should be got approved by the Executive Engineer before use)
Providing Blockboard in two layers with first layer in cement mortar 1:5 (one cement and five crushed stone sand)20mm thick and the second layer in Combination mortar 1:1:6(one cement one lime and six crushed stone sand) 20mm thick and providing band all round the block board in c.m 1:5 (one cement and five crushed stone sand) for 20mm thick and 50mm width including cost of one coat of block oxide paint of approved quality complying
Supplying and fixing in position best approved of BIS quality PVC rain water down fall pipes having a pressure of 4 kg. / sq.cm including cost of neceSORy PVC shoe, PVC bend, cast iron gratings of required diameter and special clamps, brass screws, nails, etc., and fixing of cast iron gratings at junction of parapet and the RCC roof slab including finishing neatly etc., complete. The rate shall be inclusive of cast of removable cast iron grating. The PVC pipe shall be fixed in wall with special type of “U” clamp at the centre of the pipe line in addition to those for more than 3.0 metre pipe length, etc., complete complying with standard specification and as directed by the departmental officers 110mm dia PVC Pipe for Two Floors
Manufacturing, supplying and fixing of Steel doors with the following specification M.S angles of a size 40x40x6mm are used for the outer frames and M.S. angles of size 35x35x5mm for the shutter frames stiffeners with 32x6mm M.S. flat is provided at required intervals in the shutter frames 18 gauge C.R. sheet is laid as panel in the shutter and welded intact for 1/3 bottom portion of the shutter. M.S. flat 18x5mm is welded over the 32x6mm M.S. flat sand witching the CR sheet in between. Additional stiffener with 18x5mm M.S. flat is provided diagonally at the rear side of the shutter. The balance 2/3 portion at top is provided with grill at an average weight of 20kg/sq.m and 6 Nos hinges for double leaves shutter to be provided 6nos of holdfasts 120mm in length made of angle section spliced at the ends are welded to the outer frame of the door. Tower bolts 2nos. one at top and the other at the bottom arte provided one aldrop is provided at on appropriate place in the door. A Tie bar is provided at the bottom of the outer frame to prevent twisting of frame during transportation or fixing. All members are given one coat of red oxide primer as directed by the departmental officers. The rate includes cost of all meterials, labour charges, taxes, transportation to site of work, loading, unloading and all other incidental charges etc., complete.
Providing Teachers Cubboard arrangements
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4"and conveyance of all materials to site and all labour charges etc complete for 100 cft (2.832 cum) - Above base
Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and fixing following thickness of cuddapah slab for cupboard 20-30mm thick
Distempering the old wall and ceiling two coats with best oil bound distember of approved quality including preparation of surface, the rate includes cost of brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.
Providing Cup-board Shutter using termite / water proof plywood of 19mm thick over which laminated sheet of 0.8mm thick fixed inside the shutter and 1mm thick fixed in the outside of the shutter using fevicol along with necessary furniture fittings, such as, hydralic hinges, tower bolt, handles, multi purpose locks etc., as directed by the Departmental Officers. The design pattern, water proof plywood, laminate sheet and other materials should be got approved from the Executive Engineer befoe use on work.
Providing Students Cubboard arrangements
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4"and conveyance of all materials to site and all labour charges etc complete for 100 cft (2.832 cum) - Above base
Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and fixing following thickness of cuddapah slab for cupboard 20-30mm thick
Distempering the old wall and ceiling two coats with best oil bound distember of approved quality including preparation of surface, the rate includes cost of brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.
Providing Cheppal Rack arrangements
Brick work in cement mortar 1:5 mix using country bricks 83/4"x41/4"x21/4"and conveyance of all materials to site and all labour charges etc complete for 100 cft (2.832 cum) - Above base
Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Supplying and fixing following thickness of cuddapah slab for cupboard 20-30mm thick
Distempering the old wall and ceiling two coats with best oil bound distember of approved quality including preparation of surface, the rate includes cost of brushes, high scaffolding arrangements, neat finishes, etc., complete complying with standard specification and as directed by the departmental officers.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .