Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 LAccepted-Finance 14 15 VINAY NAGAR VIJITEM PUBLIC SCHOOL QUARSI RAMGHAT ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹8.9 L | L1 | Accepted-Finance L1 |
| 2 | L2₹9.3 LRejected-Finance | ₹9.3 L | L2 | Rejected-Finance L2 |
| 3 | L3₹9.7 LRejected-Finance | ₹9.7 L | L3 | Rejected-Finance L3 |
| 4 | L4₹9.9 LRejected-Finance | ₹9.9 L | L4 | Rejected-Finance L4 |
| 5 | L5₹10.5 LRejected-Finance SHRI CHANDRAPAL SINGH VILLAGE BADRADURPUR POST KHEDA BUJURG DISTRICT ALIGARH | ALIGARH | UTTAR PRADESH | 202001 | ₹10.5 L | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | CHANDRA PAL SINGH L5 | A K B INFRA L3 | GOMATINETRA CONSTRUCTIONS L1 | M/S SHREE JEE CONSTRUCTIONS L4 | ARADHYA INFRA LTD L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T & P, leads and lift etc complet. | 50.52 | CUM | 63 ₹3,182.76 | 55 ₹2,778.60 | 50 ₹2,526 | 50 ₹2,526 | 50 ₹2,526 |
| 2.00 | Providing and Laying M-10 (C.C.1:3:6) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 22.99 | CUM | 4,888 ₹1.1 L | 4,500 ₹1.0 L | 3,600 ₹82,764 | 3,500 ₹80,465 | 4,200 ₹96,558 |
| 3.00 | Providing and Laying C.C. M-15(1:2.4) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 6.52 | CUM | 5,306 ₹34,595.12 | 4,800 ₹31,296 | 4,200 ₹27,384 | 4,100 ₹26,732 | 4,200 ₹27,384 |
| 4.00 | Providing and Laying first class M-150 brick work in (1:4 ) cement mortar including cost of all materials, labour T & P, all lifts and leads etc. complete. | 99.12 | CUM | 4,938 ₹4.9 L | 4,800 ₹4.8 L | 4,600 ₹4.6 L | 5,200 ₹5.2 L | 5,000 ₹5.0 L |
| 5.00 | Providing and Laying R.C.C. M-20(1:1.5:3) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 20.1 | CUM | 6,223 ₹1.3 L | 5,700 ₹1.1 L | 4,800 ₹96,480 | 6,500 ₹1.3 L | 4,500 ₹90,450 |
| 6.00 | Providing and Laying C.C. M-25(1:1:2) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | 2.55 | CUM | 6,718 ₹17,130.90 | 6,700 ₹17,085 | 5,200 ₹13,260 | 4,000 ₹10,200 | 4,200 ₹10,710 |
| 7.00 | Providing and fixing Cantering & shuttering including cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work . FOR CC WORK | 31.77 | SQM | 445 ₹14,137.65 | 300 ₹9,531 | 250 ₹7,942.50 | 300 ₹9,531 | 250 ₹7,942.50 |
| 8.00 | Providing and fixing Cantering & shuttering including cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work . FOR RCC WORK | 57.11 | SQM | 645 ₹36,835.95 | 400 ₹22,844 | 300 ₹17,133 | 500 ₹28,555 | 250 ₹14,277.50 |
| 9.00 | Supply and fixing of 20mm expansion joint in slab between dirt wall and slab including cost all labour, T&P material etc complete as per direction of Engineer - in charge. | 7.86 | SQM | 94 ₹738.84 | 45 ₹353.70 | 50 ₹393 | 99 ₹778.14 | 100 ₹786 |
| 10.00 | Providing and fixing steel reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in proper position, all lifts and leads ,all labour and T&P etc | 2.37 | MT | 58,445 ₹1.4 L | 58,300 ₹1.4 L | 66,500 ₹1.6 L | 62,000 ₹1.5 L | 70,000 ₹1.7 L |
Tender Value
₹11.1 L
EMD Value
₹25,000
Closing Date
17 Mar 2026, 5:00 pmClosed
EE M G C C Div 8 Bulandshahr
M G C C Div 8 Bulandshahr
Lot 3 Construction of VRB at Km. 23.630 of Kamalpur Dy.
2026_UPIDC_1123632_3
05/EE/2025-26
Open Tender
Civil Works - Canal
60 days
SAMBHAL
2 documents required · 2 mandatory
₹856
₹25,000
Yes
7 Apr 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
17 Mar 2026
12 Mar 2026
12 Mar 2026 - 17 Mar 2026
Earthwork in Excavation of foundation in ordinary soil including all lift & lead and including back filling, watering and ramming excavated earth into the trenches or into the space between the structure and the side of foundation trenches or into the plinth with removal and disposal of surplus earth as direction of engineer-in-charge from the foundation trenches including cost of labour, all T & P, leads and lift etc complet.
Providing and Laying M-10 (C.C.1:3:6) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete.
Providing and Laying C.C. M-15(1:2.4) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete.
Providing and Laying first class M-150 brick work in (1:4 ) cement mortar including cost of all materials, labour T & P, all lifts and leads etc. complete.
Providing and Laying R.C.C. M-20(1:1.5:3) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete.
Providing and Laying C.C. M-25(1:1:2) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete.
Providing and fixing Cantering & shuttering including cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work . FOR CC WORK
Providing and fixing Cantering & shuttering including cost of all material, labour, T&P, all lifts and leads, etc for proper completion of work . FOR RCC WORK
Supply and fixing of 20mm expansion joint in slab between dirt wall and slab including cost all labour, T&P material etc complete as per direction of Engineer - in charge.
Providing and fixing steel reinforcement including cost of steel, binding wire, bending, binding, welding, cutting, placing in proper position, all lifts and leads ,all labour and T&P etc
12 mm Thick Plaster in 1:4 Cement mortor including cost of all material, labour, T&P, Curing etc complete for proper completion of work
Providing and Laying local sand below floor including cost of all materials, labour T & P, all lifts and leads etc. complete.
Providing and painting Bitumen (85/40 grade ) in two coats including cost of all material, T&P, heating, labour all lifts and leads etc compete as per direction of Engineer-in-Charge
S/L of two coat tar Felt Painting including cost of all material, labour, T&P complete for proper completion of work
P/F 150mm Dia PVC Pipe in proper position for drainage spout i/c all material, labour and T&P etc required for proper completion of work.
Earth work in Filling in embankment in ordinary soil including ramming and dressing the surface to be required levels and slopes and also including all lift and Lead upto 1 km distance including cost of all Labour T&P etc complete as directed by Engineer-in- charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
technical_2093395.pdf
techsummary_2093395.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
TD3.pdf
Tender Documents • 2.26 MB
BOQ_2093395.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid