| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.6 LAdmitted-Finance | -22.62% | ₹10.6 L | L1 | Admitted-Finance |
| 2 | L2₹11.3 L+₹76,665.15 (7.25%)Admitted-Finance | -17.01% | ₹11.3 L+₹76,665.15 (7.25%) | L2 | Admitted-Finance |
| 3 | L3₹11.6 L+₹1.0 L (9.67%)Admitted-Finance | -15.14% | ₹11.6 L+₹1.0 L (9.67%) | L3 | Admitted-Finance |
| 4 | L4₹12.1 L+₹1.6 L (14.9%)Admitted-Finance | -11.11% | ₹12.1 L+₹1.6 L (14.9%) | L4 | Admitted-Finance |
| 5 | L5₹12.6 L+₹2.0 L (18.9%)Admitted-Finance | -7.99% | ₹12.6 L+₹2.0 L (18.9%) | L5 | Admitted-Finance |
Tender Value
₹13.7 L
EMD Value
₹27,320
Closing Date
7 Mar 2026, 6:00 pmClosed
COMMISSIONER MUNICIPAL COUNCIL BANSWARA
COMMISSIONER MUNICIPAL COUNCIL BANSWARA
Municipal Council Banswara Construction of archery ground wall and level at sports stadium
2026_DLB_542946_1
MUNICIPAL COUNCIL BANSWARA 17/2025-26/01
Open Tender
Civil Works
Percentage
90 days
COMMISSIONER MUNICIPAL COUNCIL BANSWARA
Municipal Council Banswara Construction of archery ground wall and level at sports stadium
2 documents required · 2 mandatory
₹500
COMMISSIONER MUNICIPAL COUNCIL BANSWARA
₹27,320
Yes
17 Mar 2026
27 Feb 2026
9 Mar 2026
27 Feb 2026
7 Mar 2026
27 Feb 2026
Brick work with FPS bricks of class designation 75 in superstructure above plinth level upto two stories in all shapes and sizes in : Cement mortar 1:6 (1 cement : 6 coarse sand)
Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
Providing corrugated G.S. sheet roofing including vertical/ curved surface fixed with polymer coated J or L hooks, bolts and nuts 8 mm diameter with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead and including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete upto any pitch in horizontal/ vertical or curved surfaces) excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. 0.63 mm thick with zinc coating not less than 275gm/m²
Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 12 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 1:6 (1 cement : 6 fine/ coarse sand)
Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including base coat of water proofing cement paint applied @ 2.20 kg/ 10 sqm).
Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/ 10 sqm of approved brand or manufacture
Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.
Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km)
Supplying and stacking good earth at site of work. Note: 1) Loading, unloading and carriage to be paid extra as per actual lead. 2) Earth measured in stacks will be reduced by 20% foe payment
Carriage of Materials by mechanical transport including loading, unloading and stacking :: Earth 5 Km
Dressing of earth work in surface excavation including cutting and filling upto 30cm depth including disposal of excavated earth upto 50m and lift upto 1.5 m.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.46 MB
BOQ_967922.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .