Loading…
Loading…
Tender Value
₹1.8 Cr
EMD Value
₹3.7 L
Closing Date
5 Sept 2026, 4:00 pm7d left
Superintending Engineer
PWD (RnB) Circle Doda - Kishtwar
Link road from Main road to Kapra
2026_PWDJK_321954_1
e-NIT No. 79 of 2026-27 Dt. 22-08-2026
Open Tender
Civil Works
Percentage
730 days
Bhaderwah
These documents are to be submitted as non-sensitive document from my document area of bidder
3 documents required · 3 mandatory
₹3,000
Superintending Engineer
₹3.7 L
Superintending Engineer
22 Aug 2026
22 Aug 2026
7 Sept 2026
22 Aug 2026
5 Sept 2026
22 Aug 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by (Hydraulic means) over areas exceeding 30 cm in depth 1.5mtr. In width as well as 10sq.m. On plan including disposal of excavated earth. Lead up to 25m and left up to 1.5 m disposed earth to be leveled and neatly dressed.All kinds of soil (80%) | 1 | Cum | - | - |
| 2 | Earthwork in excavation by (Hydraulic means) over areas exceeding 30 cm in depth 1.5mtr. In width as well as 10sq.m. On plan including disposal of excavated earth. Lead up to 25m and left up to 1.5 m disposed earth to be leveled and neatly dressed. Ordinary Rock (10%) | 1 | Cum | - | - |
| 3 | Earthwork in excavation by (Hydraulic means) over areas exceeding 30 cm in depth 1.5mtr. In width as well as 10sq.m. On plan including disposal of excavated earth. Lead up to 25m and left up to 1.5 m disposed earth to be leveled and neatly dressed.Hard Rock (10%) | 1 | Cum | - | - |
| 4 | Earth work in excavation over in trenches (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including dressing of sides and ramming of bottom lift up to 1.5m, and a lead of 25 mtrs. Including getting out the excavated soil as directed in all kinds of soil. | 0.2 | Cum | - | - |
| 5Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | |||||
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 1 | Cum | 1 | ₹1 |
| 7 | Providing and laying in position cement concrete (1:3:6) with 20 % Boulders including curing but excluding the cost of centring and shuttering. All work upto plinth level. | 1 | Cum | - | - |
| 8Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | |||||
| 9Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | |||||
| 10 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete.50 mm thick with 20mm nominal size stone aggregate. | - | Sqm | 1 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.62 MB
BOQ_1076684.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].